Processing model construction method and processing method for monitoring data of extra-high voltage transformer
The invention discloses a processing model construction method and a processing method for monitoring data of an extra-high voltage transformer. The processing model construction method comprises the following steps: acquiring historical monitoring data of the extra-high voltage transformer; preproc...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a processing model construction method and a processing method for monitoring data of an extra-high voltage transformer. The processing model construction method comprises the following steps: acquiring historical monitoring data of the extra-high voltage transformer; preprocessing the historical monitoring data; performing abnormal point detection on the preprocessed historical monitoring data by using an abnormal point detection algorithm; based on the preprocessed historical monitoring data and the detection result, a random forest processing model is constructed, the random forest processing model is used for processing to-be-processed monitoring data of the extra-high voltage transformer and outputting a processing result, and the processing result represents distribution characteristics of the to-be-processed monitoring data; the distribution characteristic is used for determining a storage mode of the to-be-processed monitoring data in the data warehouse. According to the method |
---|