Automatic power tower installation method and device for double-rocker-arm power derrick
The invention is suitable for the field of tower pole installation, and provides an automatic power tower installation method and device for a double-rocker-arm power derrick. According to the embodiment, the hoisting sequence and the hoisting positions of the hoisting pieces are determined on the c...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | TONG QI WANG HANWEI ZHOU LIHONG WANG NING ZHANG KAN QI ZHUHUI SHENG QUANWEN LI KUNJUN JIN HEXIANG XU JINGLU |
description | The invention is suitable for the field of tower pole installation, and provides an automatic power tower installation method and device for a double-rocker-arm power derrick. According to the embodiment, the hoisting sequence and the hoisting positions of the hoisting pieces are determined on the coordinate map of the power tower; and during subsequent transition and reinstallation, an electromagnetic lifting hook of the power tower is moved to an initial position determined according to the lifting position for three-dimensional modeling, after the maximum safety amplitude range of the power derrick is determined, all the lifting pieces needing to be installed are placed in the pre-installation position, and lifting ring coordinates and notch coordinates on all the lifting pieces are recorded. And by controlling the rotation angle and the amplitude variation distance of the electric derrick, the electromagnetic lifting hook is moved to the coordinates of the lifting ring and the coordinates of the notch to |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118461978A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118461978A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118461978A3</originalsourceid><addsrcrecordid>eNrjZIhwLC3Jz00syUxWKMgvTy1SKAGTmXnFJYk5OUDx_DyF3NSSjPwUhcS8FIWU1LLM5FSFtPwihZT80qScVN2i_OTs1CLdxKJcqAEpqUVFmcnZPAysaYk5xam8UJqbQdHNNcTZQze1ID8-tbggMTk1L7Uk3tnP0NDCxMzQ0tzC0ZgYNQDg5TrH</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Automatic power tower installation method and device for double-rocker-arm power derrick</title><source>esp@cenet</source><creator>TONG QI ; WANG HANWEI ; ZHOU LIHONG ; WANG NING ; ZHANG KAN ; QI ZHUHUI ; SHENG QUANWEN ; LI KUNJUN ; JIN HEXIANG ; XU JINGLU</creator><creatorcontrib>TONG QI ; WANG HANWEI ; ZHOU LIHONG ; WANG NING ; ZHANG KAN ; QI ZHUHUI ; SHENG QUANWEN ; LI KUNJUN ; JIN HEXIANG ; XU JINGLU</creatorcontrib><description>The invention is suitable for the field of tower pole installation, and provides an automatic power tower installation method and device for a double-rocker-arm power derrick. According to the embodiment, the hoisting sequence and the hoisting positions of the hoisting pieces are determined on the coordinate map of the power tower; and during subsequent transition and reinstallation, an electromagnetic lifting hook of the power tower is moved to an initial position determined according to the lifting position for three-dimensional modeling, after the maximum safety amplitude range of the power derrick is determined, all the lifting pieces needing to be installed are placed in the pre-installation position, and lifting ring coordinates and notch coordinates on all the lifting pieces are recorded. And by controlling the rotation angle and the amplitude variation distance of the electric derrick, the electromagnetic lifting hook is moved to the coordinates of the lifting ring and the coordinates of the notch to</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES ; CRANES ; FENCING ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; HAULING ; HOISTING ; LIFTING ; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES ; MASTS ; PERFORMING OPERATIONS ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING ; SWIMMING OR SPLASH BATHS OR POOLS ; TENTS OR CANOPIES, IN GENERAL ; TRANSPORTING</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240809&DB=EPODOC&CC=CN&NR=118461978A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240809&DB=EPODOC&CC=CN&NR=118461978A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>TONG QI</creatorcontrib><creatorcontrib>WANG HANWEI</creatorcontrib><creatorcontrib>ZHOU LIHONG</creatorcontrib><creatorcontrib>WANG NING</creatorcontrib><creatorcontrib>ZHANG KAN</creatorcontrib><creatorcontrib>QI ZHUHUI</creatorcontrib><creatorcontrib>SHENG QUANWEN</creatorcontrib><creatorcontrib>LI KUNJUN</creatorcontrib><creatorcontrib>JIN HEXIANG</creatorcontrib><creatorcontrib>XU JINGLU</creatorcontrib><title>Automatic power tower installation method and device for double-rocker-arm power derrick</title><description>The invention is suitable for the field of tower pole installation, and provides an automatic power tower installation method and device for a double-rocker-arm power derrick. According to the embodiment, the hoisting sequence and the hoisting positions of the hoisting pieces are determined on the coordinate map of the power tower; and during subsequent transition and reinstallation, an electromagnetic lifting hook of the power tower is moved to an initial position determined according to the lifting position for three-dimensional modeling, after the maximum safety amplitude range of the power derrick is determined, all the lifting pieces needing to be installed are placed in the pre-installation position, and lifting ring coordinates and notch coordinates on all the lifting pieces are recorded. And by controlling the rotation angle and the amplitude variation distance of the electric derrick, the electromagnetic lifting hook is moved to the coordinates of the lifting ring and the coordinates of the notch to</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES</subject><subject>CRANES</subject><subject>FENCING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>HAULING</subject><subject>HOISTING</subject><subject>LIFTING</subject><subject>LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES</subject><subject>MASTS</subject><subject>PERFORMING OPERATIONS</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>SWIMMING OR SPLASH BATHS OR POOLS</subject><subject>TENTS OR CANOPIES, IN GENERAL</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZIhwLC3Jz00syUxWKMgvTy1SKAGTmXnFJYk5OUDx_DyF3NSSjPwUhcS8FIWU1LLM5FSFtPwihZT80qScVN2i_OTs1CLdxKJcqAEpqUVFmcnZPAysaYk5xam8UJqbQdHNNcTZQze1ID8-tbggMTk1L7Uk3tnP0NDCxMzQ0tzC0ZgYNQDg5TrH</recordid><startdate>20240809</startdate><enddate>20240809</enddate><creator>TONG QI</creator><creator>WANG HANWEI</creator><creator>ZHOU LIHONG</creator><creator>WANG NING</creator><creator>ZHANG KAN</creator><creator>QI ZHUHUI</creator><creator>SHENG QUANWEN</creator><creator>LI KUNJUN</creator><creator>JIN HEXIANG</creator><creator>XU JINGLU</creator><scope>EVB</scope></search><sort><creationdate>20240809</creationdate><title>Automatic power tower installation method and device for double-rocker-arm power derrick</title><author>TONG QI ; WANG HANWEI ; ZHOU LIHONG ; WANG NING ; ZHANG KAN ; QI ZHUHUI ; SHENG QUANWEN ; LI KUNJUN ; JIN HEXIANG ; XU JINGLU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118461978A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES</topic><topic>CRANES</topic><topic>FENCING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>HAULING</topic><topic>HOISTING</topic><topic>LIFTING</topic><topic>LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES</topic><topic>MASTS</topic><topic>PERFORMING OPERATIONS</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>SWIMMING OR SPLASH BATHS OR POOLS</topic><topic>TENTS OR CANOPIES, IN GENERAL</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>TONG QI</creatorcontrib><creatorcontrib>WANG HANWEI</creatorcontrib><creatorcontrib>ZHOU LIHONG</creatorcontrib><creatorcontrib>WANG NING</creatorcontrib><creatorcontrib>ZHANG KAN</creatorcontrib><creatorcontrib>QI ZHUHUI</creatorcontrib><creatorcontrib>SHENG QUANWEN</creatorcontrib><creatorcontrib>LI KUNJUN</creatorcontrib><creatorcontrib>JIN HEXIANG</creatorcontrib><creatorcontrib>XU JINGLU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>TONG QI</au><au>WANG HANWEI</au><au>ZHOU LIHONG</au><au>WANG NING</au><au>ZHANG KAN</au><au>QI ZHUHUI</au><au>SHENG QUANWEN</au><au>LI KUNJUN</au><au>JIN HEXIANG</au><au>XU JINGLU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Automatic power tower installation method and device for double-rocker-arm power derrick</title><date>2024-08-09</date><risdate>2024</risdate><abstract>The invention is suitable for the field of tower pole installation, and provides an automatic power tower installation method and device for a double-rocker-arm power derrick. According to the embodiment, the hoisting sequence and the hoisting positions of the hoisting pieces are determined on the coordinate map of the power tower; and during subsequent transition and reinstallation, an electromagnetic lifting hook of the power tower is moved to an initial position determined according to the lifting position for three-dimensional modeling, after the maximum safety amplitude range of the power derrick is determined, all the lifting pieces needing to be installed are placed in the pre-installation position, and lifting ring coordinates and notch coordinates on all the lifting pieces are recorded. And by controlling the rotation angle and the amplitude variation distance of the electric derrick, the electromagnetic lifting hook is moved to the coordinates of the lifting ring and the coordinates of the notch to</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN118461978A |
source | esp@cenet |
subjects | BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES CRANES FENCING FIXED CONSTRUCTIONS FORMS HANDLING BUILDING MATERIALS ON THE SITE HAULING HOISTING LIFTING LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES MASTS PERFORMING OPERATIONS REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS SCAFFOLDING SHUTTERING SWIMMING OR SPLASH BATHS OR POOLS TENTS OR CANOPIES, IN GENERAL TRANSPORTING |
title | Automatic power tower installation method and device for double-rocker-arm power derrick |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-19T09%3A15%3A43IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=TONG%20QI&rft.date=2024-08-09&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118461978A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |