Automatic power tower installation method and device for double-rocker-arm power derrick

The invention is suitable for the field of tower pole installation, and provides an automatic power tower installation method and device for a double-rocker-arm power derrick. According to the embodiment, the hoisting sequence and the hoisting positions of the hoisting pieces are determined on the c...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: TONG QI, WANG HANWEI, ZHOU LIHONG, WANG NING, ZHANG KAN, QI ZHUHUI, SHENG QUANWEN, LI KUNJUN, JIN HEXIANG, XU JINGLU
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator TONG QI
WANG HANWEI
ZHOU LIHONG
WANG NING
ZHANG KAN
QI ZHUHUI
SHENG QUANWEN
LI KUNJUN
JIN HEXIANG
XU JINGLU
description The invention is suitable for the field of tower pole installation, and provides an automatic power tower installation method and device for a double-rocker-arm power derrick. According to the embodiment, the hoisting sequence and the hoisting positions of the hoisting pieces are determined on the coordinate map of the power tower; and during subsequent transition and reinstallation, an electromagnetic lifting hook of the power tower is moved to an initial position determined according to the lifting position for three-dimensional modeling, after the maximum safety amplitude range of the power derrick is determined, all the lifting pieces needing to be installed are placed in the pre-installation position, and lifting ring coordinates and notch coordinates on all the lifting pieces are recorded. And by controlling the rotation angle and the amplitude variation distance of the electric derrick, the electromagnetic lifting hook is moved to the coordinates of the lifting ring and the coordinates of the notch to
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118461978A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118461978A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118461978A3</originalsourceid><addsrcrecordid>eNrjZIhwLC3Jz00syUxWKMgvTy1SKAGTmXnFJYk5OUDx_DyF3NSSjPwUhcS8FIWU1LLM5FSFtPwihZT80qScVN2i_OTs1CLdxKJcqAEpqUVFmcnZPAysaYk5xam8UJqbQdHNNcTZQze1ID8-tbggMTk1L7Uk3tnP0NDCxMzQ0tzC0ZgYNQDg5TrH</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Automatic power tower installation method and device for double-rocker-arm power derrick</title><source>esp@cenet</source><creator>TONG QI ; WANG HANWEI ; ZHOU LIHONG ; WANG NING ; ZHANG KAN ; QI ZHUHUI ; SHENG QUANWEN ; LI KUNJUN ; JIN HEXIANG ; XU JINGLU</creator><creatorcontrib>TONG QI ; WANG HANWEI ; ZHOU LIHONG ; WANG NING ; ZHANG KAN ; QI ZHUHUI ; SHENG QUANWEN ; LI KUNJUN ; JIN HEXIANG ; XU JINGLU</creatorcontrib><description>The invention is suitable for the field of tower pole installation, and provides an automatic power tower installation method and device for a double-rocker-arm power derrick. According to the embodiment, the hoisting sequence and the hoisting positions of the hoisting pieces are determined on the coordinate map of the power tower; and during subsequent transition and reinstallation, an electromagnetic lifting hook of the power tower is moved to an initial position determined according to the lifting position for three-dimensional modeling, after the maximum safety amplitude range of the power derrick is determined, all the lifting pieces needing to be installed are placed in the pre-installation position, and lifting ring coordinates and notch coordinates on all the lifting pieces are recorded. And by controlling the rotation angle and the amplitude variation distance of the electric derrick, the electromagnetic lifting hook is moved to the coordinates of the lifting ring and the coordinates of the notch to</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES ; CRANES ; FENCING ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; HAULING ; HOISTING ; LIFTING ; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES ; MASTS ; PERFORMING OPERATIONS ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING ; SWIMMING OR SPLASH BATHS OR POOLS ; TENTS OR CANOPIES, IN GENERAL ; TRANSPORTING</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240809&amp;DB=EPODOC&amp;CC=CN&amp;NR=118461978A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240809&amp;DB=EPODOC&amp;CC=CN&amp;NR=118461978A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>TONG QI</creatorcontrib><creatorcontrib>WANG HANWEI</creatorcontrib><creatorcontrib>ZHOU LIHONG</creatorcontrib><creatorcontrib>WANG NING</creatorcontrib><creatorcontrib>ZHANG KAN</creatorcontrib><creatorcontrib>QI ZHUHUI</creatorcontrib><creatorcontrib>SHENG QUANWEN</creatorcontrib><creatorcontrib>LI KUNJUN</creatorcontrib><creatorcontrib>JIN HEXIANG</creatorcontrib><creatorcontrib>XU JINGLU</creatorcontrib><title>Automatic power tower installation method and device for double-rocker-arm power derrick</title><description>The invention is suitable for the field of tower pole installation, and provides an automatic power tower installation method and device for a double-rocker-arm power derrick. According to the embodiment, the hoisting sequence and the hoisting positions of the hoisting pieces are determined on the coordinate map of the power tower; and during subsequent transition and reinstallation, an electromagnetic lifting hook of the power tower is moved to an initial position determined according to the lifting position for three-dimensional modeling, after the maximum safety amplitude range of the power derrick is determined, all the lifting pieces needing to be installed are placed in the pre-installation position, and lifting ring coordinates and notch coordinates on all the lifting pieces are recorded. And by controlling the rotation angle and the amplitude variation distance of the electric derrick, the electromagnetic lifting hook is moved to the coordinates of the lifting ring and the coordinates of the notch to</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES</subject><subject>CRANES</subject><subject>FENCING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>HAULING</subject><subject>HOISTING</subject><subject>LIFTING</subject><subject>LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES</subject><subject>MASTS</subject><subject>PERFORMING OPERATIONS</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>SWIMMING OR SPLASH BATHS OR POOLS</subject><subject>TENTS OR CANOPIES, IN GENERAL</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZIhwLC3Jz00syUxWKMgvTy1SKAGTmXnFJYk5OUDx_DyF3NSSjPwUhcS8FIWU1LLM5FSFtPwihZT80qScVN2i_OTs1CLdxKJcqAEpqUVFmcnZPAysaYk5xam8UJqbQdHNNcTZQze1ID8-tbggMTk1L7Uk3tnP0NDCxMzQ0tzC0ZgYNQDg5TrH</recordid><startdate>20240809</startdate><enddate>20240809</enddate><creator>TONG QI</creator><creator>WANG HANWEI</creator><creator>ZHOU LIHONG</creator><creator>WANG NING</creator><creator>ZHANG KAN</creator><creator>QI ZHUHUI</creator><creator>SHENG QUANWEN</creator><creator>LI KUNJUN</creator><creator>JIN HEXIANG</creator><creator>XU JINGLU</creator><scope>EVB</scope></search><sort><creationdate>20240809</creationdate><title>Automatic power tower installation method and device for double-rocker-arm power derrick</title><author>TONG QI ; WANG HANWEI ; ZHOU LIHONG ; WANG NING ; ZHANG KAN ; QI ZHUHUI ; SHENG QUANWEN ; LI KUNJUN ; JIN HEXIANG ; XU JINGLU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118461978A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES</topic><topic>CRANES</topic><topic>FENCING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>HAULING</topic><topic>HOISTING</topic><topic>LIFTING</topic><topic>LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES</topic><topic>MASTS</topic><topic>PERFORMING OPERATIONS</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>SWIMMING OR SPLASH BATHS OR POOLS</topic><topic>TENTS OR CANOPIES, IN GENERAL</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>TONG QI</creatorcontrib><creatorcontrib>WANG HANWEI</creatorcontrib><creatorcontrib>ZHOU LIHONG</creatorcontrib><creatorcontrib>WANG NING</creatorcontrib><creatorcontrib>ZHANG KAN</creatorcontrib><creatorcontrib>QI ZHUHUI</creatorcontrib><creatorcontrib>SHENG QUANWEN</creatorcontrib><creatorcontrib>LI KUNJUN</creatorcontrib><creatorcontrib>JIN HEXIANG</creatorcontrib><creatorcontrib>XU JINGLU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>TONG QI</au><au>WANG HANWEI</au><au>ZHOU LIHONG</au><au>WANG NING</au><au>ZHANG KAN</au><au>QI ZHUHUI</au><au>SHENG QUANWEN</au><au>LI KUNJUN</au><au>JIN HEXIANG</au><au>XU JINGLU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Automatic power tower installation method and device for double-rocker-arm power derrick</title><date>2024-08-09</date><risdate>2024</risdate><abstract>The invention is suitable for the field of tower pole installation, and provides an automatic power tower installation method and device for a double-rocker-arm power derrick. According to the embodiment, the hoisting sequence and the hoisting positions of the hoisting pieces are determined on the coordinate map of the power tower; and during subsequent transition and reinstallation, an electromagnetic lifting hook of the power tower is moved to an initial position determined according to the lifting position for three-dimensional modeling, after the maximum safety amplitude range of the power derrick is determined, all the lifting pieces needing to be installed are placed in the pre-installation position, and lifting ring coordinates and notch coordinates on all the lifting pieces are recorded. And by controlling the rotation angle and the amplitude variation distance of the electric derrick, the electromagnetic lifting hook is moved to the coordinates of the lifting ring and the coordinates of the notch to</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118461978A
source esp@cenet
subjects BUILDING
BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
CRANES
FENCING
FIXED CONSTRUCTIONS
FORMS
HANDLING BUILDING MATERIALS ON THE SITE
HAULING
HOISTING
LIFTING
LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES
MASTS
PERFORMING OPERATIONS
REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS
SCAFFOLDING
SHUTTERING
SWIMMING OR SPLASH BATHS OR POOLS
TENTS OR CANOPIES, IN GENERAL
TRANSPORTING
title Automatic power tower installation method and device for double-rocker-arm power derrick
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-19T09%3A15%3A43IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=TONG%20QI&rft.date=2024-08-09&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118461978A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true