Maintenance scheduling plan management system and method

The invention provides a maintenance scheduling plan management method. The method comprises the following steps: S1, a maintenance application unit registers and compiles a maintenance plan work ticket; s2, associating the work ticket with the planned work, and pushing the work ticket to a dispatch...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YANG CHUNBO, ZHANG CANCAN, YANG YANG, TAKESHIGE, JIN RUOBIN, LI YUNFENG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator YANG CHUNBO
ZHANG CANCAN
YANG YANG
TAKESHIGE
JIN RUOBIN
LI YUNFENG
description The invention provides a maintenance scheduling plan management method. The method comprises the following steps: S1, a maintenance application unit registers and compiles a maintenance plan work ticket; s2, associating the work ticket with the planned work, and pushing the work ticket to a dispatcher for auditing; s3, according to an audit result of the dispatcher, batch answering is carried out on a maintenance application unit; s4, a maintenance application unit plans to write a corresponding operation instruction ticket according to the power grid plan and maintenance work, and pushes the operation instruction ticket to a dispatcher for auditing; s5, the dispatcher pre-sends a plan operation instruction ticket to a ticket receiving unit, whether the maintenance equipment is important channel and heavy load section composition equipment or not is intelligently researched and judged before preset power failure operation is started, it is confirmed that the maintenance equipment has operation conditions with
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118297581A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118297581A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118297581A3</originalsourceid><addsrcrecordid>eNrjZLDwTczMK0nNS8xLTlUoTs5ITSnNycxLVyjIScxTyE3MS0xPzU3NK1EoriwuSc1VSMxLUchNLcnIT-FhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfHOfoaGFkaW5qYWho7GxKgBACuuLp0</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Maintenance scheduling plan management system and method</title><source>esp@cenet</source><creator>YANG CHUNBO ; ZHANG CANCAN ; YANG YANG ; TAKESHIGE ; JIN RUOBIN ; LI YUNFENG</creator><creatorcontrib>YANG CHUNBO ; ZHANG CANCAN ; YANG YANG ; TAKESHIGE ; JIN RUOBIN ; LI YUNFENG</creatorcontrib><description>The invention provides a maintenance scheduling plan management method. The method comprises the following steps: S1, a maintenance application unit registers and compiles a maintenance plan work ticket; s2, associating the work ticket with the planned work, and pushing the work ticket to a dispatcher for auditing; s3, according to an audit result of the dispatcher, batch answering is carried out on a maintenance application unit; s4, a maintenance application unit plans to write a corresponding operation instruction ticket according to the power grid plan and maintenance work, and pushes the operation instruction ticket to a dispatcher for auditing; s5, the dispatcher pre-sends a plan operation instruction ticket to a ticket receiving unit, whether the maintenance equipment is important channel and heavy load section composition equipment or not is intelligently researched and judged before preset power failure operation is started, it is confirmed that the maintenance equipment has operation conditions with</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240705&amp;DB=EPODOC&amp;CC=CN&amp;NR=118297581A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240705&amp;DB=EPODOC&amp;CC=CN&amp;NR=118297581A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YANG CHUNBO</creatorcontrib><creatorcontrib>ZHANG CANCAN</creatorcontrib><creatorcontrib>YANG YANG</creatorcontrib><creatorcontrib>TAKESHIGE</creatorcontrib><creatorcontrib>JIN RUOBIN</creatorcontrib><creatorcontrib>LI YUNFENG</creatorcontrib><title>Maintenance scheduling plan management system and method</title><description>The invention provides a maintenance scheduling plan management method. The method comprises the following steps: S1, a maintenance application unit registers and compiles a maintenance plan work ticket; s2, associating the work ticket with the planned work, and pushing the work ticket to a dispatcher for auditing; s3, according to an audit result of the dispatcher, batch answering is carried out on a maintenance application unit; s4, a maintenance application unit plans to write a corresponding operation instruction ticket according to the power grid plan and maintenance work, and pushes the operation instruction ticket to a dispatcher for auditing; s5, the dispatcher pre-sends a plan operation instruction ticket to a ticket receiving unit, whether the maintenance equipment is important channel and heavy load section composition equipment or not is intelligently researched and judged before preset power failure operation is started, it is confirmed that the maintenance equipment has operation conditions with</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLDwTczMK0nNS8xLTlUoTs5ITSnNycxLVyjIScxTyE3MS0xPzU3NK1EoriwuSc1VSMxLUchNLcnIT-FhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfHOfoaGFkaW5qYWho7GxKgBACuuLp0</recordid><startdate>20240705</startdate><enddate>20240705</enddate><creator>YANG CHUNBO</creator><creator>ZHANG CANCAN</creator><creator>YANG YANG</creator><creator>TAKESHIGE</creator><creator>JIN RUOBIN</creator><creator>LI YUNFENG</creator><scope>EVB</scope></search><sort><creationdate>20240705</creationdate><title>Maintenance scheduling plan management system and method</title><author>YANG CHUNBO ; ZHANG CANCAN ; YANG YANG ; TAKESHIGE ; JIN RUOBIN ; LI YUNFENG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118297581A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>YANG CHUNBO</creatorcontrib><creatorcontrib>ZHANG CANCAN</creatorcontrib><creatorcontrib>YANG YANG</creatorcontrib><creatorcontrib>TAKESHIGE</creatorcontrib><creatorcontrib>JIN RUOBIN</creatorcontrib><creatorcontrib>LI YUNFENG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YANG CHUNBO</au><au>ZHANG CANCAN</au><au>YANG YANG</au><au>TAKESHIGE</au><au>JIN RUOBIN</au><au>LI YUNFENG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Maintenance scheduling plan management system and method</title><date>2024-07-05</date><risdate>2024</risdate><abstract>The invention provides a maintenance scheduling plan management method. The method comprises the following steps: S1, a maintenance application unit registers and compiles a maintenance plan work ticket; s2, associating the work ticket with the planned work, and pushing the work ticket to a dispatcher for auditing; s3, according to an audit result of the dispatcher, batch answering is carried out on a maintenance application unit; s4, a maintenance application unit plans to write a corresponding operation instruction ticket according to the power grid plan and maintenance work, and pushes the operation instruction ticket to a dispatcher for auditing; s5, the dispatcher pre-sends a plan operation instruction ticket to a ticket receiving unit, whether the maintenance equipment is important channel and heavy load section composition equipment or not is intelligently researched and judged before preset power failure operation is started, it is confirmed that the maintenance equipment has operation conditions with</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118297581A
source esp@cenet
subjects CALCULATING
COMPUTING
COUNTING
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES
PHYSICS
SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR
title Maintenance scheduling plan management system and method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-10T04%3A24%3A08IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YANG%20CHUNBO&rft.date=2024-07-05&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118297581A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true