Project progress control method and system based on double-code network plan, medium and equipment
The invention provides a project progress control method and system based on a double-code network plan, a medium and equipment, a network logic unit is adopted as a basic unit of network construction, the total time difference of work is determined by the network logic unit, and the free time diffe...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | PANG ZHENNING CHEN YONGMING WANG GANG ZHU SHUSHU WANG WANG LI GUANGDONG XIAO LIANG ZHONG ZHENXIANG |
description | The invention provides a project progress control method and system based on a double-code network plan, a medium and equipment, a network logic unit is adopted as a basic unit of network construction, the total time difference of work is determined by the network logic unit, and the free time difference of work is jointly determined by the network logic unit and the function of virtual work. According to the checked project progress deviation, the total time difference, the free time difference and the network logic unit road section of each work are utilized to determine a responsible person which mistakes the construction period, and the responsible person is used for formulating a work-up deviation correction measure for a worker who mistakes work. According to the method, the total time difference and the free time difference of the work can be calculated without the earliest start time, the latest start time, the earliest end time and the latest end time of the work, the calculation is simple, and the s |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118521073A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118521073A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118521073A3</originalsourceid><addsrcrecordid>eNqNjLEKwjAURbs4iPoPz92CtYiuUhQncXAvaXKr1SQv5qWIf28RP8DpLOeccdacI9-hE4XI1wgR0uxTZEsO6caGlDckb0lw1CiBIfZkuG8scs0G5JFeHB8UrPKLITJd774Rnn0XHHyaZqNWWcHsx0k2P-wv1TFH4BoSlMYwqatTUWzXq2K5KXflP84HY_k-Ew</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Project progress control method and system based on double-code network plan, medium and equipment</title><source>esp@cenet</source><creator>PANG ZHENNING ; CHEN YONGMING ; WANG GANG ; ZHU SHUSHU ; WANG WANG ; LI GUANGDONG ; XIAO LIANG ; ZHONG ZHENXIANG</creator><creatorcontrib>PANG ZHENNING ; CHEN YONGMING ; WANG GANG ; ZHU SHUSHU ; WANG WANG ; LI GUANGDONG ; XIAO LIANG ; ZHONG ZHENXIANG</creatorcontrib><description>The invention provides a project progress control method and system based on a double-code network plan, a medium and equipment, a network logic unit is adopted as a basic unit of network construction, the total time difference of work is determined by the network logic unit, and the free time difference of work is jointly determined by the network logic unit and the function of virtual work. According to the checked project progress deviation, the total time difference, the free time difference and the network logic unit road section of each work are utilized to determine a responsible person which mistakes the construction period, and the responsible person is used for formulating a work-up deviation correction measure for a worker who mistakes work. According to the method, the total time difference and the free time difference of the work can be calculated without the earliest start time, the latest start time, the earliest end time and the latest end time of the work, the calculation is simple, and the s</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240820&DB=EPODOC&CC=CN&NR=118521073A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25545,76296</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240820&DB=EPODOC&CC=CN&NR=118521073A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>PANG ZHENNING</creatorcontrib><creatorcontrib>CHEN YONGMING</creatorcontrib><creatorcontrib>WANG GANG</creatorcontrib><creatorcontrib>ZHU SHUSHU</creatorcontrib><creatorcontrib>WANG WANG</creatorcontrib><creatorcontrib>LI GUANGDONG</creatorcontrib><creatorcontrib>XIAO LIANG</creatorcontrib><creatorcontrib>ZHONG ZHENXIANG</creatorcontrib><title>Project progress control method and system based on double-code network plan, medium and equipment</title><description>The invention provides a project progress control method and system based on a double-code network plan, a medium and equipment, a network logic unit is adopted as a basic unit of network construction, the total time difference of work is determined by the network logic unit, and the free time difference of work is jointly determined by the network logic unit and the function of virtual work. According to the checked project progress deviation, the total time difference, the free time difference and the network logic unit road section of each work are utilized to determine a responsible person which mistakes the construction period, and the responsible person is used for formulating a work-up deviation correction measure for a worker who mistakes work. According to the method, the total time difference and the free time difference of the work can be calculated without the earliest start time, the latest start time, the earliest end time and the latest end time of the work, the calculation is simple, and the s</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjLEKwjAURbs4iPoPz92CtYiuUhQncXAvaXKr1SQv5qWIf28RP8DpLOeccdacI9-hE4XI1wgR0uxTZEsO6caGlDckb0lw1CiBIfZkuG8scs0G5JFeHB8UrPKLITJd774Rnn0XHHyaZqNWWcHsx0k2P-wv1TFH4BoSlMYwqatTUWzXq2K5KXflP84HY_k-Ew</recordid><startdate>20240820</startdate><enddate>20240820</enddate><creator>PANG ZHENNING</creator><creator>CHEN YONGMING</creator><creator>WANG GANG</creator><creator>ZHU SHUSHU</creator><creator>WANG WANG</creator><creator>LI GUANGDONG</creator><creator>XIAO LIANG</creator><creator>ZHONG ZHENXIANG</creator><scope>EVB</scope></search><sort><creationdate>20240820</creationdate><title>Project progress control method and system based on double-code network plan, medium and equipment</title><author>PANG ZHENNING ; CHEN YONGMING ; WANG GANG ; ZHU SHUSHU ; WANG WANG ; LI GUANGDONG ; XIAO LIANG ; ZHONG ZHENXIANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118521073A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>PANG ZHENNING</creatorcontrib><creatorcontrib>CHEN YONGMING</creatorcontrib><creatorcontrib>WANG GANG</creatorcontrib><creatorcontrib>ZHU SHUSHU</creatorcontrib><creatorcontrib>WANG WANG</creatorcontrib><creatorcontrib>LI GUANGDONG</creatorcontrib><creatorcontrib>XIAO LIANG</creatorcontrib><creatorcontrib>ZHONG ZHENXIANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>PANG ZHENNING</au><au>CHEN YONGMING</au><au>WANG GANG</au><au>ZHU SHUSHU</au><au>WANG WANG</au><au>LI GUANGDONG</au><au>XIAO LIANG</au><au>ZHONG ZHENXIANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Project progress control method and system based on double-code network plan, medium and equipment</title><date>2024-08-20</date><risdate>2024</risdate><abstract>The invention provides a project progress control method and system based on a double-code network plan, a medium and equipment, a network logic unit is adopted as a basic unit of network construction, the total time difference of work is determined by the network logic unit, and the free time difference of work is jointly determined by the network logic unit and the function of virtual work. According to the checked project progress deviation, the total time difference, the free time difference and the network logic unit road section of each work are utilized to determine a responsible person which mistakes the construction period, and the responsible person is used for formulating a work-up deviation correction measure for a worker who mistakes work. According to the method, the total time difference and the free time difference of the work can be calculated without the earliest start time, the latest start time, the earliest end time and the latest end time of the work, the calculation is simple, and the s</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN118521073A |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | Project progress control method and system based on double-code network plan, medium and equipment |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-19T00%3A47%3A32IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=PANG%20ZHENNING&rft.date=2024-08-20&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118521073A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |