Pile-forming construction method under liquefied fly ash and loose pebble stratum condition in coastal area
The invention discloses a pile forming construction method under the liquefied fly ash and loose pebble stratum condition in a coastal area. The pile forming construction method comprises the steps that a precipitation well is formed in a pile foundation construction area so as to lower the undergro...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | SUN CHAO CAO PEILIN WANG PENG ZHANG SHIWEI ZHANG HONG YUE TENGFEI YANG YONG TIAN HONGSHUI ZHOU WEIWEI XING HEYAO HU XUGUANG SUO XIAOFENG DOU ZHONGPING AN XIAOFANG |
description | The invention discloses a pile forming construction method under the liquefied fly ash and loose pebble stratum condition in a coastal area. The pile forming construction method comprises the steps that a precipitation well is formed in a pile foundation construction area so as to lower the underground water level of the pile foundation construction area to the position below a fly ash stratum; the variable-frequency long spiral drilling machine is in place and drills to the hole bottom elevation; after the variable-frequency long spiral drilling machine stops drilling, concrete is poured while the drill rod is lifted; hoisting a reinforcement cage and placing the reinforcement cage in the plain concrete pile position, and keeping the perpendicularity of the reinforcement cage after the reinforcement cage sinks stably by utilizing the self weight of the reinforcement cage; and an eccentric vibratory hammer is started, and the reinforcement cage is put into the plain concrete pile by a designed depth. The meth |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118531777A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118531777A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118531777A3</originalsourceid><addsrcrecordid>eNqNjD0KwkAQRtNYiHqH8QApQpDYSlCsxMI-TLKzZnB3Ju5P4e2N4gGsHh-87y2Lx5UdlVaDZ7nDoBJTyENiFfCURjWQxVAAx89MlsmAdS_AOAKKAacaCSbqe0cwPzFl_4kY_hZY5oExoQMMhOtiYdFF2vy4Kran4609lzRpR3HCgYRS116qar-rq6ZpDvU_zhsT00HB</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Pile-forming construction method under liquefied fly ash and loose pebble stratum condition in coastal area</title><source>esp@cenet</source><creator>SUN CHAO ; CAO PEILIN ; WANG PENG ; ZHANG SHIWEI ; ZHANG HONG ; YUE TENGFEI ; YANG YONG ; TIAN HONGSHUI ; ZHOU WEIWEI ; XING HEYAO ; HU XUGUANG ; SUO XIAOFENG ; DOU ZHONGPING ; AN XIAOFANG</creator><creatorcontrib>SUN CHAO ; CAO PEILIN ; WANG PENG ; ZHANG SHIWEI ; ZHANG HONG ; YUE TENGFEI ; YANG YONG ; TIAN HONGSHUI ; ZHOU WEIWEI ; XING HEYAO ; HU XUGUANG ; SUO XIAOFENG ; DOU ZHONGPING ; AN XIAOFANG</creatorcontrib><description>The invention discloses a pile forming construction method under the liquefied fly ash and loose pebble stratum condition in a coastal area. The pile forming construction method comprises the steps that a precipitation well is formed in a pile foundation construction area so as to lower the underground water level of the pile foundation construction area to the position below a fly ash stratum; the variable-frequency long spiral drilling machine is in place and drills to the hole bottom elevation; after the variable-frequency long spiral drilling machine stops drilling, concrete is poured while the drill rod is lifted; hoisting a reinforcement cage and placing the reinforcement cage in the plain concrete pile position, and keeping the perpendicularity of the reinforcement cage after the reinforcement cage sinks stably by utilizing the self weight of the reinforcement cage; and an eccentric vibratory hammer is started, and the reinforcement cage is put into the plain concrete pile by a designed depth. The meth</description><language>chi ; eng</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240823&DB=EPODOC&CC=CN&NR=118531777A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240823&DB=EPODOC&CC=CN&NR=118531777A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SUN CHAO</creatorcontrib><creatorcontrib>CAO PEILIN</creatorcontrib><creatorcontrib>WANG PENG</creatorcontrib><creatorcontrib>ZHANG SHIWEI</creatorcontrib><creatorcontrib>ZHANG HONG</creatorcontrib><creatorcontrib>YUE TENGFEI</creatorcontrib><creatorcontrib>YANG YONG</creatorcontrib><creatorcontrib>TIAN HONGSHUI</creatorcontrib><creatorcontrib>ZHOU WEIWEI</creatorcontrib><creatorcontrib>XING HEYAO</creatorcontrib><creatorcontrib>HU XUGUANG</creatorcontrib><creatorcontrib>SUO XIAOFENG</creatorcontrib><creatorcontrib>DOU ZHONGPING</creatorcontrib><creatorcontrib>AN XIAOFANG</creatorcontrib><title>Pile-forming construction method under liquefied fly ash and loose pebble stratum condition in coastal area</title><description>The invention discloses a pile forming construction method under the liquefied fly ash and loose pebble stratum condition in a coastal area. The pile