Hollow pier cap capping construction method
The invention discloses a hollow pier cap capping construction method, which belongs to the technical field of bridge construction, and comprises the following steps of: pouring a chamfer on the inner ring of the pier top of a hollow pier, reserving a depth of 10-15cm without pouring, and pre-embedd...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | XUE XIAOLEI YANG YUQIANG QIN CHENSHENG WEI WENYUAN FU CHONGYANG SHAN LIANKUN FENG LI SUN MINGYU CAI ZHIBO WU YONGZHEN |
description | The invention discloses a hollow pier cap capping construction method, which belongs to the technical field of bridge construction, and comprises the following steps of: pouring a chamfer on the inner ring of the pier top of a hollow pier, reserving a depth of 10-15cm without pouring, and pre-embedding a chamfer reinforcing rib; a prefabricated cover plate with the thickness of 15 cm is laid on the chamfers, reserved steel bars are arranged on the side wall of the periphery of the prefabricated cover plate, and chamfer reinforcing ribs and pier body vertical steel bars are welded to the reserved steel bars; concrete with the thickness of 25 cm is poured on the prefabricated cover plate, the chamfer and the pier top of the hollow pier, and a pier cap bottom formwork is formed; and after the pier cap bottom formwork is cured, a pier cap reinforcement cage is bound at the top end of the pier cap bottom formwork, and then concrete is poured to form the pier cap. The chamfer is used as a mounting space of the pref |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118375067A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118375067A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118375067A3</originalsourceid><addsrcrecordid>eNrjZND2yM_JyS9XKMhMLVJITiwA4YLMvHSF5Py84pKi0uSSzPw8hdzUkoz8FB4G1rTEnOJUXijNzaDo5hri7KGbWpAfn1pckJicmpdaEu_sZ2hoYWxuamBm7mhMjBoAcsUppQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Hollow pier cap capping construction method</title><source>esp@cenet</source><creator>XUE XIAOLEI ; YANG YUQIANG ; QIN CHENSHENG ; WEI WENYUAN ; FU CHONGYANG ; SHAN LIANKUN ; FENG LI ; SUN MINGYU ; CAI ZHIBO ; WU YONGZHEN</creator><creatorcontrib>XUE XIAOLEI ; YANG YUQIANG ; QIN CHENSHENG ; WEI WENYUAN ; FU CHONGYANG ; SHAN LIANKUN ; FENG LI ; SUN MINGYU ; CAI ZHIBO ; WU YONGZHEN</creatorcontrib><description>The invention discloses a hollow pier cap capping construction method, which belongs to the technical field of bridge construction, and comprises the following steps of: pouring a chamfer on the inner ring of the pier top of a hollow pier, reserving a depth of 10-15cm without pouring, and pre-embedding a chamfer reinforcing rib; a prefabricated cover plate with the thickness of 15 cm is laid on the chamfers, reserved steel bars are arranged on the side wall of the periphery of the prefabricated cover plate, and chamfer reinforcing ribs and pier body vertical steel bars are welded to the reserved steel bars; concrete with the thickness of 25 cm is poured on the prefabricated cover plate, the chamfer and the pier top of the hollow pier, and a pier cap bottom formwork is formed; and after the pier cap bottom formwork is cured, a pier cap reinforcement cage is bound at the top end of the pier cap bottom formwork, and then concrete is poured to form the pier cap. The chamfer is used as a mounting space of the pref</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; OR VIADUCTS ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240723&DB=EPODOC&CC=CN&NR=118375067A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240723&DB=EPODOC&CC=CN&NR=118375067A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>XUE XIAOLEI</creatorcontrib><creatorcontrib>YANG YUQIANG</creatorcontrib><creatorcontrib>QIN CHENSHENG</creatorcontrib><creatorcontrib>WEI WENYUAN</creatorcontrib><creatorcontrib>FU CHONGYANG</creatorcontrib><creatorcontrib>SHAN LIANKUN</creatorcontrib><creatorcontrib>FENG LI</creatorcontrib><creatorcontrib>SUN MINGYU</creatorcontrib><creatorcontrib>CAI ZHIBO</creatorcontrib><creatorcontrib>WU YONGZHEN</creatorcontrib><title>Hollow pier cap capping construction method</title><description>The invention discloses a hollow pier cap capping construction method, which belongs to the technical field of bridge construction, and comprises the following steps of: pouring a chamfer on the inner ring of the pier top of a hollow pier, reserving a depth of 10-15cm without pouring, and