Tunnel grouting method based on numerical simulation fault fracture zone

The invention discloses a numerical simulation-based fault fracture zone tunnel grouting method. The method comprises the following steps: acquiring geological data of a tunnel construction section; based on an advanced geological prediction method, predicting the geological condition in front of th...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WEN XIAOKAI, GAO JUN, WU HANGTONG, WEI JUNWEN, KANG JUNTAO, LIU KAIWEN, LI SONGZHEN, LI HONGZHOU, QI YONGGUO, XU DONGSHENG, XUE HUILING, CHEN GENG, CHEN SHANXIONG, ZHOU BIN, LIAO XIANLUO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WEN XIAOKAI
GAO JUN
WU HANGTONG
WEI JUNWEN
KANG JUNTAO
LIU KAIWEN
LI SONGZHEN
LI HONGZHOU
QI YONGGUO
XU DONGSHENG
XUE HUILING
CHEN GENG
CHEN SHANXIONG
ZHOU BIN
LIAO XIANLUO
description The invention discloses a numerical simulation-based fault fracture zone tunnel grouting method. The method comprises the following steps: acquiring geological data of a tunnel construction section; based on an advanced geological prediction method, predicting the geological condition in front of the tunnel face of the tunnel construction section to obtain a prediction result of the geological condition in front of the tunnel face; inputting the geological data and the prediction result of the geological condition in front of the tunnel face into a pre-trained three-dimensional numerical model of the fault fracture zone to obtain a prediction result of the fault fracture zone; based on the fault fracture zone prediction result, a tunnel construction grouting scheme is determined; and tunnel construction section grouting is completed based on the tunnel construction grouting scheme. By performing accurate fault fracture zone prediction on the tunnel, geological conditions and problems possibly encountered in c
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118378332A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118378332A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118378332A3</originalsourceid><addsrcrecordid>eNqNyjEOwjAMQNEsDKhwB3MAhpKBrqgCderUvTKpUyIlTpXYC6eHgQMwfenp780wKTNFWEtWCbxCInnlBZ5YaYHMwJqoBIcRakgaUcIXPWoU8AWdaCF4Z6aD2XmMlY6_Nub0uE_9cKYtz1Q3dMQkcz-2bWevnbWXm_3n-QDheTTS</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Tunnel grouting method based on numerical simulation fault fracture zone</title><source>esp@cenet</source><creator>WEN XIAOKAI ; GAO JUN ; WU HANGTONG ; WEI JUNWEN ; KANG JUNTAO ; LIU KAIWEN ; LI SONGZHEN ; LI HONGZHOU ; QI YONGGUO ; XU DONGSHENG ; XUE HUILING ; CHEN GENG ; CHEN SHANXIONG ; ZHOU BIN ; LIAO XIANLUO</creator><creatorcontrib>WEN XIAOKAI ; GAO JUN ; WU HANGTONG ; WEI JUNWEN ; KANG JUNTAO ; LIU KAIWEN ; LI SONGZHEN ; LI HONGZHOU ; QI YONGGUO ; XU DONGSHENG ; XUE HUILING ; CHEN GENG ; CHEN SHANXIONG ; ZHOU BIN ; LIAO XIANLUO</creatorcontrib><description>The invention discloses a numerical simulation-based fault fracture zone tunnel grouting method. The method comprises the following steps: acquiring geological data of a tunnel construction section; based on an advanced geological prediction method, predicting the geological condition in front of the tunnel face of the tunnel construction section to obtain a prediction result of the geological condition in front of the tunnel face; inputting the geological data and the prediction result of the geological condition in front of the tunnel face into a pre-trained three-dimensional numerical model of the fault fracture zone to obtain a prediction result of the fault fracture zone; based on the fault fracture zone prediction result, a tunnel construction grouting scheme is determined; and tunnel construction section grouting is completed based on the tunnel construction grouting scheme. By performing accurate fault fracture zone prediction on the tunnel, geological conditions and problems possibly encountered in c</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; ELECTRIC DIGITAL DATA PROCESSING ; PHYSICS</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240723&amp;DB=EPODOC&amp;CC=CN&amp;NR=118378332A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240723&amp;DB=EPODOC&amp;CC=CN&amp;NR=118378332A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WEN XIAOKAI</creatorcontrib><creatorcontrib>GAO JUN</creatorcontrib><creatorcontrib>WU HANGTONG</creatorcontrib><creatorcontrib>WEI JUNWEN</creatorcontrib><creatorcontrib>KANG JUNTAO</creatorcontrib><creatorcontrib>LIU KAIWEN</creatorcontrib><creatorcontrib>LI SONGZHEN</creatorcontrib><creatorcontrib>LI HONGZHOU</creatorcontrib><creatorcontrib>QI YONGGUO</creatorcontrib><creatorcontrib>XU DONGSHENG</creatorcontrib><creatorcontrib>XUE HUILING</creatorcontrib><creatorcontrib>CHEN GENG</creatorcontrib><creatorcontrib>CHEN SHANXIONG</creatorcontrib><creatorcontrib>ZHOU BIN</creatorcontrib><creatorcontrib>LIAO XIANLUO</creatorcontrib><title>Tunnel grouting method based on numerical simulation fault fracture zone</title><description>The invention discloses a numerical simulation-based fault fracture zone tunnel grouting method. The method comprises the following steps: acquiring geological data of a tunnel construction section; based on an advanced geological prediction method, predicting the geological condition in front of the tunnel face of the tunnel construction section to obtain a prediction result of the geological condition in front of the tunnel face; inputting the geological data and the prediction result of the geological condition in front of the tunnel face into a pre-trained three-dimensional numerical model of the fault fracture zone to obtain a prediction result of the fault fracture zone; based on the fault fracture zone prediction result, a tunnel construction grouting scheme is determined; and tunnel construction section grouting is completed based on the tunnel construction grouting scheme. By performing accurate fault fracture zone prediction on the tunnel, geological conditions and problems possibly encountered in c</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>ELECTRIC DIGITAL DATA PROCESSING</subject><subject>PHYSICS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyjEOwjAMQNEsDKhwB3MAhpKBrqgCderUvTKpUyIlTpXYC6eHgQMwfenp780wKTNFWEtWCbxCInnlBZ5YaYHMwJqoBIcRakgaUcIXPWoU8AWdaCF4Z6aD2XmMlY6_Nub0uE_9cKYtz1Q3dMQkcz-2bWevnbWXm_3n-QDheTTS</recordid><startdate>20240723</startdate><enddate>20240723</enddate><creator>WEN XIAOKAI</creator><creator>GAO JUN</creator><creator>WU HANGTONG</creator><creator>WEI JUNWEN</creator><creator>KANG JUNTAO</creator><creator>LIU KAIWEN</creator><creator>LI SONGZHEN</creator><creator>LI HONGZHOU</creator><creator>QI YONGGUO</creator><creator>XU DONGSHENG</creator><creator>XUE HUILING</creator><creator>CHEN GENG</creator><creator>CHEN SHANXIONG</creator><creator>ZHOU BIN</creator><creator>LIAO XIANLUO</creator><scope>EVB</scope></search><sort><creationdate>20240723</creationdate><title>Tunnel grouting method based on numerical simulation fault fracture zone</title><author>WEN XIAOKAI ; GAO JUN ; WU HANGTONG ; WEI JUNWEN ; KANG JUNTAO ; LIU KAIWEN ; LI SONGZHEN ; LI HONGZHOU ; QI YONGGUO ; XU DONGSHENG ; XUE HUILING ; CHEN GENG ; CHEN SHANXIONG ; ZHOU BIN ; LIAO XIANLUO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118378332A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>ELECTRIC DIGITAL DATA PROCESSING</topic><topic>PHYSICS</topic><toplevel>online_resources</toplevel><creatorcontrib>WEN XIAOKAI</creatorcontrib><creatorcontrib>GAO JUN</creatorcontrib><creatorcontrib>WU HANGTONG</creatorcontrib><creatorcontrib>WEI JUNWEN</creatorcontrib><creatorcontrib>KANG JUNTAO</creatorcontrib><creatorcontrib>LIU KAIWEN</creatorcontrib><creatorcontrib>LI SONGZHEN</creatorcontrib><creatorcontrib>LI HONGZHOU</creatorcontrib><creatorcontrib>QI YONGGUO</creatorcontrib><creatorcontrib>XU DONGSHENG</creatorcontrib><creatorcontrib>XUE HUILING</creatorcontrib><creatorcontrib>CHEN GENG</creatorcontrib><creatorcontrib>CHEN SHANXIONG</creatorcontrib><creatorcontrib>ZHOU BIN</creatorcontrib><creatorcontrib>LIAO XIANLUO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WEN XIAOKAI</au><au>GAO JUN</au><au>WU HANGTONG</au><au>WEI JUNWEN</au><au>KANG JUNTAO</au><au>LIU KAIWEN</au><au>LI SONGZHEN</au><au>LI HONGZHOU</au><au>QI YONGGUO</au><au>XU DONGSHENG</au><au>XUE HUILING</au><au>CHEN GENG</au><au>CHEN SHANXIONG</au><au>ZHOU BIN</au><au>LIAO XIANLUO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Tunnel grouting method based on numerical simulation fault fracture zone</title><date>2024-07-23</date><risdate>2024</risdate><abstract>The invention discloses a numerical simulation-based fault fracture zone tunnel grouting method. The method comprises the following steps: acquiring geological data of a tunnel construction section; based on an advanced geological prediction method, predicting the geological condition in front of the tunnel face of the tunnel construction section to obtain a prediction result of the geological condition in front of the tunnel face; inputting the geological data and the prediction result of the geological condition in front of the tunnel face into a pre-trained three-dimensional numerical model of the fault fracture zone to obtain a prediction result of the fault fracture zone; based on the fault fracture zone prediction result, a tunnel construction grouting scheme is determined; and tunnel construction section grouting is completed based on the tunnel construction grouting scheme. By performing accurate fault fracture zone prediction on the tunnel, geological conditions and problems possibly encountered in c</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118378332A
source esp@cenet
subjects CALCULATING
COMPUTING
COUNTING
ELECTRIC DIGITAL DATA PROCESSING
PHYSICS
title Tunnel grouting method based on numerical simulation fault fracture zone
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-07T11%3A37%3A18IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WEN%20XIAOKAI&rft.date=2024-07-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118378332A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true