Three-step and upper-step combined excavation construction method for super-large-span tunnel

The invention relates to the technical field of ultra-large-span tunnel construction, in particular to a three-step and upper-step combined excavation construction method for an ultra-large-span tunnel, the stability of surrounding rock can be effectively guaranteed through three-step and upper-step...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG LEI, SUN JIZHEN, WANG FENGXI, LI XING, SHAO CHENGMENG, LI JIANCHUN, JIANG GUOSHENG, LIU TAO, SHEN YUEHUI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WANG LEI
SUN JIZHEN
WANG FENGXI
LI XING
SHAO CHENGMENG
LI JIANCHUN
JIANG GUOSHENG
LIU TAO
SHEN YUEHUI
description The invention relates to the technical field of ultra-large-span tunnel construction, in particular to a three-step and upper-step combined excavation construction method for an ultra-large-span tunnel, the stability of surrounding rock can be effectively guaranteed through three-step and upper-step combined excavation construction, meanwhile, a self-propelled hydraulic inverted arch trestle is used in a matched mode, and the construction efficiency is improved. And a common bearing structure of the surrounding rock and the primary support can be formed as soon as possible, so that the safety of tunnel construction is improved. According to the method, the temporary support engineering amount in the tunnel excavation process is reduced, the total construction cost of the engineering is reduced, the construction progress is accelerated, the cost is effectively saved, a common bearing structure of the surrounding rock and the primary support is formed as soon as possible, the temporary support engineering amoun
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118601582A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118601582A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118601582A3</originalsourceid><addsrcrecordid>eNqNjMsKwjAURLtxIeo_XD-gYBSlWymKK1fdSonJ9AHpTchD_Hzj4wNcDWc4M_Pi1gweKEOEI8maknPwX1R2uo8MTXgq-ZBxtJw7DtEn9YEJcbCaOusppPfMSN_nLyeZYmKGWRazTpqA1S8Xxfp8aupLCWdbZFGBEdv6KkR12Ih9tT3u_nFeQB48zw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Three-step and upper-step combined excavation construction method for super-large-span tunnel</title><source>esp@cenet</source><creator>WANG LEI ; SUN JIZHEN ; WANG FENGXI ; LI XING ; SHAO CHENGMENG ; LI JIANCHUN ; JIANG GUOSHENG ; LIU TAO ; SHEN YUEHUI</creator><creatorcontrib>WANG LEI ; SUN JIZHEN ; WANG FENGXI ; LI XING ; SHAO CHENGMENG ; LI JIANCHUN ; JIANG GUOSHENG ; LIU TAO ; SHEN YUEHUI</creatorcontrib><description>The invention relates to the technical field of ultra-large-span tunnel construction, in particular to a three-step and upper-step combined excavation construction method for an ultra-large-span tunnel, the stability of surrounding rock can be effectively guaranteed through three-step and upper-step combined excavation construction, meanwhile, a self-propelled hydraulic inverted arch trestle is used in a matched mode, and the construction efficiency is improved. And a common bearing structure of the surrounding rock and the primary support can be formed as soon as possible, so that the safety of tunnel construction is improved. According to the method, the temporary support engineering amount in the tunnel excavation process is reduced, the total construction cost of the engineering is reduced, the construction progress is accelerated, the cost is effectively saved, a common bearing structure of the surrounding rock and the primary support is formed as soon as possible, the temporary support engineering amoun</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240906&amp;DB=EPODOC&amp;CC=CN&amp;NR=118601582A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240906&amp;DB=EPODOC&amp;CC=CN&amp;NR=118601582A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG LEI</creatorcontrib><creatorcontrib>SUN JIZHEN</creatorcontrib><creatorcontrib>WANG FENGXI</creatorcontrib><creatorcontrib>LI XING</creatorcontrib><creatorcontrib>SHAO CHENGMENG</creatorcontrib><creatorcontrib>LI JIANCHUN</creatorcontrib><creatorcontrib>JIANG GUOSHENG</creatorcontrib><creatorcontrib>LIU TAO</creatorcontrib><creatorcontrib>SHEN YUEHUI</creatorcontrib><title>Three-step and upper-step combined excavation construction method for super-large-span tunnel</title><description>The invention relates to the technical field of ultra-large-span tunnel construction, in particular to a three-step and upper-step combined excavation construction method for an ultra-large-span tunnel, the stability of surrounding rock can be effectively guaranteed through three-step and upper-step combined excavation construction, meanwhile, a self-propelled hydraulic inverted arch trestle is used in a matched mode, and the construction efficiency is improved. And a common bearing structure of the surrounding rock and the primary support can be formed as soon as possible, so that the safety of tunnel construction is improved. According to the method, the temporary support engineering amount in the tunnel excavation process is reduced, the total construction cost of the engineering is reduced, the construction progress is accelerated, the cost is effectively saved, a common bearing structure of the surrounding rock and the primary support is formed as soon as possible, the temporary support engineering amoun</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjMsKwjAURLtxIeo_XD-gYBSlWymKK1fdSonJ9AHpTchD_Hzj4wNcDWc4M_Pi1gweKEOEI8maknPwX1R2uo8MTXgq-ZBxtJw7DtEn9YEJcbCaOusppPfMSN_nLyeZYmKGWRazTpqA1S8Xxfp8aupLCWdbZFGBEdv6KkR12Ih9tT3u_nFeQB48zw</recordid><startdate>20240906</startdate><enddate>20240906</enddate><creator>WANG LEI</creator><creator>SUN JIZHEN</creator><creator>WANG FENGXI</creator><creator>LI XING</creator><creator>SHAO CHENGMENG</creator><creator>LI JIANCHUN</creator><creator>JIANG GUOSHENG</creator><creator>LIU TAO</creator><creator>SHEN YUEHUI</creator><scope>EVB</scope></search><sort><creationdate>20240906</creationdate><title>Three-step and upper-step combined excavation construction method for super-large-span tunnel</title><author>WANG LEI ; SUN JIZHEN ; WANG FENGXI ; LI XING ; SHAO CHENGMENG ; LI JIANCHUN ; JIANG GUOSHENG ; LIU TAO ; SHEN YUEHUI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118601582A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG LEI</creatorcontrib><creatorcontrib>SUN JIZHEN</creatorcontrib><creatorcontrib>WANG FENGXI</creatorcontrib><creatorcontrib>LI XING</creatorcontrib><creatorcontrib>SHAO CHENGMENG</creatorcontrib><creatorcontrib>LI JIANCHUN</creatorcontrib><creatorcontrib>JIANG GUOSHENG</creatorcontrib><creatorcontrib>LIU TAO</creatorcontrib><creatorcontrib>SHEN YUEHUI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG LEI</au><au>SUN JIZHEN</au><au>WANG FENGXI</au><au>LI XING</au><au>SHAO CHENGMENG</au><au>LI JIANCHUN</au><au>JIANG GUOSHENG</au><au>LIU TAO</au><au>SHEN YUEHUI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Three-step and upper-step combined excavation construction method for super-large-span tunnel</title><date>2024-09-06</date><risdate>2024</risdate><abstract>The invention relates to the technical field of ultra-large-span tunnel construction, in particular to a three-step and upper-step combined excavation construction method for an ultra-large-span tunnel, the stability of surrounding rock can be effectively guaranteed through three-step and upper-step combined excavation construction, meanwhile, a self-propelled hydraulic inverted arch trestle is used in a matched mode, and the construction efficiency is improved. And a common bearing structure of the surrounding rock and the primary support can be formed as soon as possible, so that the safety of tunnel construction is improved. According to the method, the temporary support engineering amount in the tunnel excavation process is reduced, the total construction cost of the engineering is reduced, the construction progress is accelerated, the cost is effectively saved, a common bearing structure of the surrounding rock and the primary support is formed as soon as possible, the temporary support engineering amoun</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118601582A
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
TUNNELS
title Three-step and upper-step combined excavation construction method for super-large-span tunnel
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-08T14%3A24%3A23IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20LEI&rft.date=2024-09-06&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118601582A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true