Maintenance scheduling plan management system and method
The invention provides a maintenance scheduling plan management method. The method comprises the following steps: S1, a maintenance application unit registers and compiles a maintenance plan work ticket; s2, associating the work ticket with the planned work, and pushing the work ticket to a dispatch...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | YANG CHUNBO ZHANG CANCAN YANG YANG TAKESHIGE JIN RUOBIN LI YUNFENG |
description | The invention provides a maintenance scheduling plan management method. The method comprises the following steps: S1, a maintenance application unit registers and compiles a maintenance plan work ticket; s2, associating the work ticket with the planned work, and pushing the work ticket to a dispatcher for auditing; s3, according to an audit result of the dispatcher, batch answering is carried out on a maintenance application unit; s4, a maintenance application unit plans to write a corresponding operation instruction ticket according to the power grid plan and maintenance work, and pushes the operation instruction ticket to a dispatcher for auditing; s5, the dispatcher pre-sends a plan operation instruction ticket to a ticket receiving unit, whether the maintenance equipment is important channel and heavy load section composition equipment or not is intelligently researched and judged before preset power failure operation is started, it is confirmed that the maintenance equipment has operation conditions with |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118297581A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118297581A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118297581A3</originalsourceid><addsrcrecordid>eNrjZLDwTczMK0nNS8xLTlUoTs5ITSnNycxLVyjIScxTyE3MS0xPzU3NK1EoriwuSc1VSMxLUchNLcnIT-FhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfHOfoaGFkaW5qYWho7GxKgBACuuLp0</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Maintenance scheduling plan management system and method</title><source>esp@cenet</source><creator>YANG CHUNBO ; ZHANG CANCAN ; YANG YANG ; TAKESHIGE ; JIN RUOBIN ; LI YUNFENG</creator><creatorcontrib>YANG CHUNBO ; ZHANG CANCAN ; YANG YANG ; TAKESHIGE ; JIN RUOBIN ; LI YUNFENG</creatorcontrib><description>The invention provides a maintenance scheduling plan management method. The method comprises the following steps: S1, a maintenance application unit registers and compiles a maintenance plan work ticket; s2, associating the work ticket with the planned work, and pushing the work ticket to a dispatcher for auditing; s3, according to an audit result of the dispatcher, batch answering is carried out on a maintenance application unit; s4, a maintenance application unit plans to write a corresponding operation instruction ticket according to the power grid plan and maintenance work, and pushes the operation instruction ticket to a dispatcher for auditing; s5, the dispatcher pre-sends a plan operation instruction ticket to a ticket receiving unit, whether the maintenance equipment is important channel and heavy load section composition equipment or not is intelligently researched and judged before preset power failure operation is started, it is confirmed that the maintenance equipment has operation conditions with</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240705&DB=EPODOC&CC=CN&NR=118297581A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240705&DB=EPODOC&CC=CN&NR=118297581A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YANG CHUNBO</creatorcontrib><creatorcontrib>ZHANG CANCAN</creatorcontrib><creatorcontrib>YANG YANG</creatorcontrib><creatorcontrib>TAKESHIGE</creatorcontrib><creatorcontrib>JIN RUOBIN</creatorcontrib><creatorcontrib>LI YUNFENG</creatorcontrib><title>Maintenance scheduling plan management system and method</title><description>The invention provides a maintenance scheduling plan management method. The method comprises the following steps: S1, a maintenance application unit registers and compiles a maintenance plan work ticket; s2, associating the work ticket with the planned work, and pushing the work ticket to a dispatcher for auditing; s3, according to an audit result of the dispatcher, batch answering is carried out on a maintenance application unit; s4, a maintenance application unit plans to write a corresponding operation instruction ticket according to the power grid plan and maintenance work, and pushes the operation instruction ticket to a dispatcher for auditing; s5, the dispatcher pre-sends a plan operation instruction ticket to a ticket receiving unit, whether the maintenance equipment is important channel and heavy load section composition equipment or not is intelligently researched and judged before preset power failure operation is started, it is confirmed that the maintenance equipment has operation conditions with</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLDwTczMK0nNS8xLTlUoTs5ITSnNycxLVyjIScxTyE3MS0xPzU3NK1EoriwuSc1VSMxLUchNLcnIT-FhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfHOfoaGFkaW5qYWho7GxKgBACuuLp0</recordid><startdate>20240705</startdate><enddate>20240705</enddate><creator>YANG CHUNBO</creator><creator>ZHANG CANCAN</creator><creator>YANG YANG</creator><creator>TAKESHIGE</creator><creator>JIN RUOBIN</creator><creator>LI YUNFENG</creator><scope>EVB</scope></search><sort><creationdate>20240705</creationdate><title>Maintenance scheduling plan management system and method</title><author>YANG CHUNBO ; ZHANG CANCAN ; YANG YANG ; TAKESHIGE ; JIN RUOBIN ; LI YUNFENG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118297581A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>YANG CHUNBO</creatorcontrib><creatorcontrib>ZHANG CANCAN</creatorcontrib><creatorcontrib>YANG YANG</creatorcontrib><creatorcontrib>TAKESHIGE</creatorcontrib><creatorcontrib>JIN RUOBIN</creatorcontrib><creatorcontrib>LI YUNFENG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YANG CHUNBO</au><au>ZHANG CANCAN</au><au>YANG YANG</au><au>TAKESHIGE</au><au>JIN RUOBIN</au><au>LI YUNFENG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Maintenance scheduling plan management system and method</title><date>2024-07-05</date><risdate>2024</risdate><abstract>The invention provides a maintenance scheduling plan management method. The method comprises the following steps: S1, a maintenance application unit registers and compiles a maintenance plan work ticket; s2, associating the work ticket with the planned work, and pushing the work ticket to a dispatcher for auditing; s3, according to an audit result of the dispatcher, batch answering is carried out on a maintenance application unit; s4, a maintenance application unit plans to write a corresponding operation instruction ticket according to the power grid plan and maintenance work, and pushes the operation instruction ticket to a dispatcher for auditing; s5, the dispatcher pre-sends a plan operation instruction ticket to a ticket receiving unit, whether the maintenance equipment is important channel and heavy load section composition equipment or not is intelligently researched and judged before preset power failure operation is started, it is confirmed that the maintenance equipment has operation conditions with</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN118297581A |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | Maintenance scheduling plan management system and method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-10T04%3A24%3A08IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YANG%20CHUNBO&rft.date=2024-07-05&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118297581A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |