Pile-forming construction method under liquefied fly ash and loose pebble stratum condition in coastal area

The invention discloses a pile forming construction method under the liquefied fly ash and loose pebble stratum condition in a coastal area. The pile forming construction method comprises the steps that a precipitation well is formed in a pile foundation construction area so as to lower the undergro...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SUN CHAO, CAO PEILIN, WANG PENG, ZHANG SHIWEI, ZHANG HONG, YUE TENGFEI, YANG YONG, TIAN HONGSHUI, ZHOU WEIWEI, XING HEYAO, HU XUGUANG, SUO XIAOFENG, DOU ZHONGPING, AN XIAOFANG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator SUN CHAO
CAO PEILIN
WANG PENG
ZHANG SHIWEI
ZHANG HONG
YUE TENGFEI
YANG YONG
TIAN HONGSHUI
ZHOU WEIWEI
XING HEYAO
HU XUGUANG
SUO XIAOFENG
DOU ZHONGPING
AN XIAOFANG
description The invention discloses a pile forming construction method under the liquefied fly ash and loose pebble stratum condition in a coastal area. The pile forming construction method comprises the steps that a precipitation well is formed in a pile foundation construction area so as to lower the underground water level of the pile foundation construction area to the position below a fly ash stratum; the variable-frequency long spiral drilling machine is in place and drills to the hole bottom elevation; after the variable-frequency long spiral drilling machine stops drilling, concrete is poured while the drill rod is lifted; hoisting a reinforcement cage and placing the reinforcement cage in the plain concrete pile position, and keeping the perpendicularity of the reinforcement cage after the reinforcement cage sinks stably by utilizing the self weight of the reinforcement cage; and an eccentric vibratory hammer is started, and the reinforcement cage is put into the plain concrete pile by a designed depth. The meth
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118531777A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118531777A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118531777A3</originalsourceid><addsrcrecordid>eNqNjD0KwkAQRtNYiHqH8QApQpDYSlCsxMI-TLKzZnB3Ju5P4e2N4gGsHh-87y2Lx5UdlVaDZ7nDoBJTyENiFfCURjWQxVAAx89MlsmAdS_AOAKKAacaCSbqe0cwPzFl_4kY_hZY5oExoQMMhOtiYdFF2vy4Kran4609lzRpR3HCgYRS116qar-rq6ZpDvU_zhsT00HB</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Pile-forming construction method under liquefied fly ash and loose pebble stratum condition in coastal area</title><source>esp@cenet</source><creator>SUN CHAO ; CAO PEILIN ; WANG PENG ; ZHANG SHIWEI ; ZHANG HONG ; YUE TENGFEI ; YANG YONG ; TIAN HONGSHUI ; ZHOU WEIWEI ; XING HEYAO ; HU XUGUANG ; SUO XIAOFENG ; DOU ZHONGPING ; AN XIAOFANG</creator><creatorcontrib>SUN CHAO ; CAO PEILIN ; WANG PENG ; ZHANG SHIWEI ; ZHANG HONG ; YUE TENGFEI ; YANG YONG ; TIAN HONGSHUI ; ZHOU WEIWEI ; XING HEYAO ; HU XUGUANG ; SUO XIAOFENG ; DOU ZHONGPING ; AN XIAOFANG</creatorcontrib><description>The invention discloses a pile forming construction method under the liquefied fly ash and loose pebble stratum condition in a coastal area. The pile forming construction method comprises the steps that a precipitation well is formed in a pile foundation construction area so as to lower the underground water level of the pile foundation construction area to the position below a fly ash stratum; the variable-frequency long spiral drilling machine is in place and drills to the hole bottom elevation; after the variable-frequency long spiral drilling machine stops drilling, concrete is poured while the drill rod is lifted; hoisting a reinforcement cage and placing the reinforcement cage in the plain concrete pile position, and keeping the perpendicularity of the reinforcement cage after the reinforcement cage sinks stably by utilizing the self weight of the reinforcement cage; and an eccentric vibratory hammer is started, and the reinforcement cage is put into the plain concrete pile by a designed depth. The meth</description><language>chi ; eng</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240823&amp;DB=EPODOC&amp;CC=CN&amp;NR=118531777A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240823&amp;DB=EPODOC&amp;CC=CN&amp;NR=118531777A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SUN CHAO</creatorcontrib><creatorcontrib>CAO PEILIN</creatorcontrib><creatorcontrib>WANG PENG</creatorcontrib><creatorcontrib>ZHANG SHIWEI</creatorcontrib><creatorcontrib>ZHANG HONG</creatorcontrib><creatorcontrib>YUE TENGFEI</creatorcontrib><creatorcontrib>YANG YONG</creatorcontrib><creatorcontrib>TIAN HONGSHUI</creatorcontrib><creatorcontrib>ZHOU WEIWEI</creatorcontrib><creatorcontrib>XING HEYAO</creatorcontrib><creatorcontrib>HU XUGUANG</creatorcontrib><creatorcontrib>SUO XIAOFENG</creatorcontrib><creatorcontrib>DOU ZHONGPING</creatorcontrib><creatorcontrib>AN XIAOFANG</creatorcontrib><title>Pile-forming construction method under liquefied fly ash and loose pebble stratum condition in coastal area</title><description>The invention discloses a pile forming construction method under the liquefied fly ash and loose pebble stratum condition in a coastal area. The pile forming construction method comprises the steps that a precipitation well is formed in a pile foundation construction area so as to lower the underground water level of the pile foundation construction area to the position below a fly ash stratum; the variable-frequency long spiral drilling machine is in place and drills to the hole bottom elevation; after the variable-frequency long spiral drilling machine stops drilling, concrete is poured while the drill rod is lifted; hoisting a reinforcement cage and placing the reinforcement cage in the plain concrete pile position, and keeping the perpendicularity of the reinforcement cage after the reinforcement cage sinks stably by utilizing the self weight of the reinforcement cage; and an eccentric vibratory hammer is started, and the reinforcement cage is put into the plain concrete pile by a designed depth. The meth</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjD0KwkAQRtNYiHqH8QApQpDYSlCsxMI-TLKzZnB3Ju5P4e2N4gGsHh-87y2Lx5UdlVaDZ7nDoBJTyENiFfCURjWQxVAAx89MlsmAdS_AOAKKAacaCSbqe0cwPzFl_4kY_hZY5oExoQMMhOtiYdFF2vy4Kran4609lzRpR3HCgYRS116qar-rq6ZpDvU_zhsT00HB</recordid><startdate>20240823</startdate><enddate>20240823</enddate><creator>SUN CHAO</creator><creator>CAO PEILIN</creator><creator>WANG PENG</creator><creator>ZHANG SHIWEI</creator><creator>ZHANG HONG</creator><creator>YUE TENGFEI</creator><creator>YANG YONG</creator><creator>TIAN HONGSHUI</creator><creator>ZHOU WEIWEI</creator><creator>XING HEYAO</creator><creator>HU XUGUANG</creator><creator>SUO XIAOFENG</creator><creator>DOU ZHONGPING</creator><creator>AN XIAOFANG</creator><scope>EVB</scope></search><sort><creationdate>20240823</creationdate><title>Pile-forming construction method under liquefied fly ash and loose pebble stratum condition in coastal area</title><author>SUN CHAO ; CAO PEILIN ; WANG PENG ; ZHANG SHIWEI ; ZHANG HONG ; YUE TENGFEI ; YANG YONG ; TIAN HONGSHUI ; ZHOU WEIWEI ; XING HEYAO ; HU XUGUANG ; SUO XIAOFENG ; DOU ZHONGPING ; AN XIAOFANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118531777A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>SUN CHAO</creatorcontrib><creatorcontrib>CAO PEILIN</creatorcontrib><creatorcontrib>WANG PENG</creatorcontrib><creatorcontrib>ZHANG SHIWEI</creatorcontrib><creatorcontrib>ZHANG HONG</creatorcontrib><creatorcontrib>YUE TENGFEI</creatorcontrib><creatorcontrib>YANG YONG</creatorcontrib><creatorcontrib>TIAN HONGSHUI</creatorcontrib><creatorcontrib>ZHOU WEIWEI</creatorcontrib><creatorcontrib>XING HEYAO</creatorcontrib><creatorcontrib>HU XUGUANG</creatorcontrib><creatorcontrib>SUO XIAOFENG</creatorcontrib><creatorcontrib>DOU ZHONGPING</creatorcontrib><creatorcontrib>AN XIAOFANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SUN CHAO</au><au>CAO PEILIN</au><au>WANG PENG</au><au>ZHANG SHIWEI</au><au>ZHANG HONG</au><au>YUE TENGFEI</au><au>YANG YONG</au><au>TIAN HONGSHUI</au><au>ZHOU WEIWEI</au><au>XING HEYAO</au><au>HU XUGUANG</au><au>SUO XIAOFENG</au><au>DOU ZHONGPING</au><au>AN XIAOFANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Pile-forming construction method under liquefied fly ash and loose pebble stratum condition in coastal area</title><date>2024-08-23</date><risdate>2024</risdate><abstract>The invention discloses a pile forming construction method under the liquefied fly ash and loose pebble stratum condition in a coastal area. The pile forming construction method comprises the steps that a precipitation well is formed in a pile foundation construction area so as to lower the underground water level of the pile foundation construction area to the position below a fly ash stratum; the variable-frequency long spiral drilling machine is in place and drills to the hole bottom elevation; after the variable-frequency long spiral drilling machine stops drilling, concrete is poured while the drill rod is lifted; hoisting a reinforcement cage and placing the reinforcement cage in the plain concrete pile position, and keeping the perpendicularity of the reinforcement cage after the reinforcement cage sinks stably by utilizing the self weight of the reinforcement cage; and an eccentric vibratory hammer is started, and the reinforcement cage is put into the plain concrete pile by a designed depth. The meth</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118531777A
source esp@cenet
subjects EARTH DRILLING
EARTH DRILLING, e.g. DEEP DRILLING
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
MINING
OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Pile-forming construction method under liquefied fly ash and loose pebble stratum condition in coastal area
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-18T22%3A48%3A47IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SUN%20CHAO&rft.date=2024-08-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118531777A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true