Line laying pipeline butt joint equipment for electric power construction site

The invention provides line laying pipeline butt joint equipment for an electric power construction site, and belongs to the technical field of electric power construction.The line laying pipeline butt joint equipment is composed of a U-shaped main rack, a driving mechanism, a pipeline clamping and...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHANG HONGJIONG, YUAN JIE, GUO TAILONG, YAN YANG, WANG JIA, ZHANG JIAN, ZHU YUE, ZHAO FEI, LU JIYUAN, ZHANG NAN, WANG SICHEN, ZHANG GUORUI, CAO CHENGZHANG, LI NUOHAN, GUO KAI, MA WENYING, SUN YONGWEN, WU TAO, LI LIUXUE, LU YUZI, SUN LINTONG, SONG JIAJU
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHANG HONGJIONG
YUAN JIE
GUO TAILONG
YAN YANG
WANG JIA
ZHANG JIAN
ZHU YUE
ZHAO FEI
LU JIYUAN
ZHANG NAN
WANG SICHEN
ZHANG GUORUI
CAO CHENGZHANG
LI NUOHAN
GUO KAI
MA WENYING
SUN YONGWEN
WU TAO
LI LIUXUE
LU YUZI
SUN LINTONG
SONG JIAJU
description The invention provides line laying pipeline butt joint equipment for an electric power construction site, and belongs to the technical field of electric power construction.The line laying pipeline butt joint equipment is composed of a U-shaped main rack, a driving mechanism, a pipeline clamping and butt joint mechanism and a pipeline welding mechanism, according to the line laying pipeline butt joint equipment for the electric power construction site, through the highly integrated design, automatic clamping, accurate butt joint and efficient welding of pipelines are achieved, the efficiency and quality of electric power line laying are greatly improved, the U-shaped main rack structure is adopted, and the equipment is convenient to use and high in practicability. And the driving mechanism and the pipeline clamping and butting mechanism are arranged, so that the position of the pipeline can be automatically adjusted, and the accuracy of pipeline butting is ensured. In addition, through the arranged pipeline we
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118596587A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118596587A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118596587A3</originalsourceid><addsrcrecordid>eNqNirEKAjEQBdNYiPoP6wdYHHJ6lnIoFnKV_RHDO9kjZmOyQfx7FfwAq5mBmZruzAHk7YvDjSJH-G9fiyqNwkEJj8Lxjo8NkggeThM7ivJEIichaypOWQJlVszNZLA-Y_HjzCyPh0t7WiFKjxytQ4D2bVdVTb3b1M12v_7neQNfTzdV</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Line laying pipeline butt joint equipment for electric power construction site</title><source>esp@cenet</source><creator>ZHANG HONGJIONG ; YUAN JIE ; GUO TAILONG ; YAN YANG ; WANG JIA ; ZHANG JIAN ; ZHU YUE ; ZHAO FEI ; LU JIYUAN ; ZHANG NAN ; WANG SICHEN ; ZHANG GUORUI ; CAO CHENGZHANG ; LI NUOHAN ; GUO KAI ; MA WENYING ; SUN YONGWEN ; WU TAO ; LI LIUXUE ; LU YUZI ; SUN LINTONG ; SONG JIAJU</creator><creatorcontrib>ZHANG HONGJIONG ; YUAN JIE ; GUO TAILONG ; YAN YANG ; WANG JIA ; ZHANG JIAN ; ZHU YUE ; ZHAO FEI ; LU JIYUAN ; ZHANG NAN ; WANG SICHEN ; ZHANG GUORUI ; CAO CHENGZHANG ; LI NUOHAN ; GUO KAI ; MA WENYING ; SUN YONGWEN ; WU TAO ; LI LIUXUE ; LU YUZI ; SUN LINTONG ; SONG JIAJU</creatorcontrib><description>The invention provides line laying pipeline butt joint equipment for an electric power construction site, and belongs to the technical field of electric power construction.The line laying pipeline butt joint equipment is composed of a U-shaped main rack, a driving mechanism, a pipeline clamping and butt joint mechanism and a pipeline welding mechanism, according to the line laying pipeline butt joint equipment for the electric power construction site, through the highly integrated design, automatic clamping, accurate butt joint and efficient welding of pipelines are achieved, the efficiency and quality of electric power line laying are greatly improved, the U-shaped main rack structure is adopted, and the equipment is convenient to use and high in practicability. And the driving mechanism and the pipeline clamping and butting mechanism are arranged, so that the position of the pipeline can be automatically adjusted, and the accuracy of pipeline butting is ensured. In addition, through the arranged pipeline we</description><language>chi ; eng</language><subject>AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; ELECTRICITY ; GENERATION ; INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINEDOPTICAL AND ELECTRIC CABLES OR LINES ; PERFORMING OPERATIONS ; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDEDFOR ; SHAPING OR JOINING OF PLASTICS ; TRANSPORTING ; WORKING OF PLASTICS ; WORKING OF SUBSTANCES IN A PLASTIC STATE, IN GENERAL</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240906&amp;DB=EPODOC&amp;CC=CN&amp;NR=118596587A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240906&amp;DB=EPODOC&amp;CC=CN&amp;NR=118596587A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG HONGJIONG</creatorcontrib><creatorcontrib>YUAN JIE</creatorcontrib><creatorcontrib>GUO TAILONG</creatorcontrib><creatorcontrib>YAN YANG</creatorcontrib><creatorcontrib>WANG JIA</creatorcontrib><creatorcontrib>ZHANG JIAN</creatorcontrib><creatorcontrib>ZHU YUE</creatorcontrib><creatorcontrib>ZHAO FEI</creatorcontrib><creatorcontrib>LU JIYUAN</creatorcontrib><creatorcontrib>ZHANG NAN</creatorcontrib><creatorcontrib>WANG SICHEN</creatorcontrib><creatorcontrib>ZHANG GUORUI</creatorcontrib><creatorcontrib>CAO CHENGZHANG</creatorcontrib><creatorcontrib>LI NUOHAN</creatorcontrib><creatorcontrib>GUO KAI</creatorcontrib><creatorcontrib>MA WENYING</creatorcontrib><creatorcontrib>SUN YONGWEN</creatorcontrib><creatorcontrib>WU TAO</creatorcontrib><creatorcontrib>LI LIUXUE</creatorcontrib><creatorcontrib>LU YUZI</creatorcontrib><creatorcontrib>SUN LINTONG</creatorcontrib><creatorcontrib>SONG JIAJU</creatorcontrib><title>Line laying pipeline butt joint equipment for electric power construction site</title><description>The invention provides line laying pipeline butt joint equipment for an electric power construction site, and belongs to the technical field of electric power construction.The line laying pipeline butt joint equipment is composed of a U-shaped main rack, a driving mechanism, a pipeline clamping and butt joint mechanism and a pipeline welding mechanism, according to the line laying pipeline butt joint equipment for the electric power construction site, through the highly integrated design, automatic clamping, accurate butt joint and efficient welding of pipelines are achieved, the efficiency and quality of electric power line laying are greatly improved, the U-shaped main rack structure is adopted, and the equipment is convenient to use and high in practicability. And the driving mechanism and the pipeline clamping and butting mechanism are arranged, so that the position of the pipeline can be automatically adjusted, and the accuracy of pipeline butting is ensured. In addition, through the arranged pipeline we</description><subject>AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>ELECTRICITY</subject><subject>GENERATION</subject><subject>INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINEDOPTICAL AND ELECTRIC CABLES OR LINES</subject><subject>PERFORMING OPERATIONS</subject><subject>SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDEDFOR</subject><subject>SHAPING OR JOINING OF PLASTICS</subject><subject>TRANSPORTING</subject><subject>WORKING OF PLASTICS</subject><subject>WORKING OF SUBSTANCES IN A PLASTIC STATE, IN GENERAL</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNirEKAjEQBdNYiPoP6wdYHHJ6lnIoFnKV_RHDO9kjZmOyQfx7FfwAq5mBmZruzAHk7YvDjSJH-G9fiyqNwkEJj8Lxjo8NkggeThM7ivJEIichaypOWQJlVszNZLA-Y_HjzCyPh0t7WiFKjxytQ4D2bVdVTb3b1M12v_7neQNfTzdV</recordid><startdate>20240906</startdate><enddate>20240906</enddate><creator>ZHANG HONGJIONG</creator><creator>YUAN JIE</creator><creator>GUO TAILONG</creator><creator>YAN YANG</creator><creator>WANG JIA</creator><creator>ZHANG JIAN</creator><creator>ZHU YUE</creator><creator>ZHAO FEI</creator><creator>LU JIYUAN</creator><creator>ZHANG NAN</creator><creator>WANG SICHEN</creator><creator>ZHANG GUORUI</creator><creator>CAO CHENGZHANG</creator><creator>LI NUOHAN</creator><creator>GUO KAI</creator><creator>MA WENYING</creator><creator>SUN YONGWEN</creator><creator>WU TAO</creator><creator>LI LIUXUE</creator><creator>LU YUZI</creator><creator>SUN LINTONG</creator><creator>SONG JIAJU</creator><scope>EVB</scope></search><sort><creationdate>20240906</creationdate><title>Line laying pipeline butt joint equipment for electric power construction site</title><author>ZHANG HONGJIONG ; YUAN JIE ; GUO TAILONG ; YAN YANG ; WANG JIA ; ZHANG JIAN ; ZHU YUE ; ZHAO FEI ; LU JIYUAN ; ZHANG NAN ; WANG SICHEN ; ZHANG GUORUI ; CAO CHENGZHANG ; LI NUOHAN ; GUO KAI ; MA WENYING ; SUN YONGWEN ; WU TAO ; LI LIUXUE ; LU YUZI ; SUN LINTONG ; SONG JIAJU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118596587A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>ELECTRICITY</topic><topic>GENERATION</topic><topic>INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINEDOPTICAL AND ELECTRIC CABLES OR LINES</topic><topic>PERFORMING OPERATIONS</topic><topic>SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDEDFOR</topic><topic>SHAPING OR JOINING OF PLASTICS</topic><topic>TRANSPORTING</topic><topic>WORKING OF PLASTICS</topic><topic>WORKING OF SUBSTANCES IN A PLASTIC STATE, IN GENERAL</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG HONGJIONG</creatorcontrib><creatorcontrib>YUAN JIE</creatorcontrib><creatorcontrib>GUO TAILONG</creatorcontrib><creatorcontrib>YAN YANG</creatorcontrib><creatorcontrib>WANG JIA</creatorcontrib><creatorcontrib>ZHANG JIAN</creatorcontrib><creatorcontrib>ZHU YUE</creatorcontrib><creatorcontrib>ZHAO FEI</creatorcontrib><creatorcontrib>LU JIYUAN</creatorcontrib><creatorcontrib>ZHANG NAN</creatorcontrib><creatorcontrib>WANG SICHEN</creatorcontrib><creatorcontrib>ZHANG GUORUI</creatorcontrib><creatorcontrib>CAO CHENGZHANG</creatorcontrib><creatorcontrib>LI NUOHAN</creatorcontrib><creatorcontrib>GUO KAI</creatorcontrib><creatorcontrib>MA WENYING</creatorcontrib><creatorcontrib>SUN YONGWEN</creatorcontrib><creatorcontrib>WU TAO</creatorcontrib><creatorcontrib>LI LIUXUE</creatorcontrib><creatorcontrib>LU YUZI</creatorcontrib><creatorcontrib>SUN LINTONG</creatorcontrib><creatorcontrib>SONG JIAJU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG HONGJIONG</au><au>YUAN JIE</au><au>GUO TAILONG</au><au>YAN YANG</au><au>WANG JIA</au><au>ZHANG JIAN</au><au>ZHU YUE</au><au>ZHAO FEI</au><au>LU JIYUAN</au><au>ZHANG NAN</au><au>WANG SICHEN</au><au>ZHANG GUORUI</au><au>CAO CHENGZHANG</au><au>LI NUOHAN</au><au>GUO KAI</au><au>MA WENYING</au><au>SUN YONGWEN</au><au>WU TAO</au><au>LI LIUXUE</au><au>LU YUZI</au><au>SUN LINTONG</au><au>SONG JIAJU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Line laying pipeline butt joint equipment for electric power construction site</title><date>2024-09-06</date><risdate>2024</risdate><abstract>The invention provides line laying pipeline butt joint equipment for an electric power construction site, and belongs to the technical field of electric power construction.The line laying pipeline butt joint equipment is composed of a U-shaped main rack, a driving mechanism, a pipeline clamping and butt joint mechanism and a pipeline welding mechanism, according to the line laying pipeline butt joint equipment for the electric power construction site, through the highly integrated design, automatic clamping, accurate butt joint and efficient welding of pipelines are achieved, the efficiency and quality of electric power line laying are greatly improved, the U-shaped main rack structure is adopted, and the equipment is convenient to use and high in practicability. And the driving mechanism and the pipeline clamping and butting mechanism are arranged, so that the position of the pipeline can be automatically adjusted, and the accuracy of pipeline butting is ensured. In addition, through the arranged pipeline we</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118596587A
source esp@cenet
subjects AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
ELECTRICITY
GENERATION
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINEDOPTICAL AND ELECTRIC CABLES OR LINES
PERFORMING OPERATIONS
SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDEDFOR
SHAPING OR JOINING OF PLASTICS
TRANSPORTING
WORKING OF PLASTICS
WORKING OF SUBSTANCES IN A PLASTIC STATE, IN GENERAL
title Line laying pipeline butt joint equipment for electric power construction site
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-05T06%3A36%3A59IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20HONGJIONG&rft.date=2024-09-06&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118596587A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true