forming construction method comprises the steps that a precipitation well is formed in a pile foundation construction area so as to lower the underground water level of the pile foundation construction area to the position below a fly ash stratum; the variable-frequency long spiral drilling machine is in place and drills to the hole bottom elevation; after the variable-frequency long spiral drilling machine stops drilling, concrete is poured while the drill rod is lifted; hoisting a reinforcement cage and placing the reinforcement cage in the plain concrete pile position, and keeping the perpendicularity of the reinforcement cage after the reinforcement cage sinks stably by utilizing the self weight of the reinforcement cage; and an eccentric vibratory hammer is started, and the reinforcement cage is put into the plain concrete pile by a designed depth. The meth</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjD0KwkAQRtNYiHqH8QApQpDYSlCsxMI-TLKzZnB3Ju5P4e2N4gGsHh-87y2Lx5UdlVaDZ7nDoBJTyENiFfCURjWQxVAAx89MlsmAdS_AOAKKAacaCSbqe0cwPzFl_4kY_hZY5oExoQMMhOtiYdFF2vy4Kran4609lzRpR3HCgYRS116qar-rq6ZpDvU_zhsT00HB</recordid><startdate>20240823</startdate><enddate>20240823</enddate><creator>SUN CHAO</creator><creator>CAO PEILIN</creator><creator>WANG PENG</creator><creator>ZHANG SHIWEI</creator><creator>ZHANG HONG</creator><creator>YUE TENGFEI</creator><creator>YANG YONG</creator><creator>TIAN HONGSHUI</creator><creator>ZHOU WEIWEI</creator><creator>XING HEYAO</creator><creator>HU XUGUANG</creator><creator>SUO XIAOFENG</creator><creator>DOU ZHONGPING</creator><creator>AN XIAOFANG</creator><scope>EVB</scope></search><sort><creationdate>20240823</creationdate><title>Pile-forming construction method under liquefied fly ash and loose pebble stratum condition in coastal area</title><author>SUN CHAO ; CAO PEILIN ; WANG PENG ; ZHANG SHIWEI ; ZHANG HONG ; YUE TENGFEI ; YANG YONG ; TIAN HONGSHUI ; ZHOU WEIWEI ; XING HEYAO ; HU XUGUANG ; SUO XIAOFENG ; DOU ZHONGPING ; AN XIAOFANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118531777A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>SUN CHAO</creatorcontrib><creatorcontrib>CAO PEILIN</creatorcontrib><creatorcontrib>WANG PENG</creatorcontrib><creatorcontrib>ZHANG SHIWEI</creatorcontrib><creatorcontrib>ZHANG HONG</creatorcontrib><creatorcontrib>YUE TENGFEI</creatorcontrib><creatorcontrib>YANG YONG</creatorcontrib><creatorcontrib>TIAN HONGSHUI</creatorcontrib><creatorcontrib>ZHOU WEIWEI</creatorcontrib><creatorcontrib>XING HEYAO</creatorcontrib><creatorcontrib>HU XUGUANG</creatorcontrib><creatorcontrib>SUO XIAOFENG</creatorcontrib><creatorcontrib>DOU ZHONGPING</creatorcontrib><creatorcontrib>AN XIAOFANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SUN CHAO</au><au>CAO PEILIN</au><au>WANG PENG</au><au>ZHANG SHIWEI</au><au>ZHANG HONG</au><au>YUE TENGFEI</au><au>YANG YONG</au><au>TIAN HONGSHUI</au><au>ZHOU WEIWEI</au><au>XING HEYAO</au><au>HU XUGUANG</au><au>SUO XIAOFENG</au><au>DOU ZHONGPING</au><au>AN XIAOFANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Pile-forming construction method under liquefied fly ash and loose pebble stratum condition in coastal area</title><date>2024-08-23</date><risdate>2024</risdate><abstract>The invention discloses a pile forming construction method under the liquefied fly ash and loose pebble stratum condition in a coastal area. The pile forming construction method comprises the steps that a precipitation well is formed in a pile foundation construction area so as to lower the underground water level of the pile foundation construction area to the position below a fly ash stratum; the variable-frequency long spiral drilling machine is in place and drills to the hole bottom elevation; after the variable-frequency long spiral drilling machine stops drilling, concrete is poured while the drill rod is lifted; hoisting a reinforcement cage and placing the reinforcement cage in the plain concrete pile position, and keeping the perpendicularity of the reinforcement cage after the reinforcement cage sinks stably by utilizing the self weight of the reinforcement cage; and an eccentric vibratory hammer is started, and the reinforcement cage is put into the plain concrete pile by a designed depth. The meth</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN118531777A |
source | esp@cenet |
subjects | EARTH DRILLING EARTH DRILLING, e.g. DEEP DRILLING EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING MINING OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Pile-forming construction method under liquefied fly ash and loose pebble stratum condition in coastal area |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-18T22%3A48%3A47IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SUN%20CHAO&rft.date=2024-08-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118531777A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |