Rapid construction method for ultra-large rectangular continuous open caisson underground station in soft soil stratum
The invention discloses a rapid construction method for an ultra-large rectangular continuous open caisson underground station in a soft soil stratum, which comprises the following steps of: dividing a continuous open caisson into seven open caisson sections, sequentially naming the open caisson sec...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | NIU YUCHAO FENG XIAOTAO ZHOU XI WU ZONGJIN FANG YUZHONG ZHANG HAO LIU CHANGJIANG GUO DEFU SU JIANXIANG ZHANG WENMING DI HUIJIE YANG CHEN PENG HAIKU LIN YONGXIAO HUANG YINGZHENG LI QIANG HE YATAO |
description | The invention discloses a rapid construction method for an ultra-large rectangular continuous open caisson underground station in a soft soil stratum, which comprises the following steps of: dividing a continuous open caisson into seven open caisson sections, sequentially naming the open caisson sections as open caisson sections 1-7 from front to back, manufacturing each open caisson section for four times and sinking for two times, and correspondingly completing manufacturing of a main body of the open caisson section for one time; the sinking of the two sections of main bodies of the open caisson is correspondingly completed through one-time sinking, the continuous open caisson is divided into three stages for construction, the first stage is that the seventh open caisson moves in advance, the second stage is that the first, third and fifth open caissons follow up after meeting conditions, the third stage is that the second, fourth and sixth open caissons are constructed, and finally connecting sections bet |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118517019A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118517019A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118517019A3</originalsourceid><addsrcrecordid>eNqNjMEKwkAMRHvxIOo_xA8oWETUoxTFkwfxXsI2rQvbZNlk_X5X8QO8zGOGmZlXrztG34MTVkvZmReGiewpPQySIAdLWAdMI0EiZ8hjLu7TN89ZsoJEYnDoVcs0c09pTFIIavi98wwqgxXxoYQJLU_LajZgUFr9uKjWl_OjvdYUpSON6IjJuvbWNIdds980x9P2n84b7rVG_A</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Rapid construction method for ultra-large rectangular continuous open caisson underground station in soft soil stratum</title><source>esp@cenet</source><creator>NIU YUCHAO ; FENG XIAOTAO ; ZHOU XI ; WU ZONGJIN ; FANG YUZHONG ; ZHANG HAO ; LIU CHANGJIANG ; GUO DEFU ; SU JIANXIANG ; ZHANG WENMING ; DI HUIJIE ; YANG CHEN ; PENG HAIKU ; LIN YONGXIAO ; HUANG YINGZHENG ; LI QIANG ; HE YATAO</creator><creatorcontrib>NIU YUCHAO ; FENG XIAOTAO ; ZHOU XI ; WU ZONGJIN ; FANG YUZHONG ; ZHANG HAO ; LIU CHANGJIANG ; GUO DEFU ; SU JIANXIANG ; ZHANG WENMING ; DI HUIJIE ; YANG CHEN ; PENG HAIKU ; LIN YONGXIAO ; HUANG YINGZHENG ; LI QIANG ; HE YATAO</creatorcontrib><description>The invention discloses a rapid construction method for an ultra-large rectangular continuous open caisson underground station in a soft soil stratum, which comprises the following steps of: dividing a continuous open caisson into seven open caisson sections, sequentially naming the open caisson sections as open caisson sections 1-7 from front to back, manufacturing each open caisson section for four times and sinking for two times, and correspondingly completing manufacturing of a main body of the open caisson section for one time; the sinking of the two sections of main bodies of the open caisson is correspondingly completed through one-time sinking, the continuous open caisson is divided into three stages for construction, the first stage is that the seventh open caisson moves in advance, the second stage is that the first, third and fifth open caissons follow up after meeting conditions, the third stage is that the second, fourth and sixth open caissons are constructed, and finally connecting sections bet</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240820&DB=EPODOC&CC=CN&NR=118517019A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25544,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240820&DB=EPODOC&CC=CN&NR=118517019A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>NIU YUCHAO</creatorcontrib><creatorcontrib>FENG XIAOTAO</creatorcontrib><creatorcontrib>ZHOU XI</creatorcontrib><creatorcontrib>WU ZONGJIN</creatorcontrib><creatorcontrib>FANG YUZHONG</creatorcontrib><creatorcontrib>ZHANG HAO</creatorcontrib><creatorcontrib>LIU CHANGJIANG</creatorcontrib><creatorcontrib>GUO DEFU</creatorcontrib><creatorcontrib>SU JIANXIANG</creatorcontrib><creatorcontrib>ZHANG WENMING</creatorcontrib><creatorcontrib>DI HUIJIE</creatorcontrib><creatorcontrib>YANG CHEN</creatorcontrib><creatorcontrib>PENG HAIKU</creatorcontrib><creatorcontrib>LIN YONGXIAO</creatorcontrib><creatorcontrib>HUANG YINGZHENG</creatorcontrib><creatorcontrib>LI QIANG</creatorcontrib><creatorcontrib>HE YATAO</creatorcontrib><title>Rapid construction method for ultra-large rectangular continuous open caisson underground station in soft soil stratum</title><description>The invention discloses a rapid construction method for an ultra-large rectangular continuous open