Engineering cost management system
The invention relates to the technical field of data processing, and discloses an engineering cost management system. The system comprises a design budget input module used for establishing milestone code information of a project, budget code information of each level and project trend information a...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | LUO HUIHENG WANG GUOXUN HE WEN JIN HEPING BAI LU DONG ZHENYING |
description | The invention relates to the technical field of data processing, and discloses an engineering cost management system. The system comprises a design budget input module used for establishing milestone code information of a project, budget code information of each level and project trend information according to input of a user, and generating a design budget prediction result corresponding to the project; the execution budget input module is used for generating an investment data analysis table corresponding to the project completion progress according to the milestone code information of the project, the budget code information of each level and the execution budget static investment conversion coefficient and the price list input by the user; the budget modification module is used for modifying the corresponding budget code information and the project trend information according to the budget modification information input by the user; and the investment data generation module is used for recording the proje |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118608094A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118608094A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118608094A3</originalsourceid><addsrcrecordid>eNrjZFByzUvPzEtNLcrMS1dIzi8uUchNzEtMT81NzStRKK4sLknN5WFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8c5-hoYWZgYWBpYmjsbEqAEAzr8mWQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Engineering cost management system</title><source>esp@cenet</source><creator>LUO HUIHENG ; WANG GUOXUN ; HE WEN ; JIN HEPING ; BAI LU ; DONG ZHENYING</creator><creatorcontrib>LUO HUIHENG ; WANG GUOXUN ; HE WEN ; JIN HEPING ; BAI LU ; DONG ZHENYING</creatorcontrib><description>The invention relates to the technical field of data processing, and discloses an engineering cost management system. The system comprises a design budget input module used for establishing milestone code information of a project, budget code information of each level and project trend information according to input of a user, and generating a design budget prediction result corresponding to the project; the execution budget input module is used for generating an investment data analysis table corresponding to the project completion progress according to the milestone code information of the project, the budget code information of each level and the execution budget static investment conversion coefficient and the price list input by the user; the budget modification module is used for modifying the corresponding budget code information and the project trend information according to the budget modification information input by the user; and the investment data generation module is used for recording the proje</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240906&DB=EPODOC&CC=CN&NR=118608094A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76318</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240906&DB=EPODOC&CC=CN&NR=118608094A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LUO HUIHENG</creatorcontrib><creatorcontrib>WANG GUOXUN</creatorcontrib><creatorcontrib>HE WEN</creatorcontrib><creatorcontrib>JIN HEPING</creatorcontrib><creatorcontrib>BAI LU</creatorcontrib><creatorcontrib>DONG ZHENYING</creatorcontrib><title>Engineering cost management system</title><description>The invention relates to the technical field of data processing, and discloses an engineering cost management system. The system comprises a design budget input module used for establishing milestone code information of a project, budget code information of each level and project trend information according to input of a user, and generating a design budget prediction result corresponding to the project; the execution budget input module is used for generating an investment data analysis table corresponding to the project completion progress according to the milestone code information of the project, the budget code information of each level and the execution budget static investment conversion coefficient and the price list input by the user; the budget modification module is used for modifying the corresponding budget code information and the project trend information according to the budget modification information input by the user; and the investment data generation module is used for recording the proje</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFByzUvPzEtNLcrMS1dIzi8uUchNzEtMT81NzStRKK4sLknN5WFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8c5-hoYWZgYWBpYmjsbEqAEAzr8mWQ</recordid><startdate>20240906</startdate><enddate>20240906</enddate><creator>LUO HUIHENG</creator><creator>WANG GUOXUN</creator><creator>HE WEN</creator><creator>JIN HEPING</creator><creator>BAI LU</creator><creator>DONG ZHENYING</creator><scope>EVB</scope></search><sort><creationdate>20240906</creationdate><title>Engineering cost management system</title><author>LUO HUIHENG ; WANG GUOXUN ; HE WEN ; JIN HEPING ; BAI LU ; DONG ZHENYING</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118608094A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>LUO HUIHENG</creatorcontrib><creatorcontrib>WANG GUOXUN</creatorcontrib><creatorcontrib>HE WEN</creatorcontrib><creatorcontrib>JIN HEPING</creatorcontrib><creatorcontrib>BAI LU</creatorcontrib><creatorcontrib>DONG ZHENYING</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LUO HUIHENG</au><au>WANG GUOXUN</au><au>HE WEN</au><au>JIN HEPING</au><au>BAI LU</au><au>DONG ZHENYING</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Engineering cost management system</title><date>2024-09-06</date><risdate>2024</risdate><abstract>The invention relates to the technical field of data processing, and discloses an engineering cost management system. The system comprises a design budget input module used for establishing milestone code information of a project, budget code information of each level and project trend information according to input of a user, and generating a design budget prediction result corresponding to the project; the execution budget input module is used for generating an investment data analysis table corresponding to the project completion progress according to the milestone code information of the project, the budget code information of each level and the execution budget static investment conversion coefficient and the price list input by the user; the budget modification module is used for modifying the corresponding budget code information and the project trend information according to the budget modification information input by the user; and the investment data generation module is used for recording the proje</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN118608094A |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | Engineering cost management system |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-13T06%3A42%3A00IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LUO%20HUIHENG&rft.date=2024-09-06&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118608094A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |