Concrete prefabricated box girder hoisting method and hoisting device

The invention discloses a concrete prefabricated box girder hoisting method and hoisting device, and relates to the field of concrete prefabricated box girder hoisting, the hoisting device comprises two sets of hoisting devices, each set of hoisting device comprises a cross beam, two connecting rods...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: FENG JIAWEI, ZHAO QIQUAN, QI RONGLIANG, QIAN LIWEI, KAN WEIXING, WANG HAO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator FENG JIAWEI
ZHAO QIQUAN
QI RONGLIANG
QIAN LIWEI
KAN WEIXING
WANG HAO
description The invention discloses a concrete prefabricated box girder hoisting method and hoisting device, and relates to the field of concrete prefabricated box girder hoisting, the hoisting device comprises two sets of hoisting devices, each set of hoisting device comprises a cross beam, two connecting rods and a balance beam, one ends of the two connecting rods are installed on the two sides of the cross beam through first fixing mechanisms, and the other ends of the two connecting rods are installed on the balance beam through second fixing mechanisms; one end of the connecting rod is arranged on the balance beam, the other end of the connecting rod is arranged on the two sides of the balance beam through a second fixing mechanism, a prefabricated box is placed on the cross beam, a mounting hole is formed in the cross beam, and the connecting rod penetrates through the mounting hole to limit the position of the prefabricated box placed on the cross beam; the two connecting rods can move freely in the length directi
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118619069A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118619069A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118619069A3</originalsourceid><addsrcrecordid>eNrjZHB1zs9LLkotSVUoKEpNS0wqykxOLElNUUjKr1BIzyxKSS1SyMjPLC7JzEtXyE0tychPUUjMS0GIpaSWZSan8jCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeGc_Q0MLM0NLAzNLR2Ni1AAADlwzcQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Concrete prefabricated box girder hoisting method and hoisting device</title><source>esp@cenet</source><creator>FENG JIAWEI ; ZHAO QIQUAN ; QI RONGLIANG ; QIAN LIWEI ; KAN WEIXING ; WANG HAO</creator><creatorcontrib>FENG JIAWEI ; ZHAO QIQUAN ; QI RONGLIANG ; QIAN LIWEI ; KAN WEIXING ; WANG HAO</creatorcontrib><description>The invention discloses a concrete prefabricated box girder hoisting method and hoisting device, and relates to the field of concrete prefabricated box girder hoisting, the hoisting device comprises two sets of hoisting devices, each set of hoisting device comprises a cross beam, two connecting rods and a balance beam, one ends of the two connecting rods are installed on the two sides of the cross beam through first fixing mechanisms, and the other ends of the two connecting rods are installed on the balance beam through second fixing mechanisms; one end of the connecting rod is arranged on the balance beam, the other end of the connecting rod is arranged on the two sides of the balance beam through a second fixing mechanism, a prefabricated box is placed on the cross beam, a mounting hole is formed in the cross beam, and the connecting rod penetrates through the mounting hole to limit the position of the prefabricated box placed on the cross beam; the two connecting rods can move freely in the length directi</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; CRANES ; FIXED CONSTRUCTIONS ; HAULING ; HOISTING ; LIFTING ; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES ; OR VIADUCTS ; PERFORMING OPERATIONS ; TRANSPORTING</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240910&amp;DB=EPODOC&amp;CC=CN&amp;NR=118619069A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25545,76296</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240910&amp;DB=EPODOC&amp;CC=CN&amp;NR=118619069A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>FENG JIAWEI</creatorcontrib><creatorcontrib>ZHAO QIQUAN</creatorcontrib><creatorcontrib>QI RONGLIANG</creatorcontrib><creatorcontrib>QIAN LIWEI</creatorcontrib><creatorcontrib>KAN WEIXING</creatorcontrib><creatorcontrib>WANG HAO</creatorcontrib><title>Concrete prefabricated box girder hoisting method and hoisting device</title><description>The invention discloses a concrete prefabricated box girder hoisting method and hoisting device, and relates to the field of concrete prefabricated box girder hoisting, the