Roadbed reconstruction mode based on existing road

The invention relates to the technical field of roadbed reconstruction, in particular to a roadbed reconstruction mode based on an existing road, which comprises the following steps: S1, burying a drainage pipe in a drainage channel of a cement layer, reserving a branch pipe, and pouring a concrete...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: MAO LINGHUI, SHI JING, ZHUO XIN, SHEN LONGHUA
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator MAO LINGHUI
SHI JING
ZHUO XIN
SHEN LONGHUA
description The invention relates to the technical field of roadbed reconstruction, in particular to a roadbed reconstruction mode based on an existing road, which comprises the following steps: S1, burying a drainage pipe in a drainage channel of a cement layer, reserving a branch pipe, and pouring a concrete layer in the drainage channel to fix the drainage pipe; s2, a base layer is poured on the cement layer, a mounting cavity is formed in the top of the base layer, a plurality of drainage tanks are placed in the mounting cavity, the drainage tanks are provided with water guide grooves, and the water guide grooves communicate with the branch pipes; s3, an anti-cracking layer is poured on the base layer; s4, an asphalt layer is poured on the anti-cracking layer; and S5, curbs are arranged on the two sides of the asphalt layer in the width direction of the road. The installation cavity is formed in the base layer, the drainage tank is embedded in the installation cavity and communicated with the drainage pipe, water inf
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118273178A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118273178A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118273178A3</originalsourceid><addsrcrecordid>eNrjZDAKyk9MSUpNUShKTc7PKy4pKk0uyczPU8jNT0lVSEosBsoAeakVmcUlmXnpCkVA1TwMrGmJOcWpvFCam0HRzTXE2UM3tSA_PrW4IDE5NS-1JN7Zz9DQwsjc2NDcwtGYGDUA1rMsKg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Roadbed reconstruction mode based on existing road</title><source>esp@cenet</source><creator>MAO LINGHUI ; SHI JING ; ZHUO XIN ; SHEN LONGHUA</creator><creatorcontrib>MAO LINGHUI ; SHI JING ; ZHUO XIN ; SHEN LONGHUA</creatorcontrib><description>The invention relates to the technical field of roadbed reconstruction, in particular to a roadbed reconstruction mode based on an existing road, which comprises the following steps: S1, burying a drainage pipe in a drainage channel of a cement layer, reserving a branch pipe, and pouring a concrete layer in the drainage channel to fix the drainage pipe; s2, a base layer is poured on the cement layer, a mounting cavity is formed in the top of the base layer, a plurality of drainage tanks are placed in the mounting cavity, the drainage tanks are provided with water guide grooves, and the water guide grooves communicate with the branch pipes; s3, an anti-cracking layer is poured on the base layer; s4, an asphalt layer is poured on the anti-cracking layer; and S5, curbs are arranged on the two sides of the asphalt layer in the width direction of the road. The installation cavity is formed in the base layer, the drainage tank is embedded in the installation cavity and communicated with the drainage pipe, water inf</description><language>chi ; eng</language><subject>CESSPOOLS ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE ; FIXED CONSTRUCTIONS ; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR ; SEWERAGE ; SEWERS ; WATER SUPPLY</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240702&amp;DB=EPODOC&amp;CC=CN&amp;NR=118273178A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240702&amp;DB=EPODOC&amp;CC=CN&amp;NR=118273178A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>MAO LINGHUI</creatorcontrib><creatorcontrib>SHI JING</creatorcontrib><creatorcontrib>ZHUO XIN</creatorcontrib><creatorcontrib>SHEN LONGHUA</creatorcontrib><title>Roadbed reconstruction mode based on existing road</title><description>The invention relates to the technical field of roadbed reconstruction, in particular to a roadbed reconstruction mode based on an existing road, which comprises the following steps: S1, burying a drainage pipe in a drainage channel of a cement layer, reserving a branch pipe, and pouring a concrete layer in the drainage channel to fix the drainage pipe; s2, a base layer is poured on the cement layer, a mounting cavity is formed in the top of the base layer, a plurality of drainage tanks are placed in the mounting cavity, the drainage tanks are provided with water guide grooves, and the water guide grooves communicate with the branch pipes; s3, an anti-cracking layer is poured on the base layer; s4, an asphalt layer is poured on the anti-cracking layer; and S5, curbs are arranged on the two sides of the asphalt layer in the width direction of the road. The installation cavity is formed in the base layer, the drainage tank is embedded in the installation cavity and communicated with the drainage pipe, water inf</description><subject>CESSPOOLS</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</subject><subject>SEWERAGE</subject><subject>SEWERS</subject><subject>WATER SUPPLY</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDAKyk9MSUpNUShKTc7PKy4pKk0uyczPU8jNT0lVSEosBsoAeakVmcUlmXnpCkVA1TwMrGmJOcWpvFCam0HRzTXE2UM3tSA_PrW4IDE5NS-1JN7Zz9DQwsjc2NDcwtGYGDUA1rMsKg</recordid><startdate>20240702</startdate><enddate>20240702</enddate><creator>MAO LINGHUI</creator><creator>SHI JING</creator><creator>ZHUO XIN</creator><creator>SHEN LONGHUA</creator><scope>EVB</scope></search><sort><creationdate>20240702</creationdate><title>Roadbed reconstruction mode based on existing road</title><author>MAO LINGHUI ; SHI JING ; ZHUO XIN ; SHEN LONGHUA</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118273178A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>CESSPOOLS</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</topic><topic>SEWERAGE</topic><topic>SEWERS</topic><topic>WATER SUPPLY</topic><toplevel>online_resources</toplevel><creatorcontrib>MAO LINGHUI</creatorcontrib><creatorcontrib>SHI JING</creatorcontrib><creatorcontrib>ZHUO XIN</creatorcontrib><creatorcontrib>SHEN LONGHUA</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>MAO LINGHUI</au><au>SHI JING</au><au>ZHUO XIN</au><au>SHEN LONGHUA</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Roadbed reconstruction mode based on existing road</title><date>2024-07-02</date><risdate>2024</risdate><abstract>The invention relates to the technical field of roadbed reconstruction, in particular to a roadbed reconstruction mode based on an existing road, which comprises the following steps: S1, burying a drainage pipe in a drainage channel of a cement layer, reserving a branch pipe, and pouring a concrete layer in the drainage channel to fix the drainage pipe; s2, a base layer is poured on the cement layer, a mounting cavity is formed in the top of the base layer, a plurality of drainage tanks are placed in the mounting cavity, the drainage tanks are provided with water guide grooves, and the water guide grooves communicate with the branch pipes; s3, an anti-cracking layer is poured on the base layer; s4, an asphalt layer is poured on the anti-cracking layer; and S5, curbs are arranged on the two sides of the asphalt layer in the width direction of the road. The installation cavity is formed in the base layer, the drainage tank is embedded in the installation cavity and communicated with the drainage pipe, water inf</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118273178A
source esp@cenet
subjects CESSPOOLS
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE
FIXED CONSTRUCTIONS
MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
SEWERAGE
SEWERS
WATER SUPPLY
title Roadbed reconstruction mode based on existing road
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-01T09%3A18%3A34IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=MAO%20LINGHUI&rft.date=2024-07-02&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118273178A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true