Shield construction early warning method, device and equipment and storage medium

The invention provides a shield construction early warning method and device, electronic equipment, a computer program and a storage medium, and the method comprises the steps: building an integrated three-dimensional geological model through obtaining the geological data and environment data of a t...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: DUAN GUOXIANG, ZHU XIAOQIANG, LIU ZHIFANG, ZHANG QINGHUA, ZHANG QIANG, ZHOU ZHIYUAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator DUAN GUOXIANG
ZHU XIAOQIANG
LIU ZHIFANG
ZHANG QINGHUA
ZHANG QIANG
ZHOU ZHIYUAN
description The invention provides a shield construction early warning method and device, electronic equipment, a computer program and a storage medium, and the method comprises the steps: building an integrated three-dimensional geological model through obtaining the geological data and environment data of a target construction region; obtaining shield construction data, and fusing the shield construction data with the integrated three-dimensional geological model to obtain a three-dimensional shield construction visual model; according to the three-dimensional shield construction visualization model, a current shield construction scene is evaluated through a fuzzy comprehensive evaluation method; and generating a shield construction early warning prompt according to the evaluation result of the current shield construction scene. According to the method, three-dimensional modeling and visual display are carried out on the shield construction area, so that construction decision making and construction scheme optimization
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118601588A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118601588A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118601588A3</originalsourceid><addsrcrecordid>eNqNyjsKAjEURuE0FqLu4dorGERJK4NiJYj2Q0h-ZwLJzZiH4u4VcQFWhwPfWJwvvYO3ZCLnkqopLjJBJ_-ip07suKOA0ke7IIuHMyDNlnCvbgjg8r1cYtIdPtC6GqZidNM-Y_brRMwP-2tzXGKILfKgDRilbU5Squ1KbpTarf8xb_qKN-w</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Shield construction early warning method, device and equipment and storage medium</title><source>esp@cenet</source><creator>DUAN GUOXIANG ; ZHU XIAOQIANG ; LIU ZHIFANG ; ZHANG QINGHUA ; ZHANG QIANG ; ZHOU ZHIYUAN</creator><creatorcontrib>DUAN GUOXIANG ; ZHU XIAOQIANG ; LIU ZHIFANG ; ZHANG QINGHUA ; ZHANG QIANG ; ZHOU ZHIYUAN</creatorcontrib><description>The invention provides a shield construction early warning method and device, electronic equipment, a computer program and a storage medium, and the method comprises the steps: building an integrated three-dimensional geological model through obtaining the geological data and environment data of a target construction region; obtaining shield construction data, and fusing the shield construction data with the integrated three-dimensional geological model to obtain a three-dimensional shield construction visual model; according to the three-dimensional shield construction visualization model, a current shield construction scene is evaluated through a fuzzy comprehensive evaluation method; and generating a shield construction early warning prompt according to the evaluation result of the current shield construction scene. According to the method, three-dimensional modeling and visual display are carried out on the shield construction area, so that construction decision making and construction scheme optimization</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; EARTH DRILLING ; ELECTRIC DIGITAL DATA PROCESSING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; PHYSICS ; SHAFTS ; TUNNELS</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240906&amp;DB=EPODOC&amp;CC=CN&amp;NR=118601588A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25569,76552</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240906&amp;DB=EPODOC&amp;CC=CN&amp;NR=118601588A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>DUAN GUOXIANG</creatorcontrib><creatorcontrib>ZHU XIAOQIANG</creatorcontrib><creatorcontrib>LIU ZHIFANG</creatorcontrib><creatorcontrib>ZHANG QINGHUA</creatorcontrib><creatorcontrib>ZHANG QIANG</creatorcontrib><creatorcontrib>ZHOU ZHIYUAN</creatorcontrib><title>Shield construction early warning method, device and equipment and storage medium</title><description>The invention provides a shield construction early warning method and device, electronic equipment, a computer program and a storage medium, and the method comprises the steps: building an integrated three-dimensional geological model through obtaining the geological data and environment data of a target construction region; obtaining shield construction data, and fusing the shield construction data with the integrated three-dimensional geological model to obtain a three-dimensional shield construction visual model; according to the three-dimensional shield construction visualization model, a current shield construction scene is evaluated through a fuzzy comprehensive evaluation method; and generating a shield construction early warning prompt according to the evaluation result of the current shield construction scene. According to the method, three-dimensional modeling and visual display are carried out on the shield construction area, so that construction decision making and construction scheme optimization</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>EARTH DRILLING</subject><subject>ELECTRIC DIGITAL DATA PROCESSING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>PHYSICS</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyjsKAjEURuE0FqLu4dorGERJK4NiJYj2Q0h-ZwLJzZiH4u4VcQFWhwPfWJwvvYO3ZCLnkqopLjJBJ_-ip07suKOA0ke7IIuHMyDNlnCvbgjg8r1cYtIdPtC6GqZidNM-Y_brRMwP-2tzXGKILfKgDRilbU5Squ1KbpTarf8xb_qKN-w</recordid><startdate>20240906</startdate><enddate>20240906</enddate><creator>DUAN GUOXIANG</creator><creator>ZHU XIAOQIANG</creator><creator>LIU ZHIFANG</creator><creator>ZHANG QINGHUA</creator><creator>ZHANG QIANG</creator><creator>ZHOU ZHIYUAN</creator><scope>EVB</scope></search><sort><creationdate>20240906</creationdate><title>Shield construction early warning method, device and equipment and storage medium</title><author>DUAN GUOXIANG ; ZHU XIAOQIANG ; LIU ZHIFANG ; ZHANG QINGHUA ; ZHANG QIANG ; ZHOU ZHIYUAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118601588A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>EARTH DRILLING</topic><topic>ELECTRIC DIGITAL DATA PROCESSING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>PHYSICS</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>DUAN GUOXIANG</creatorcontrib><creatorcontrib>ZHU XIAOQIANG</creatorcontrib><creatorcontrib>LIU ZHIFANG</creatorcontrib><creatorcontrib>ZHANG QINGHUA</creatorcontrib><creatorcontrib>ZHANG QIANG</creatorcontrib><creatorcontrib>ZHOU ZHIYUAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>DUAN GUOXIANG</au><au>ZHU XIAOQIANG</au><au>LIU ZHIFANG</au><au>ZHANG QINGHUA</au><au>ZHANG QIANG</au><au>ZHOU ZHIYUAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Shield construction early warning method, device and equipment and storage medium</title><date>2024-09-06</date><risdate>2024</risdate><abstract>The invention provides a shield construction early warning method and device, electronic equipment, a computer program and a storage medium, and the method comprises the steps: building an integrated three-dimensional geological model through obtaining the geological data and environment data of a target construction region; obtaining shield construction data, and fusing the shield construction data with the integrated three-dimensional geological model to obtain a three-dimensional shield construction visual model; according to the three-dimensional shield construction visualization model, a current shield construction scene is evaluated through a fuzzy comprehensive evaluation method; and generating a shield construction early warning prompt according to the evaluation result of the current shield construction scene. According to the method, three-dimensional modeling and visual display are carried out on the shield construction area, so that construction decision making and construction scheme optimization</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118601588A
source esp@cenet
subjects CALCULATING
COMPUTING
COUNTING
EARTH DRILLING
ELECTRIC DIGITAL DATA PROCESSING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MINING
PHYSICS
SHAFTS
TUNNELS
title Shield construction early warning method, device and equipment and storage medium
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-16T07%3A42%3A49IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=DUAN%20GUOXIANG&rft.date=2024-09-06&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118601588A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true