Crawling formwork for bridge construction

The invention provides a crawling formwork for bridge construction, and belongs to the technical field of bridge pier construction. The crawling formwork for bridge construction comprises a formwork body, a platform, a track and a crawler, the platform is provided with a right-angled n-shaped hangin...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: KONG XU, WANG JUNHAI, WANG FULIANG, LIU BENLI, SHI QIONG, MA QINJI, WANG CHANGSONG, MA BIN, ZHANG RUNLIN, LI LU, JIN MIN, HAN XIAOMING, SONG LINAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator KONG XU
WANG JUNHAI
WANG FULIANG
LIU BENLI
SHI QIONG
MA QINJI
WANG CHANGSONG
MA BIN
ZHANG RUNLIN
LI LU
JIN MIN
HAN XIAOMING
SONG LINAN
description The invention provides a crawling formwork for bridge construction, and belongs to the technical field of bridge pier construction. The crawling formwork for bridge construction comprises a formwork body, a platform, a track and a crawler, the platform is provided with a right-angled n-shaped hanging bracket with an upward opening, the two ends of the top of the hanging bracket are connected with winches through steel wire ropes, the winches are installed on the platform, and the track is connected with the crawler through steel wire ropes. The platform is provided with a channel groove for the hanging bracket to bear the template to pass through the platform up and down, the platform is provided with a first oil cylinder for controlling the template to open/close, the extending end of the first oil cylinder is connected with a pushing plate, and the pushing plate is arranged to be separable from the template. The device has the advantages that the formwork is efficiently transferred between the platform and
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118422596A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118422596A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118422596A3</originalsourceid><addsrcrecordid>eNrjZNB0Lkosz8nMS1dIyy_KLc8vygYxFJKKMlPSUxWS8_OKS4pKk0sy8_N4GFjTEnOKU3mhNDeDoptriLOHbmpBfnxqcUFicmpeakm8s5-hoYWJkZGppZmjMTFqAC6NKSk</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Crawling formwork for bridge construction</title><source>esp@cenet</source><creator>KONG XU ; WANG JUNHAI ; WANG FULIANG ; LIU BENLI ; SHI QIONG ; MA QINJI ; WANG CHANGSONG ; MA BIN ; ZHANG RUNLIN ; LI LU ; JIN MIN ; HAN XIAOMING ; SONG LINAN</creator><creatorcontrib>KONG XU ; WANG JUNHAI ; WANG FULIANG ; LIU BENLI ; SHI QIONG ; MA QINJI ; WANG CHANGSONG ; MA BIN ; ZHANG RUNLIN ; LI LU ; JIN MIN ; HAN XIAOMING ; SONG LINAN</creatorcontrib><description>The invention provides a crawling formwork for bridge construction, and belongs to the technical field of bridge pier construction. The crawling formwork for bridge construction comprises a formwork body, a platform, a track and a crawler, the platform is provided with a right-angled n-shaped hanging bracket with an upward opening, the two ends of the top of the hanging bracket are connected with winches through steel wire ropes, the winches are installed on the platform, and the track is connected with the crawler through steel wire ropes. The platform is provided with a channel groove for the hanging bracket to bear the template to pass through the platform up and down, the platform is provided with a first oil cylinder for controlling the template to open/close, the extending end of the first oil cylinder is connected with a pushing plate, and the pushing plate is arranged to be separable from the template. The device has the advantages that the formwork is efficiently transferred between the platform and</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240802&amp;DB=EPODOC&amp;CC=CN&amp;NR=118422596A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76318</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240802&amp;DB=EPODOC&amp;CC=CN&amp;NR=118422596A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>KONG XU</creatorcontrib><creatorcontrib>WANG JUNHAI</creatorcontrib><creatorcontrib>WANG FULIANG</creatorcontrib><creatorcontrib>LIU BENLI</creatorcontrib><creatorcontrib>SHI QIONG</creatorcontrib><creatorcontrib>MA QINJI</creatorcontrib><creatorcontrib>WANG CHANGSONG</creatorcontrib><creatorcontrib>MA BIN</creatorcontrib><creatorcontrib>ZHANG RUNLIN</creatorcontrib><creatorcontrib>LI LU</creatorcontrib><creatorcontrib>JIN MIN</creatorcontrib><creatorcontrib>HAN XIAOMING</creatorcontrib><creatorcontrib>SONG LINAN</creatorcontrib><title>Crawling formwork for bridge construction</title><description>The invention provides a crawling formwork for bridge construction, and belongs to the technical field of bridge pier construction. The crawling formwork for bridge construction comprises a formwork body, a platform, a track and a crawler, the platform is provided with a right-angled n-shaped hanging bracket with an upward opening, the two ends of the top of the hanging bracket are connected with winches through steel wire ropes, the winches are installed on the platform, and the track is connected with the crawler through steel wire ropes. The platform is provided with a channel groove for the hanging bracket to bear the template to pass through the platform up and down, the platform is provided with a first oil cylinder for controlling the template to open/close, the extending end of the first oil cylinder is connected with a pushing plate, and the pushing plate is arranged to be separable from the template. The device has the advantages that the formwork is efficiently transferred between the platform and</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNB0Lkosz8nMS1dIyy_KLc8vygYxFJKKMlPSUxWS8_OKS4pKk0sy8_N4GFjTEnOKU3mhNDeDoptriLOHbmpBfnxqcUFicmpeakm8s5-hoYWJkZGppZmjMTFqAC6NKSk</recordid><startdate>20240802</startdate><enddate>20240802</enddate><creator>KONG XU</creator><creator>WANG JUNHAI</creator><creator>WANG FULIANG</creator><creator>LIU BENLI</creator><creator>SHI QIONG</creator><creator>MA QINJI</creator><creator>WANG CHANGSONG</creator><creator>MA BIN</creator><creator>ZHANG RUNLIN</creator><creator>LI LU</creator><creator>JIN MIN</creator><creator>HAN XIAOMING</creator><creator>SONG LINAN</creator><scope>EVB</scope></search><sort><creationdate>20240802</creationdate><title>Crawling formwork for bridge construction</title><author>KONG XU ; WANG JUNHAI ; WANG FULIANG ; LIU BENLI ; SHI QIONG ; MA QINJI ; WANG CHANGSONG ; MA BIN ; ZHANG RUNLIN ; LI LU ; JIN MIN ; HAN XIAOMING ; SONG LINAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118422596A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>KONG XU</creatorcontrib><creatorcontrib>WANG JUNHAI</creatorcontrib><creatorcontrib>WANG FULIANG</creatorcontrib><creatorcontrib>LIU BENLI</creatorcontrib><creatorcontrib>SHI QIONG</creatorcontrib><creatorcontrib>MA QINJI</creatorcontrib><creatorcontrib>WANG CHANGSONG</creatorcontrib><creatorcontrib>MA BIN</creatorcontrib><creatorcontrib>ZHANG RUNLIN</creatorcontrib><creatorcontrib>LI LU</creatorcontrib><creatorcontrib>JIN MIN</creatorcontrib><creatorcontrib>HAN XIAOMING</creatorcontrib><creatorcontrib>SONG LINAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>KONG XU</au><au>WANG JUNHAI</au><au>WANG FULIANG</au><au>LIU BENLI</au><au>SHI QIONG</au><au>MA QINJI</au><au>WANG CHANGSONG</au><au>MA BIN</au><au>ZHANG RUNLIN</au><au>LI LU</au><au>JIN MIN</au><au>HAN XIAOMING</au><au>SONG LINAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Crawling formwork for bridge construction</title><date>2024-08-02</date><risdate>2024</risdate><abstract>The invention provides a crawling formwork for bridge construction, and belongs to the technical field of bridge pier construction. The crawling formwork for bridge construction comprises a formwork body, a platform, a track and a crawler, the platform is provided with a right-angled n-shaped hanging bracket with an upward opening, the two ends of the top of the hanging bracket are connected with winches through steel wire ropes, the winches are installed on the platform, and the track is connected with the crawler through steel wire ropes. The platform is provided with a channel groove for the hanging bracket to bear the template to pass through the platform up and down, the platform is provided with a first oil cylinder for controlling the template to open/close, the extending end of the first oil cylinder is connected with a pushing plate, and the pushing plate is arranged to be separable from the template. The device has the advantages that the formwork is efficiently transferred between the platform and</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118422596A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Crawling formwork for bridge construction
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-09T09%3A33%3A38IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=KONG%20XU&rft.date=2024-08-02&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118422596A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true