Construction method for long-distance large-span tunnel and ultra-small clear distance tunnel

The invention relates to the technical field of tunnel construction, and discloses a long-distance and large-span tunnel ultra-small clear distance tunnel construction method, which comprises the following steps of: firstly excavating parts I and II by adopting a controlled blasting method for a fir...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHEN WANLI, ZHANG MINGCHEN, ZHANG PENG, CHEN LIPENG, FU SHUXUE, SONG XIAO, LI LEI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator CHEN WANLI
ZHANG MINGCHEN
ZHANG PENG
CHEN LIPENG
FU SHUXUE
SONG XIAO
LI LEI
description The invention relates to the technical field of tunnel construction, and discloses a long-distance and large-span tunnel ultra-small clear distance tunnel construction method, which comprises the following steps of: firstly excavating parts I and II by adopting a controlled blasting method for a first tunnel, then excavating parts III and IV by adopting the controlled blasting method, and forming a blasting free face after excavating the parts I and II; in the excavation engineering of the part III and the part IV, a reinforcing measure is adopted for conducting grouting reinforcement on a middle rock clamping arch part, after first support construction of the first tunnel is completed, foam concrete with the damping effect of the first tunnel is poured, after the tunnel strength meets the design requirement, a second lining structure of the first tunnel is poured, and the excavation step sequence of the later tunnel is similar to that of the first tunnel; the V and the VI are excavated through a controlled b
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118582211A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118582211A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118582211A3</originalsourceid><addsrcrecordid>eNqNjLEKwjAQQLs4iPoP5wdkSEXoKkFxcnKVciTXWrjeleTy_wqKs9Nb3nvr5hFUiuUabVKBmeypCQbNwCqjS1MxlEjAmEdyZUEBqyLEgJKgsmV0ZUZmiEyY4Rd8rG2zGpAL7b7cNPvL-R6ujhbt6b2LJGR9uHnfHbu29f50-Md5AS19PII</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method for long-distance large-span tunnel and ultra-small clear distance tunnel</title><source>esp@cenet</source><creator>CHEN WANLI ; ZHANG MINGCHEN ; ZHANG PENG ; CHEN LIPENG ; FU SHUXUE ; SONG XIAO ; LI LEI</creator><creatorcontrib>CHEN WANLI ; ZHANG MINGCHEN ; ZHANG PENG ; CHEN LIPENG ; FU SHUXUE ; SONG XIAO ; LI LEI</creatorcontrib><description>The invention relates to the technical field of tunnel construction, and discloses a long-distance and large-span tunnel ultra-small clear distance tunnel construction method, which comprises the following steps of: firstly excavating parts I and II by adopting a controlled blasting method for a first tunnel, then excavating parts III and IV by adopting the controlled blasting method, and forming a blasting free face after excavating the parts I and II; in the excavation engineering of the part III and the part IV, a reinforcing measure is adopted for conducting grouting reinforcement on a middle rock clamping arch part, after first support construction of the first tunnel is completed, foam concrete with the damping effect of the first tunnel is poured, after the tunnel strength meets the design requirement, a second lining structure of the first tunnel is poured, and the excavation step sequence of the later tunnel is similar to that of the first tunnel; the V and the VI are excavated through a controlled b</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240903&amp;DB=EPODOC&amp;CC=CN&amp;NR=118582211A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76516</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240903&amp;DB=EPODOC&amp;CC=CN&amp;NR=118582211A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CHEN WANLI</creatorcontrib><creatorcontrib>ZHANG MINGCHEN</creatorcontrib><creatorcontrib>ZHANG PENG</creatorcontrib><creatorcontrib>CHEN LIPENG</creatorcontrib><creatorcontrib>FU SHUXUE</creatorcontrib><creatorcontrib>SONG XIAO</creatorcontrib><creatorcontrib>LI LEI</creatorcontrib><title>Construction method for long-distance large-span tunnel and ultra-small clear distance tunnel</title><description>The invention relates to the technical field of tunnel construction, and discloses a long-distance and large-span tunnel ultra-small clear distance tunnel construction method, which comprises the following steps of: firstly excavating parts I and II by adopting a controlled blasting method for a first tunnel, then excavating parts III and IV by adopting the controlled blasting method, and forming a blasting free face after excavating the parts I and II; in the excavation engineering of the part III and the part IV, a reinforcing measure is adopted for conducting grouting reinforcement on a middle rock clamping arch part, after first support construction of the first tunnel is completed, foam concrete with the damping effect of the first tunnel is poured, after the tunnel strength meets the design requirement, a second lining structure of the first tunnel is poured, and the excavation step sequence of the later tunnel is similar to that of the first tunnel; the V and the VI are excavated through a controlled b</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjLEKwjAQQLs4iPoP5wdkSEXoKkFxcnKVciTXWrjeleTy_wqKs9Nb3nvr5hFUiuUabVKBmeypCQbNwCqjS1MxlEjAmEdyZUEBqyLEgJKgsmV0ZUZmiEyY4Rd8rG2zGpAL7b7cNPvL-R6ujhbt6b2LJGR9uHnfHbu29f50-Md5AS19PII</recordid><startdate>20240903</startdate><enddate>20240903</enddate><creator>CHEN WANLI</creator><creator>ZHANG MINGCHEN</creator><creator>ZHANG PENG</creator><creator>CHEN LIPENG</creator><creator>FU SHUXUE</creator><creator>SONG XIAO</creator><creator>LI LEI</creator><scope>EVB</scope></search><sort><creationdate>20240903</creationdate><title>Construction method for long-distance large-span tunnel and ultra-small clear distance tunnel</title><author>CHEN WANLI ; ZHANG MINGCHEN ; ZHANG PENG ; CHEN LIPENG ; FU SHUXUE ; SONG XIAO ; LI LEI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118582211A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>CHEN WANLI</creatorcontrib><creatorcontrib>ZHANG MINGCHEN</creatorcontrib><creatorcontrib>ZHANG PENG</creatorcontrib><creatorcontrib>CHEN LIPENG</creatorcontrib><creatorcontrib>FU SHUXUE</creatorcontrib><creatorcontrib>SONG XIAO</creatorcontrib><creatorcontrib>LI LEI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CHEN WANLI</au><au>ZHANG MINGCHEN</au><au>ZHANG PENG</au><au>CHEN LIPENG</au><au>FU SHUXUE</au><au>SONG XIAO</au><au>LI LEI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method for long-distance large-span tunnel and ultra-small clear distance tunnel</title><date>2024-09-03</date><risdate>2024</risdate><abstract>The invention relates to the technical field of tunnel construction, and discloses a long-distance and large-span tunnel ultra-small clear distance tunnel construction method, which comprises the following steps of: firstly excavating parts I and II by adopting a controlled blasting method for a first tunnel, then excavating parts III and IV by adopting the controlled blasting method, and forming a blasting free face after excavating the parts I and II; in the excavation engineering of the part III and the part IV, a reinforcing measure is adopted for conducting grouting reinforcement on a middle rock clamping arch part, after first support construction of the first tunnel is completed, foam concrete with the damping effect of the first tunnel is poured, after the tunnel strength meets the design requirement, a second lining structure of the first tunnel is poured, and the excavation step sequence of the later tunnel is similar to that of the first tunnel; the V and the VI are excavated through a controlled b</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118582211A
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
TUNNELS
title Construction method for long-distance large-span tunnel and ultra-small clear distance tunnel
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-19T04%3A52%3A41IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CHEN%20WANLI&rft.date=2024-09-03&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118582211A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true