The invention discloses a rapid construction method for an ultra-large rectangular continuous open caisson underground station in a soft soil stratum, which comprises the following steps of: dividing a continuous open caisson into seven open caisson sections, sequentially naming the open caisson sec...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: NIU YUCHAO, FENG XIAOTAO, ZHOU XI, WU ZONGJIN, FANG YUZHONG, ZHANG HAO, LIU CHANGJIANG, GUO DEFU, SU JIANXIANG, ZHANG WENMING, DI HUIJIE, YANG CHEN, PENG HAIKU, LIN YONGXIAO, HUANG YINGZHENG, LI QIANG, HE YATAO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator NIU YUCHAO
FENG XIAOTAO
ZHOU XI
WU ZONGJIN
FANG YUZHONG
ZHANG HAO
LIU CHANGJIANG
GUO DEFU
SU JIANXIANG
ZHANG WENMING
DI HUIJIE
YANG CHEN
PENG HAIKU
LIN YONGXIAO
HUANG YINGZHENG
LI QIANG
HE YATAO
description The invention discloses a rapid construction method for an ultra-large rectangular continuous open caisson underground station in a soft soil stratum, which comprises the following steps of: dividing a continuous open caisson into seven open caisson sections, sequentially naming the open caisson sections as open caisson sections 1-7 from front to back, manufacturing each open caisson section for four times and sinking for two times, and correspondingly completing manufacturing of a main body of the open caisson section for one time; the sinking of the two sections of main bodies of the open caisson is correspondingly completed through one-time sinking, the continuous open caisson is divided into three stages for construction, the first stage is that the seventh open caisson moves in advance, the second stage is that the first, third and fifth open caissons follow up after meeting conditions, the third stage is that the second, fourth and sixth open caissons are constructed, and finally connecting sections bet
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118517019A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118517019A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118517019A3</originalsourceid><addsrcrecordid>eNqNjMEKwkAMRHvxIOo_xA8oWETUoxTFkwfxXsI2rQvbZNlk_X5X8QO8zGOGmZlXrztG34MTVkvZmReGiewpPQySIAdLWAdMI0EiZ8hjLu7TN89ZsoJEYnDoVcs0c09pTFIIavi98wwqgxXxoYQJLU_LajZgUFr9uKjWl_OjvdYUpSON6IjJuvbWNIdds980x9P2n84b7rVG_A</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Rapid construction method for ultra-large rectangular continuous open caisson underground station in soft soil stratum</title><source>esp@cenet</source><creator>NIU YUCHAO ; FENG XIAOTAO ; ZHOU XI ; WU ZONGJIN ; FANG YUZHONG ; ZHANG HAO ; LIU CHANGJIANG ; GUO DEFU ; SU JIANXIANG ; ZHANG WENMING ; DI HUIJIE ; YANG CHEN ; PENG HAIKU ; LIN YONGXIAO ; HUANG YINGZHENG ; LI QIANG ; HE YATAO</creator><creatorcontrib>NIU YUCHAO ; FENG XIAOTAO ; ZHOU XI ; WU ZONGJIN ; FANG YUZHONG ; ZHANG HAO ; LIU CHANGJIANG ; GUO DEFU ; SU JIANXIANG ; ZHANG WENMING ; DI HUIJIE ; YANG CHEN ; PENG HAIKU ; LIN YONGXIAO ; HUANG YINGZHENG ; LI QIANG ; HE YATAO</creatorcontrib><description>The invention discloses a rapid construction method for an ultra-large rectangular continuous open caisson underground station in a soft soil stratum, which comprises the following steps of: dividing a continuous open caisson into seven open caisson sections, sequentially naming the open caisson sections as open caisson sections 1-7 from front to back, manufacturing each open caisson section for four times and sinking for two times, and correspondingly completing manufacturing of a main body of the open caisson section for one time; the sinking of the two sections of main bodies of the open caisson is correspondingly completed through one-time sinking, the continuous open caisson is divided into three stages for construction, the first stage is that the seventh open caisson moves in advance, the second stage is that the first, third and fifth open caissons follow up after meeting conditions, the third stage is that the second, fourth and sixth open caissons are constructed, and finally connecting sections bet</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240820&amp;DB=EPODOC&amp;CC=CN&amp;NR=118517019A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25544,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240820&amp;DB=EPODOC&amp;CC=CN&amp;NR=118517019A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>NIU YUCHAO</creatorcontrib><creatorcontrib>FENG XIAOTAO</creatorcontrib><creatorcontrib>ZHOU XI</creatorcontrib><creatorcontrib>WU ZONGJIN</creatorcontrib><creatorcontrib>FANG YUZHONG</creatorcontrib><creatorcontrib>ZHANG HAO</creatorcontrib><creatorcontrib>LIU CHANGJIANG</creatorcontrib><creatorcontrib>GUO DEFU</creatorcontrib><creatorcontrib>SU JIANXIANG</creatorcontrib><creatorcontrib>ZHANG WENMING</creatorcontrib><creatorcontrib>DI HUIJIE</creatorcontrib><creatorcontrib>YANG CHEN</creatorcontrib><creatorcontrib>PENG HAIKU</creatorcontrib><creatorcontrib>LIN YONGXIAO</creatorcontrib><creatorcontrib>HUANG YINGZHENG</creatorcontrib><creatorcontrib>LI QIANG</creatorcontrib><creatorcontrib>HE YATAO</creatorcontrib><title>Rapid construction method for ultra-large rectangular continuous open caisson underground station in soft soil stratum</title><description>The invention discloses a rapid construction method for an ultra-large rectangular continuous open caisson underground station in a soft soil stratum, which comprises the following steps of: dividing a continuous open caisson into seven open caisson sections, sequentially naming the open caisson sections as open caisson sections 1-7 from front to back, manufacturing each open caisson section for four times and sinking for two times, and correspondingly completing manufacturing of a main body of the open caisson section for one time; the sinking of the two sections of main bodies of the open caisson is correspondingly completed through one-time sinking, the continuous open caisson is divided into three stages for construction, the first stage is that the seventh open caisson moves in advance, the second stage is that the first, third and fifth open caissons follow up after meeting conditions, the third stage is that the second, fourth and sixth open caissons are constructed, and finally connecting sections bet</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjMEKwkAMRHvxIOo_xA8oWETUoxTFkwfxXsI2rQvbZNlk_X5X8QO8zGOGmZlXrztG34MTVkvZmReGiewpPQySIAdLWAdMI0EiZ8hjLu7TN89ZsoJEYnDoVcs0c09pTFIIavi98wwqgxXxoYQJLU_LajZgUFr9uKjWl_OjvdYUpSON6IjJuvbWNIdds980x9P2n84b7rVG_A</recordid><startdate>20240820</startdate><enddate>20240820</enddate><creator>NIU YUCHAO</creator><creator>FENG XIAOTAO</creator><creator>ZHOU XI</creator><creator>WU ZONGJIN</creator><creator>FANG YUZHONG</creator><creator>ZHANG HAO</creator><creator>LIU CHANGJIANG</creator><creator>GUO DEFU</creator><creator>SU JIANXIANG</creator><creator>ZHANG WENMING</creator><creator>DI HUIJIE</creator><creator>YANG CHEN</creator><creator>PENG HAIKU</creator><creator>LIN YONGXIAO</creator><creator>HUANG YINGZHENG</creator><creator>LI QIANG</creator><creator>HE YATAO</creator><scope>EVB</scope></search><sort><creationdate>20240820</creationdate><title>Rapid construction method for ultra-large rectangular continuous open caisson underground station in soft soil stratum</title><author>NIU YUCHAO ; FENG XIAOTAO ; ZHOU XI ; WU ZONGJIN ; FANG YUZHONG ; ZHANG HAO ; LIU CHANGJIANG ; GUO DEFU ; SU JIANXIANG ; ZHANG WENMING ; DI HUIJIE ; YANG CHEN ; PENG HAIKU ; LIN YONGXIAO ; HUANG YINGZHENG ; LI QIANG ; HE YATAO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118517019A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>NIU YUCHAO</creatorcontrib><creatorcontrib>FENG XIAOTAO</creatorcontrib><creatorcontrib>ZHOU XI</creatorcontrib><creatorcontrib>WU ZONGJIN</creatorcontrib><creatorcontrib>FANG YUZHONG</creatorcontrib><creatorcontrib>ZHANG HAO</creatorcontrib><creatorcontrib>LIU CHANGJIANG</creatorcontrib><creatorcontrib>GUO DEFU</creatorcontrib><creatorcontrib>SU JIANXIANG</creatorcontrib><creatorcontrib>ZHANG WENMING</creatorcontrib><creatorcontrib>DI HUIJIE</creatorcontrib><creatorcontrib>YANG CHEN</creatorcontrib><creatorcontrib>PENG HAIKU</creatorcontrib><creatorcontrib>LIN YONGXIAO</creatorcontrib><creatorcontrib>HUANG YINGZHENG</creatorcontrib><creatorcontrib>LI QIANG</creatorcontrib><creatorcontrib>HE YATAO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>NIU YUCHAO</au><au>FENG XIAOTAO</au><au>ZHOU XI</au><au>WU ZONGJIN</au><au>FANG YUZHONG</au><au>ZHANG HAO</au><au>LIU CHANGJIANG</au><au>GUO DEFU</au><au>SU JIANXIANG</au><au>ZHANG WENMING</au><au>DI HUIJIE</au><au>YANG CHEN</au><au>PENG HAIKU</au><au>LIN YONGXIAO</au><au>HUANG YINGZHENG</au><au>LI QIANG</au><au>HE YATAO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Rapid construction method for ultra-large rectangular continuous open caisson underground station in soft soil stratum</title><date>2024-08-20</date><risdate>2024</risdate><abstract>The invention discloses a rapid construction method for an ultra-large rectangular continuous open caisson underground station in a soft soil stratum, which comprises the following steps of: dividing a continuous open caisson into seven open caisson sections, sequentially naming the open caisson sections as open caisson sections 1-7 from front to back, manufacturing each open caisson section for four times and sinking for two times, and correspondingly completing manufacturing of a main body of the open caisson section for one time; the sinking of the two sections of main bodies of the open caisson is correspondingly completed through one-time sinking, the continuous open caisson is divided into three stages for construction, the first stage is that the seventh open caisson moves in advance, the second stage is that the first, third and fifth open caissons follow up after meeting conditions, the third stage is that the second, fourth and sixth open caissons are constructed, and finally connecting sections bet</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118517019A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Rapid construction method for ultra-large rectangular continuous open caisson underground station in soft soil stratum
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-28T04%3A57%3A35IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=NIU%20YUCHAO&rft.date=2024-08-20&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118517019A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true