caisson underground station in a soft soil stratum, which comprises the following steps of: dividing a continuous open caisson into seven open caisson sections, sequentially naming the open caisson sections as open caisson sections 1-7 from front to back, manufacturing each open caisson section for four times and sinking for two times, and correspondingly completing manufacturing of a main body of the open caisson section for one time; the sinking of the two sections of main bodies of the open caisson is correspondingly completed through one-time sinking, the continuous open caisson is divided into three stages for construction, the first stage is that the seventh open caisson moves in advance, the second stage is that the first, third and fifth open caissons follow up after meeting conditions, the third stage is that the second, fourth and sixth open caissons are constructed, and finally connecting sections bet</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjMEKwkAMRHvxIOo_xA8oWETUoxTFkwfxXsI2rQvbZNlk_X5X8QO8zGOGmZlXrztG34MTVkvZmReGiewpPQySIAdLWAdMI0EiZ8hjLu7TN89ZsoJEYnDoVcs0c09pTFIIavi98wwqgxXxoYQJLU_LajZgUFr9uKjWl_OjvdYUpSON6IjJuvbWNIdds980x9P2n84b7rVG_A</recordid><startdate>20240820</startdate><enddate>20240820</enddate><creator>NIU YUCHAO</creator><creator>FENG XIAOTAO</creator><creator>ZHOU XI</creator><creator>WU ZONGJIN</creator><creator>FANG YUZHONG</creator><creator>ZHANG HAO</creator><creator>LIU CHANGJIANG</creator><creator>GUO DEFU</creator><creator>SU JIANXIANG</creator><creator>ZHANG WENMING</creator><creator>DI HUIJIE</creator><creator>YANG CHEN</creator><creator>PENG HAIKU</creator><creator>LIN YONGXIAO</creator><creator>HUANG YINGZHENG</creator><creator>LI QIANG</creator><creator>HE YATAO</creator><scope>EVB</scope></search><sort><creationdate>20240820</creationdate><title>Rapid construction method for ultra-large rectangular continuous open caisson underground station in soft soil stratum</title><author>NIU YUCHAO ; FENG XIAOTAO ; ZHOU XI ; WU ZONGJIN ; FANG YUZHONG ; ZHANG HAO ; LIU CHANGJIANG ; GUO DEFU ; SU JIANXIANG ; ZHANG WENMING ; DI HUIJIE ; YANG CHEN ; PENG HAIKU ; LIN YONGXIAO ; HUANG YINGZHENG ; LI QIANG ; HE YATAO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118517019A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>NIU YUCHAO</creatorcontrib><creatorcontrib>FENG XIAOTAO</creatorcontrib><creatorcontrib>ZHOU XI</creatorcontrib><creatorcontrib>WU ZONGJIN</creatorcontrib><creatorcontrib>FANG YUZHONG</creatorcontrib><creatorcontrib>ZHANG HAO</creatorcontrib><creatorcontrib>LIU CHANGJIANG</creatorcontrib><creatorcontrib>GUO DEFU</creatorcontrib><creatorcontrib>SU JIANXIANG</creatorcontrib><creatorcontrib>ZHANG WENMING</creatorcontrib><creatorcontrib>DI HUIJIE</creatorcontrib><creatorcontrib>YANG CHEN</creatorcontrib><creatorcontrib>PENG HAIKU</creatorcontrib><creatorcontrib>LIN YONGXIAO</creatorcontrib><creatorcontrib>HUANG YINGZHENG</creatorcontrib><creatorcontrib>LI QIANG</creatorcontrib><creatorcontrib>HE YATAO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>NIU YUCHAO</au><au>FENG XIAOTAO</au><au>ZHOU XI</au><au>WU ZONGJIN</au><au>FANG YUZHONG</au><au>ZHANG HAO</au><au>LIU CHANGJIANG</au><au>GUO DEFU</au><au>SU JIANXIANG</au><au>ZHANG WENMING</au><au>DI HUIJIE</au><au>YANG CHEN</au><au>PENG HAIKU</au><au>LIN YONGXIAO</au><au>HUANG YINGZHENG</au><au>LI QIANG</au><au>HE YATAO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Rapid construction method for ultra-large rectangular continuous open caisson underground station in soft soil stratum</title><date>2024-08-20</date><risdate>2024</risdate><abstract>The invention discloses a rapid construction method for an ultra-large rectangular continuous open caisson underground station in a soft soil stratum, which comprises the following steps of: dividing a continuous open caisson into seven open caisson sections, sequentially naming the open caisson sections as open caisson sections 1-7 from front to back, manufacturing each open caisson section for four times and sinking for two times, and correspondingly completing manufacturing of a main body of the open caisson section for one time; the sinking of the two sections of main bodies of the open caisson is correspondingly completed through one-time sinking, the continuous open caisson is divided into three stages for construction, the first stage is that the seventh open caisson moves in advance, the second stage is that the first, third and fifth open caissons follow up after meeting conditions, the third stage is that the second, fourth and sixth open caissons are constructed, and finally connecting sections bet</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN118517019A |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Rapid construction method for ultra-large rectangular continuous open caisson underground station in soft soil stratum |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-28T04%3A57%3A35IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=NIU%20YUCHAO&rft.date=2024-08-20&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118517019A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |