Tool section with high adaptability and steel pipe column construction method

The invention discloses a high-adaptability tool section and a steel pipe column construction method, the high-adaptability tool section comprises a body, a connecting ring mounted at the end position of the body and adaptive rings of various sizes pre-mounted at the end positions of steel pipe colu...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: MA JINGZHE, PEI CHAO, HE BIN, LIU YAFEI, YUAN JINBAO, LIU YANPING, DU FAPING, DING JIALIANG, ZHANG HAIXING, LUO XIAREN, DING HUIWEN, MENG SHUHONG, YU KUNPENG, ZHANG JUNWEN, FENG BAIXI, JIANG YIHUI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator MA JINGZHE
PEI CHAO
HE BIN
LIU YAFEI
YUAN JINBAO
LIU YANPING
DU FAPING
DING JIALIANG
ZHANG HAIXING
LUO XIAREN
DING HUIWEN
MENG SHUHONG
YU KUNPENG
ZHANG JUNWEN
FENG BAIXI
JIANG YIHUI
description The invention discloses a high-adaptability tool section and a steel pipe column construction method, the high-adaptability tool section comprises a body, a connecting ring mounted at the end position of the body and adaptive rings of various sizes pre-mounted at the end positions of steel pipe columns of various sizes, and the connecting ring abuts against the adaptive rings. First flange holes are formed in the connecting ring in the circumferential direction, and second flange holes are formed in the positions, corresponding to the first flange holes, of the adaptive rings of various sizes. The steel pipe column mounting structure has the effect of reducing the cost on the basis of meeting the mounting requirements of steel pipe columns with different sizes. 本发明公开了一种强适配性的工具节及钢管柱施工方法,其包括本体、安装于所述本体端部位置的连接环和预先安装于各种尺寸的钢管柱的端部位置的各种尺寸适配环,所述连接环和所述适配环相抵接,所述连接环上沿周向开设有第一法兰孔,各种尺寸的所述适配环上且对应所述第一法兰孔的位置均开设有第二法兰孔。本申请具有可在满足对不同尺寸钢管柱的安装需求基础上,降低成本的效果。
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118581890A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118581890A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118581890A3</originalsourceid><addsrcrecordid>eNqNyzEKAjEQQNE0FqLeYTzAgkGEWMriYqPV9suYjGYgmwlmFvH2CnoAq9f8PzfnXiRBJa8sGZ6sESLfI2DAonjlxPoCzAGqEiUoXAi8pGnMH3LVx_Q9R9IoYWlmN0yVVj8XZt0d-_bUUJGBakFPmXRoL9a6nbNuvzls_2neAVM2pQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Tool section with high adaptability and steel pipe column construction method</title><source>esp@cenet</source><creator>MA JINGZHE ; PEI CHAO ; HE BIN ; LIU YAFEI ; YUAN JINBAO ; LIU YANPING ; DU FAPING ; DING JIALIANG ; ZHANG HAIXING ; LUO XIAREN ; DING HUIWEN ; MENG SHUHONG ; YU KUNPENG ; ZHANG JUNWEN ; FENG BAIXI ; JIANG YIHUI</creator><creatorcontrib>MA JINGZHE ; PEI CHAO ; HE BIN ; LIU YAFEI ; YUAN JINBAO ; LIU YANPING ; DU FAPING ; DING JIALIANG ; ZHANG HAIXING ; LUO XIAREN ; DING HUIWEN ; MENG SHUHONG ; YU KUNPENG ; ZHANG JUNWEN ; FENG BAIXI ; JIANG YIHUI</creatorcontrib><description>The invention discloses a high-adaptability tool section and a steel pipe column construction method, the high-adaptability tool section comprises a body, a connecting ring mounted at the end position of the body and adaptive rings of various sizes pre-mounted at the end positions of steel pipe columns of various sizes, and the connecting ring abuts against the adaptive rings. First flange holes are formed in the connecting ring in the circumferential direction, and second flange holes are formed in the positions, corresponding to the first flange holes, of the adaptive rings of various sizes. The steel pipe column mounting structure has the effect of reducing the cost on the basis of meeting the mounting requirements of steel pipe columns with different sizes. 本发明公开了一种强适配性的工具节及钢管柱施工方法,其包括本体、安装于所述本体端部位置的连接环和预先安装于各种尺寸的钢管柱的端部位置的各种尺寸适配环,所述连接环和所述适配环相抵接,所述连接环上沿周向开设有第一法兰孔,各种尺寸的所述适配环上且对应所述第一法兰孔的位置均开设有第二法兰孔。本申请具有可在满足对不同尺寸钢管柱的安装需求基础上,降低成本的效果。</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240903&amp;DB=EPODOC&amp;CC=CN&amp;NR=118581890A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240903&amp;DB=EPODOC&amp;CC=CN&amp;NR=118581890A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>MA JINGZHE</creatorcontrib><creatorcontrib>PEI CHAO</creatorcontrib><creatorcontrib>HE BIN</creatorcontrib><creatorcontrib>LIU YAFEI</creatorcontrib><creatorcontrib>YUAN JINBAO</creatorcontrib><creatorcontrib>LIU YANPING</creatorcontrib><creatorcontrib>DU FAPING</creatorcontrib><creatorcontrib>DING JIALIANG</creatorcontrib><creatorcontrib>ZHANG HAIXING</creatorcontrib><creatorcontrib>LUO XIAREN</creatorcontrib><creatorcontrib>DING HUIWEN</creatorcontrib><creatorcontrib>MENG SHUHONG</creatorcontrib><creatorcontrib>YU KUNPENG</creatorcontrib><creatorcontrib>ZHANG JUNWEN</creatorcontrib><creatorcontrib>FENG BAIXI</creatorcontrib><creatorcontrib>JIANG YIHUI</creatorcontrib><title>Tool section with high adaptability and steel pipe column construction method</title><description>The invention discloses a high-adaptability tool section and a steel pipe column construction method, the high-adaptability tool section comprises a body, a connecting ring mounted at the end position of the body and adaptive rings of various sizes pre-mounted at the end positions of steel pipe columns of various sizes, and the connecting ring abuts against the adaptive rings. First flange holes are formed in the connecting ring in the circumferential direction, and second flange holes are formed in the positions, corresponding to the first flange holes, of the adaptive rings of various sizes. The steel pipe column mounting structure has the effect of reducing the cost on the basis of meeting the mounting requirements of steel pipe columns with different sizes. 本发明公开了一种强适配性的工具节及钢管柱施工方法,其包括本体、安装于所述本体端部位置的连接环和预先安装于各种尺寸的钢管柱的端部位置的各种尺寸适配环,所述连接环和所述适配环相抵接,所述连接环上沿周向开设有第一法兰孔,各种尺寸的所述适配环上且对应所述第一法兰孔的位置均开设有第二法兰孔。本申请具有可在满足对不同尺寸钢管柱的安装需求基础上,降低成本的效果。</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyzEKAjEQQNE0FqLeYTzAgkGEWMriYqPV9suYjGYgmwlmFvH2CnoAq9f8PzfnXiRBJa8sGZ6sESLfI2DAonjlxPoCzAGqEiUoXAi8pGnMH3LVx_Q9R9IoYWlmN0yVVj8XZt0d-_bUUJGBakFPmXRoL9a6nbNuvzls_2neAVM2pQ</recordid><startdate>20240903</startdate><enddate>20240903</enddate><creator>MA JINGZHE</creator><creator>PEI CHAO</creator><creator>HE BIN</creator><creator>LIU YAFEI</creator><creator>YUAN JINBAO</creator><creator>LIU YANPING</creator><creator>DU FAPING</creator><creator>DING JIALIANG</creator><creator>ZHANG HAIXING</creator><creator>LUO XIAREN</creator><creator>DING HUIWEN</creator><creator>MENG SHUHONG</creator><creator>YU KUNPENG</creator><creator>ZHANG JUNWEN</creator><creator>FENG BAIXI</creator><creator>JIANG YIHUI</creator><scope>EVB</scope></search><sort><creationdate>20240903</creationdate><title>Tool section with high adaptability and steel pipe column construction method</title><author>MA JINGZHE ; PEI CHAO ; HE BIN ; LIU YAFEI ; YUAN JINBAO ; LIU YANPING ; DU FAPING ; DING JIALIANG ; ZHANG HAIXING ; LUO XIAREN ; DING HUIWEN ; MENG SHUHONG ; YU KUNPENG ; ZHANG JUNWEN ; FENG BAIXI ; JIANG YIHUI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118581890A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>MA JINGZHE</creatorcontrib><creatorcontrib>PEI CHAO</creatorcontrib><creatorcontrib>HE BIN</creatorcontrib><creatorcontrib>LIU YAFEI</creatorcontrib><creatorcontrib>YUAN JINBAO</creatorcontrib><creatorcontrib>LIU YANPING</creatorcontrib><creatorcontrib>DU FAPING</creatorcontrib><creatorcontrib>DING JIALIANG</creatorcontrib><creatorcontrib>ZHANG HAIXING</creatorcontrib><creatorcontrib>LUO XIAREN</creatorcontrib><creatorcontrib>DING HUIWEN</creatorcontrib><creatorcontrib>MENG SHUHONG</creatorcontrib><creatorcontrib>YU KUNPENG</creatorcontrib><creatorcontrib>ZHANG JUNWEN</creatorcontrib><creatorcontrib>FENG BAIXI</creatorcontrib><creatorcontrib>JIANG YIHUI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>MA JINGZHE</au><au>PEI CHAO</au><au>HE BIN</au><au>LIU YAFEI</au><au>YUAN JINBAO</au><au>LIU YANPING</au><au>DU FAPING</au><au>DING JIALIANG</au><au>ZHANG HAIXING</au><au>LUO XIAREN</au><au>DING HUIWEN</au><au>MENG SHUHONG</au><au>YU KUNPENG</au><au>ZHANG JUNWEN</au><au>FENG BAIXI</au><au>JIANG YIHUI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Tool section with high adaptability and steel pipe column construction method</title><date>2024-09-03</date><risdate>2024</risdate><abstract>The invention discloses a high-adaptability tool section and a steel pipe column construction method, the high-adaptability tool section comprises a body, a connecting ring mounted at the end position of the body and adaptive rings of various sizes pre-mounted at the end positions of steel pipe columns of various sizes, and the connecting ring abuts against the adaptive rings. First flange holes are formed in the connecting ring in the circumferential direction, and second flange holes are formed in the positions, corresponding to the first flange holes, of the adaptive rings of various sizes. The steel pipe column mounting structure has the effect of reducing the cost on the basis of meeting the mounting requirements of steel pipe columns with different sizes. 本发明公开了一种强适配性的工具节及钢管柱施工方法,其包括本体、安装于所述本体端部位置的连接环和预先安装于各种尺寸的钢管柱的端部位置的各种尺寸适配环,所述连接环和所述适配环相抵接,所述连接环上沿周向开设有第一法兰孔,各种尺寸的所述适配环上且对应所述第一法兰孔的位置均开设有第二法兰孔。本申请具有可在满足对不同尺寸钢管柱的安装需求基础上,降低成本的效果。</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118581890A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Tool section with high adaptability and steel pipe column construction method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-04T07%3A36%3A50IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=MA%20JINGZHE&rft.date=2024-09-03&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118581890A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true