hoisting device comprises two sets of hoisting devices, each set of hoisting device comprises a cross beam, two connecting rods and a balance beam, one ends of the two connecting rods are installed on the two sides of the cross beam through first fixing mechanisms, and the other ends of the two connecting rods are installed on the balance beam through second fixing mechanisms; one end of the connecting rod is arranged on the balance beam, the other end of the connecting rod is arranged on the two sides of the balance beam through a second fixing mechanism, a prefabricated box is placed on the cross beam, a mounting hole is formed in the cross beam, and the connecting rod penetrates through the mounting hole to limit the position of the prefabricated box placed on the cross beam; the two connecting rods can move freely in the length directi</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>CRANES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>HAULING</subject><subject>HOISTING</subject><subject>LIFTING</subject><subject>LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES</subject><subject>OR VIADUCTS</subject><subject>PERFORMING OPERATIONS</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHB1zs9LLkotSVUoKEpNS0wqykxOLElNUUjKr1BIzyxKSS1SyMjPLC7JzEtXyE0tychPUUjMS0GIpaSWZSan8jCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeGc_Q0MLM0NLAzNLR2Ni1AAADlwzcQ</recordid><startdate>20240910</startdate><enddate>20240910</enddate><creator>FENG JIAWEI</creator><creator>ZHAO QIQUAN</creator><creator>QI RONGLIANG</creator><creator>QIAN LIWEI</creator><creator>KAN WEIXING</creator><creator>WANG HAO</creator><scope>EVB</scope></search><sort><creationdate>20240910</creationdate><title>Concrete prefabricated box girder hoisting method and hoisting device</title><author>FENG JIAWEI ; ZHAO QIQUAN ; QI RONGLIANG ; QIAN LIWEI ; KAN WEIXING ; WANG HAO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118619069A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>CRANES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>HAULING</topic><topic>HOISTING</topic><topic>LIFTING</topic><topic>LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES</topic><topic>OR VIADUCTS</topic><topic>PERFORMING OPERATIONS</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>FENG JIAWEI</creatorcontrib><creatorcontrib>ZHAO QIQUAN</creatorcontrib><creatorcontrib>QI RONGLIANG</creatorcontrib><creatorcontrib>QIAN LIWEI</creatorcontrib><creatorcontrib>KAN WEIXING</creatorcontrib><creatorcontrib>WANG HAO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>FENG JIAWEI</au><au>ZHAO QIQUAN</au><au>QI RONGLIANG</au><au>QIAN LIWEI</au><au>KAN WEIXING</au><au>WANG HAO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Concrete prefabricated box girder hoisting method and hoisting device</title><date>2024-09-10</date><risdate>2024</risdate><abstract>The invention discloses a concrete prefabricated box girder hoisting method and hoisting device, and relates to the field of concrete prefabricated box girder hoisting, the hoisting device comprises two sets of hoisting devices, each set of hoisting device comprises a cross beam, two connecting rods and a balance beam, one ends of the two connecting rods are installed on the two sides of the cross beam through first fixing mechanisms, and the other ends of the two connecting rods are installed on the balance beam through second fixing mechanisms; one end of the connecting rod is arranged on the balance beam, the other end of the connecting rod is arranged on the two sides of the balance beam through a second fixing mechanism, a prefabricated box is placed on the cross beam, a mounting hole is formed in the cross beam, and the connecting rod penetrates through the mounting hole to limit the position of the prefabricated box placed on the cross beam; the two connecting rods can move freely in the length directi</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118619069A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
CRANES
FIXED CONSTRUCTIONS
HAULING
HOISTING
LIFTING
LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES
OR VIADUCTS
PERFORMING OPERATIONS
TRANSPORTING
title Concrete prefabricated box girder hoisting method and hoisting device
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-18T23%3A03%3A54IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=FENG%20JIAWEI&rft.date=2024-09-10&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118619069A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true