pre-embedding a chamfer reinforcing rib; a prefabricated cover plate with the thickness of 15 cm is laid on the chamfers, reserved steel bars are arranged on the side wall of the periphery of the prefabricated cover plate, and chamfer reinforcing ribs and pier body vertical steel bars are welded to the reserved steel bars; concrete with the thickness of 25 cm is poured on the prefabricated cover plate, the chamfer and the pier top of the hollow pier, and a pier cap bottom formwork is formed; and after the pier cap bottom formwork is cured, a pier cap reinforcement cage is bound at the top end of the pier cap bottom formwork, and then concrete is poured to form the pier cap. The chamfer is used as a mounting space of the pref</description><subject>ASSEMBLY OF BRIDGES</subject><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>OR VIADUCTS</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZND2yM_JyS9XKMhMLVJITiwA4YLMvHSF5Py84pKi0uSSzPw8hdzUkoz8FB4G1rTEnOJUXijNzaDo5hri7KGbWpAfn1pckJicmpdaEu_sZ2hoYWxuamBm7mhMjBoAcsUppQ</recordid><startdate>20240723</startdate><enddate>20240723</enddate><creator>XUE XIAOLEI</creator><creator>YANG YUQIANG</creator><creator>QIN CHENSHENG</creator><creator>WEI WENYUAN</creator><creator>FU CHONGYANG</creator><creator>SHAN LIANKUN</creator><creator>FENG LI</creator><creator>SUN MINGYU</creator><creator>CAI ZHIBO</creator><creator>WU YONGZHEN</creator><scope>EVB</scope></search><sort><creationdate>20240723</creationdate><title>Hollow pier cap capping construction method</title><author>XUE XIAOLEI ; YANG YUQIANG ; QIN CHENSHENG ; WEI WENYUAN ; FU CHONGYANG ; SHAN LIANKUN ; FENG LI ; SUN MINGYU ; CAI ZHIBO ; WU YONGZHEN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118375067A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>OR VIADUCTS</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><toplevel>online_resources</toplevel><creatorcontrib>XUE XIAOLEI</creatorcontrib><creatorcontrib>YANG YUQIANG</creatorcontrib><creatorcontrib>QIN CHENSHENG</creatorcontrib><creatorcontrib>WEI WENYUAN</creatorcontrib><creatorcontrib>FU CHONGYANG</creatorcontrib><creatorcontrib>SHAN LIANKUN</creatorcontrib><creatorcontrib>FENG LI</creatorcontrib><creatorcontrib>SUN MINGYU</creatorcontrib><creatorcontrib>CAI ZHIBO</creatorcontrib><creatorcontrib>WU YONGZHEN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>XUE XIAOLEI</au><au>YANG YUQIANG</au><au>QIN CHENSHENG</au><au>WEI WENYUAN</au><au>FU CHONGYANG</au><au>SHAN LIANKUN</au><au>FENG LI</au><au>SUN MINGYU</au><au>CAI ZHIBO</au><au>WU YONGZHEN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Hollow pier cap capping construction method</title><date>2024-07-23</date><risdate>2024</risdate><abstract>The invention discloses a hollow pier cap capping construction method, which belongs to the technical field of bridge construction, and comprises the following steps of: pouring a chamfer on the inner ring of the pier top of a hollow pier, reserving a depth of 10-15cm without pouring, and pre-embedding a chamfer reinforcing rib; a prefabricated cover plate with the thickness of 15 cm is laid on the chamfers, reserved steel bars are arranged on the side wall of the periphery of the prefabricated cover plate, and chamfer reinforcing ribs and pier body vertical steel bars are welded to the reserved steel bars; concrete with the thickness of 25 cm is poured on the prefabricated cover plate, the chamfer and the pier top of the hollow pier, and a pier cap bottom formwork is formed; and after the pier cap bottom formwork is cured, a pier cap reinforcement cage is bound at the top end of the pier cap bottom formwork, and then concrete is poured to form the pier cap. The chamfer is used as a mounting space of the pref</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN118375067A |
source | esp@cenet |
subjects | ASSEMBLY OF BRIDGES BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE CONSTRUCTION OF BRIDGES CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES FIXED CONSTRUCTIONS FORMS HANDLING BUILDING MATERIALS ON THE SITE OR VIADUCTS REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS SCAFFOLDING SHUTTERING |
title | Hollow pier cap capping construction method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-02T04%3A02%3A59IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=XUE%20XIAOLEI&rft.date=2024-07-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118375067A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |