Bow section construction method, bow section and ship
The invention belongs to the technical field of ship construction, and discloses a bow section construction method, a bow section and a ship. According to the bow section building method, the bow section can be assembled and manufactured, the bow section comprises a bow tip part, a bow upper part an...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | MIAO MINRUI LIU ZHENG LEI JIANFENG LI HUAPING ZHOU HAIFENG WANG HONGBO PENG WEIHUA |
description | The invention belongs to the technical field of ship construction, and discloses a bow section construction method, a bow section and a ship. According to the bow section building method, the bow section can be assembled and manufactured, the bow section comprises a bow tip part, a bow upper part and a bow lower part, the bow upper part and the bow lower part are connected in the height direction of the ship, and the bow tip part is arranged at the end of the bow upper part and the end of the bow lower part in the longitudinal direction of the ship. The bow section construction method comprises the following steps: S100, manufacturing the bow tip part, the bow upper part and the bow lower part in sections; s200, folding and assembling the bow upper part by taking the bow lower part as an assembling reference; and S300, taking the whole body of the lower bow part and the upper bow part as an assembly reference, and folding and assembling the bow tip part. According to the bow section construction method, weldi |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118457857A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118457857A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118457857A3</originalsourceid><addsrcrecordid>eNrjZDB1yi9XKE5NLsnMz1NIzs8rLikqhXByU0sy8lN0FJKQFCTmpSgUZ2QW8DCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeGc_Q0MLE1NzC1NzR2Ni1AAAZqwtMQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Bow section construction method, bow section and ship</title><source>esp@cenet</source><creator>MIAO MINRUI ; LIU ZHENG ; LEI JIANFENG ; LI HUAPING ; ZHOU HAIFENG ; WANG HONGBO ; PENG WEIHUA</creator><creatorcontrib>MIAO MINRUI ; LIU ZHENG ; LEI JIANFENG ; LI HUAPING ; ZHOU HAIFENG ; WANG HONGBO ; PENG WEIHUA</creatorcontrib><description>The invention belongs to the technical field of ship construction, and discloses a bow section construction method, a bow section and a ship. According to the bow section building method, the bow section can be assembled and manufactured, the bow section comprises a bow tip part, a bow upper part and a bow lower part, the bow upper part and the bow lower part are connected in the height direction of the ship, and the bow tip part is arranged at the end of the bow upper part and the end of the bow lower part in the longitudinal direction of the ship. The bow section construction method comprises the following steps: S100, manufacturing the bow tip part, the bow upper part and the bow lower part in sections; s200, folding and assembling the bow upper part by taking the bow lower part as an assembling reference; and S300, taking the whole body of the lower bow part and the upper bow part as an assembly reference, and folding and assembling the bow tip part. According to the bow section construction method, weldi</description><language>chi ; eng</language><subject>EQUIPMENT FOR SHIPPING ; PERFORMING OPERATIONS ; RELATED EQUIPMENT ; SHIPS OR OTHER WATERBORNE VESSELS ; TRANSPORTING</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240809&DB=EPODOC&CC=CN&NR=118457857A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25545,76296</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240809&DB=EPODOC&CC=CN&NR=118457857A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>MIAO MINRUI</creatorcontrib><creatorcontrib>LIU ZHENG</creatorcontrib><creatorcontrib>LEI JIANFENG</creatorcontrib><creatorcontrib>LI HUAPING</creatorcontrib><creatorcontrib>ZHOU HAIFENG</creatorcontrib><creatorcontrib>WANG HONGBO</creatorcontrib><creatorcontrib>PENG WEIHUA</creatorcontrib><title>Bow section construction method, bow section and ship</title><description>The invention belongs to the technical field of ship construction, and discloses a bow section construction method, a bow section and a ship. According to the bow section building method, the bow section can be assembled and manufactured, the bow section comprises a bow tip part, a bow upper part and a bow lower part, the bow upper part and the bow lower part are connected in the height direction of the ship, and the bow tip part is arranged at the end of the bow upper part and the end of the bow lower part in the longitudinal direction of the ship. The bow section construction method comprises the following steps: S100, manufacturing the bow tip part, the bow upper part and the bow lower part in sections; s200, folding and assembling the bow upper part by taking the bow lower part as an assembling reference; and S300, taking the whole body of the lower bow part and the upper bow part as an assembly reference, and folding and assembling the bow tip part. According to the bow section construction method, weldi</description><subject>EQUIPMENT FOR SHIPPING</subject><subject>PERFORMING OPERATIONS</subject><subject>RELATED EQUIPMENT</subject><subject>SHIPS OR OTHER WATERBORNE VESSELS</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDB1yi9XKE5NLsnMz1NIzs8rLikqhXByU0sy8lN0FJKQFCTmpSgUZ2QW8DCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeGc_Q0MLE1NzC1NzR2Ni1AAAZqwtMQ</recordid><startdate>20240809</startdate><enddate>20240809</enddate><creator>MIAO MINRUI</creator><creator>LIU ZHENG</creator><creator>LEI JIANFENG</creator><creator>LI HUAPING</creator><creator>ZHOU HAIFENG</creator><creator>WANG HONGBO</creator><creator>PENG WEIHUA</creator><scope>EVB</scope></search><sort><creationdate>20240809</creationdate><title>Bow section construction method, bow section and ship</title><author>MIAO MINRUI ; LIU ZHENG ; LEI JIANFENG ; LI HUAPING ; ZHOU HAIFENG ; WANG HONGBO ; PENG WEIHUA</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118457857A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>EQUIPMENT FOR SHIPPING</topic><topic>PERFORMING OPERATIONS</topic><topic>RELATED EQUIPMENT</topic><topic>SHIPS OR OTHER WATERBORNE VESSELS</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>MIAO MINRUI</creatorcontrib><creatorcontrib>LIU ZHENG</creatorcontrib><creatorcontrib>LEI JIANFENG</creatorcontrib><creatorcontrib>LI HUAPING</creatorcontrib><creatorcontrib>ZHOU HAIFENG</creatorcontrib><creatorcontrib>WANG HONGBO</creatorcontrib><creatorcontrib>PENG WEIHUA</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>MIAO MINRUI</au><au>LIU ZHENG</au><au>LEI JIANFENG</au><au>LI HUAPING</au><au>ZHOU HAIFENG</au><au>WANG HONGBO</au><au>PENG WEIHUA</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Bow section construction method, bow section and ship</title><date>2024-08-09</date><risdate>2024</risdate><abstract>The invention belongs to the technical field of ship construction, and discloses a bow section construction method, a bow section and a ship. According to the bow section building method, the bow section can be assembled and manufactured, the bow section comprises a bow tip part, a bow upper part and a bow lower part, the bow upper part and the bow lower part are connected in the height direction of the ship, and the bow tip part is arranged at the end of the bow upper part and the end of the bow lower part in the longitudinal direction of the ship. The bow section construction method comprises the following steps: S100, manufacturing the bow tip part, the bow upper part and the bow lower part in sections; s200, folding and assembling the bow upper part by taking the bow lower part as an assembling reference; and S300, taking the whole body of the lower bow part and the upper bow part as an assembly reference, and folding and assembling the bow tip part. According to the bow section construction method, weldi</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN118457857A |
source | esp@cenet |
subjects | EQUIPMENT FOR SHIPPING PERFORMING OPERATIONS RELATED EQUIPMENT SHIPS OR OTHER WATERBORNE VESSELS TRANSPORTING |
title | Bow section construction method, bow section and ship |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-20T06%3A42%3A27IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=MIAO%20MINRUI&rft.date=2024-08-09&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118457857A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |