Settlement treatment grouting device for high fill construction foundation

The invention discloses a settlement treatment grouting device for a high-fill construction foundation, and relates to the technical field of grouting devices for construction foundations, the settlement treatment grouting device for the high-fill construction foundation comprises an outer fixing fr...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG WENLAN, LI CHAO, AYITASHE, BAHZATI, HAN JUNRUI, SONG CHAO, TURET ¨ ¢ MAT, CHEN LUN, M ¨ ¢ TIM ¨ ¢ N, CHENG JINGKE, MAHATI, YEHOFEN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WANG WENLAN
LI CHAO
AYITASHE, BAHZATI
HAN JUNRUI
SONG CHAO
TURET ¨ ¢ MAT
CHEN LUN
M ¨ ¢ TIM ¨ ¢ N
CHENG JINGKE
MAHATI, YEHOFEN
description The invention discloses a settlement treatment grouting device for a high-fill construction foundation, and relates to the technical field of grouting devices for construction foundations, the settlement treatment grouting device for the high-fill construction foundation comprises an outer fixing frame, and the top of the outer fixing frame is fixedly connected with a power mechanism. A motor body is fixed outside a driving shaft, the motor body is started to enable the driving shaft to rotate, a driven wheel drives an inner driving vertical pipe to rotate, a high-pressure water pipe and an excavation toothed plate are installed at the bottom of the inner driving vertical pipe, and when the inner driving vertical pipe rotates downwards, the excavation toothed plate excavates a high-fill foundation. Impact of a high-pressure water gun is carried out while excavation is carried out, so that water seepage is further carried out on the high-fill foundation, further sedimentation of a grouting part is facilitated,
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118390500A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118390500A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118390500A3</originalsourceid><addsrcrecordid>eNrjZPAKTi0pyUnNTc0rUSgpSk0sAbPSi_JLSzLz0hVSUssyk1MV0vKLFDIy0zMU0jJzchSS8_OKS4pKk0sy8_OAUqV5KYkgJg8Da1piTnEqL5TmZlB0cw1x9tBNLciPTy0uSExOzUstiXf2MzS0MLY0MDUwcDQmRg0AkdY17w</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Settlement treatment grouting device for high fill construction foundation</title><source>esp@cenet</source><creator>WANG WENLAN ; LI CHAO ; AYITASHE, BAHZATI ; HAN JUNRUI ; SONG CHAO ; TURET ¨ ¢ MAT ; CHEN LUN ; M ¨ ¢ TIM ¨ ¢ N ; CHENG JINGKE ; MAHATI, YEHOFEN</creator><creatorcontrib>WANG WENLAN ; LI CHAO ; AYITASHE, BAHZATI ; HAN JUNRUI ; SONG CHAO ; TURET ¨ ¢ MAT ; CHEN LUN ; M ¨ ¢ TIM ¨ ¢ N ; CHENG JINGKE ; MAHATI, YEHOFEN</creatorcontrib><description>The invention discloses a settlement treatment grouting device for a high-fill construction foundation, and relates to the technical field of grouting devices for construction foundations, the settlement treatment grouting device for the high-fill construction foundation comprises an outer fixing frame, and the top of the outer fixing frame is fixedly connected with a power mechanism. A motor body is fixed outside a driving shaft, the motor body is started to enable the driving shaft to rotate, a driven wheel drives an inner driving vertical pipe to rotate, a high-pressure water pipe and an excavation toothed plate are installed at the bottom of the inner driving vertical pipe, and when the inner driving vertical pipe rotates downwards, the excavation toothed plate excavates a high-fill foundation. Impact of a high-pressure water gun is carried out while excavation is carried out, so that water seepage is further carried out on the high-fill foundation, further sedimentation of a grouting part is facilitated,</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240726&amp;DB=EPODOC&amp;CC=CN&amp;NR=118390500A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240726&amp;DB=EPODOC&amp;CC=CN&amp;NR=118390500A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG WENLAN</creatorcontrib><creatorcontrib>LI CHAO</creatorcontrib><creatorcontrib>AYITASHE, BAHZATI</creatorcontrib><creatorcontrib>HAN JUNRUI</creatorcontrib><creatorcontrib>SONG CHAO</creatorcontrib><creatorcontrib>TURET ¨ ¢ MAT</creatorcontrib><creatorcontrib>CHEN LUN</creatorcontrib><creatorcontrib>M ¨ ¢ TIM ¨ ¢ N</creatorcontrib><creatorcontrib>CHENG JINGKE</creatorcontrib><creatorcontrib>MAHATI, YEHOFEN</creatorcontrib><title>Settlement treatment grouting device for high fill construction foundation</title><description>The invention discloses a settlement treatment grouting device for a high-fill construction foundation, and relates to the technical field of grouting devices for construction foundations, the settlement treatment grouting device for the high-fill construction foundation comprises an outer fixing frame, and the top of the outer fixing frame is fixedly connected with a power mechanism. A motor body is fixed outside a driving shaft, the motor body is started to enable the driving shaft to rotate, a driven wheel drives an inner driving vertical pipe to rotate, a high-pressure water pipe and an excavation toothed plate are installed at the bottom of the inner driving vertical pipe, and when the inner driving vertical pipe rotates downwards, the excavation toothed plate excavates a high-fill foundation. Impact of a high-pressure water gun is carried out while excavation is carried out, so that water seepage is further carried out on the high-fill foundation, further sedimentation of a grouting part is facilitated,</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPAKTi0pyUnNTc0rUSgpSk0sAbPSi_JLSzLz0hVSUssyk1MV0vKLFDIy0zMU0jJzchSS8_OKS4pKk0sy8_OAUqV5KYkgJg8Da1piTnEqL5TmZlB0cw1x9tBNLciPTy0uSExOzUstiXf2MzS0MLY0MDUwcDQmRg0AkdY17w</recordid><startdate>20240726</startdate><enddate>20240726</enddate><creator>WANG WENLAN</creator><creator>LI CHAO</creator><creator>AYITASHE, BAHZATI</creator><creator>HAN JUNRUI</creator><creator>SONG CHAO</creator><creator>TURET ¨ ¢ MAT</creator><creator>CHEN LUN</creator><creator>M ¨ ¢ TIM ¨ ¢ N</creator><creator>CHENG JINGKE</creator><creator>MAHATI, YEHOFEN</creator><scope>EVB</scope></search><sort><creationdate>20240726</creationdate><title>Settlement treatment grouting device for high fill construction foundation</title><author>WANG WENLAN ; LI CHAO ; AYITASHE, BAHZATI ; HAN JUNRUI ; SONG CHAO ; TURET ¨ ¢ MAT ; CHEN LUN ; M ¨ ¢ TIM ¨ ¢ N ; CHENG JINGKE ; MAHATI, YEHOFEN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118390500A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG WENLAN</creatorcontrib><creatorcontrib>LI CHAO</creatorcontrib><creatorcontrib>AYITASHE, BAHZATI</creatorcontrib><creatorcontrib>HAN JUNRUI</creatorcontrib><creatorcontrib>SONG CHAO</creatorcontrib><creatorcontrib>TURET ¨ ¢ MAT</creatorcontrib><creatorcontrib>CHEN LUN</creatorcontrib><creatorcontrib>M ¨ ¢ TIM ¨ ¢ N</creatorcontrib><creatorcontrib>CHENG JINGKE</creatorcontrib><creatorcontrib>MAHATI, YEHOFEN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG WENLAN</au><au>LI CHAO</au><au>AYITASHE, BAHZATI</au><au>HAN JUNRUI</au><au>SONG CHAO</au><au>TURET ¨ ¢ MAT</au><au>CHEN LUN</au><au>M ¨ ¢ TIM ¨ ¢ N</au><au>CHENG JINGKE</au><au>MAHATI, YEHOFEN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Settlement treatment grouting device for high fill construction foundation</title><date>2024-07-26</date><risdate>2024</risdate><abstract>The invention discloses a settlement treatment grouting device for a high-fill construction foundation, and relates to the technical field of grouting devices for construction foundations, the settlement treatment grouting device for the high-fill construction foundation comprises an outer fixing frame, and the top of the outer fixing frame is fixedly connected with a power mechanism. A motor body is fixed outside a driving shaft, the motor body is started to enable the driving shaft to rotate, a driven wheel drives an inner driving vertical pipe to rotate, a high-pressure water pipe and an excavation toothed plate are installed at the bottom of the inner driving vertical pipe, and when the inner driving vertical pipe rotates downwards, the excavation toothed plate excavates a high-fill foundation. Impact of a high-pressure water gun is carried out while excavation is carried out, so that water seepage is further carried out on the high-fill foundation, further sedimentation of a grouting part is facilitated,</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118390500A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Settlement treatment grouting device for high fill construction foundation
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-20T05%3A42%3A30IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20WENLAN&rft.date=2024-07-26&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118390500A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true