Protective wall of manual hole digging pile and construction method of protective wall of manual hole digging pile

The invention provides a retaining wall of a manual hole digging pile and a construction method of the retaining wall of the manual hole digging pile, and relates to the technical field of manual hole digging pile construction.The retaining wall of the manual hole digging pile is characterized in th...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LEI MENG, LIU WENBIN, SONG WEICHAO, MA JIAN, SHI XIAOBO, DONG ANXIN, WANG WENLONG, YIN LIJIE, DENG JIANGANG, YAO JIANSHI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LEI MENG
LIU WENBIN
SONG WEICHAO
MA JIAN
SHI XIAOBO
DONG ANXIN
WANG WENLONG
YIN LIJIE
DENG JIANGANG
YAO JIANSHI
description The invention provides a retaining wall of a manual hole digging pile and a construction method of the retaining wall of the manual hole digging pile, and relates to the technical field of manual hole digging pile construction.The retaining wall of the manual hole digging pile is characterized in that in the process that the retaining wall is installed in a pile hole, a fore shaft ring (10) is arranged at the top of the pile hole, and the outer diameter of a standard knot (20) can be matched with the inner diameter of the fore shaft ring (10); in the pile hole excavation process, each standard knot (20) is installed by being arranged in the locking ring (10) in a sleeved mode, the previous standard knot (20) is automatically connected with the next standard knot (20) in a clamped mode under the action of vertical force, the standard knots (20) integrally move downwards under the action of the vertical force, the lowermost standard knot (20) is made to make contact with the hole bottom of the pile hole all the
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118257258A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118257258A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118257258A3</originalsourceid><addsrcrecordid>eNrjZCgKKMovSU0uySxLVShPzMlRyE9TyE3MK03MUcjIz0lVSMlMT8_MS1coyARyEvNSFJLz84pLikqBOvLzFHJTSzLyU0B6Cog3hoeBNS0xpziVF0pzMyi6uYY4e-imFuTHpxYXJCan5qWWxDv7GRpaGJmaG5laOBoTowYA5OdEAQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Protective wall of manual hole digging pile and construction method of protective wall of manual hole digging pile</title><source>esp@cenet</source><creator>LEI MENG ; LIU WENBIN ; SONG WEICHAO ; MA JIAN ; SHI XIAOBO ; DONG ANXIN ; WANG WENLONG ; YIN LIJIE ; DENG JIANGANG ; YAO JIANSHI</creator><creatorcontrib>LEI MENG ; LIU WENBIN ; SONG WEICHAO ; MA JIAN ; SHI XIAOBO ; DONG ANXIN ; WANG WENLONG ; YIN LIJIE ; DENG JIANGANG ; YAO JIANSHI</creatorcontrib><description>The invention provides a retaining wall of a manual hole digging pile and a construction method of the retaining wall of the manual hole digging pile, and relates to the technical field of manual hole digging pile construction.The retaining wall of the manual hole digging pile is characterized in that in the process that the retaining wall is installed in a pile hole, a fore shaft ring (10) is arranged at the top of the pile hole, and the outer diameter of a standard knot (20) can be matched with the inner diameter of the fore shaft ring (10); in the pile hole excavation process, each standard knot (20) is installed by being arranged in the locking ring (10) in a sleeved mode, the previous standard knot (20) is automatically connected with the next standard knot (20) in a clamped mode under the action of vertical force, the standard knots (20) integrally move downwards under the action of the vertical force, the lowermost standard knot (20) is made to make contact with the hole bottom of the pile hole all the</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240628&amp;DB=EPODOC&amp;CC=CN&amp;NR=118257258A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240628&amp;DB=EPODOC&amp;CC=CN&amp;NR=118257258A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LEI MENG</creatorcontrib><creatorcontrib>LIU WENBIN</creatorcontrib><creatorcontrib>SONG WEICHAO</creatorcontrib><creatorcontrib>MA JIAN</creatorcontrib><creatorcontrib>SHI XIAOBO</creatorcontrib><creatorcontrib>DONG ANXIN</creatorcontrib><creatorcontrib>WANG WENLONG</creatorcontrib><creatorcontrib>YIN LIJIE</creatorcontrib><creatorcontrib>DENG JIANGANG</creatorcontrib><creatorcontrib>YAO JIANSHI</creatorcontrib><title>Protective wall of manual hole digging pile and construction method of protective wall of manual hole digging pile</title><description>The invention provides a retaining wall of a manual hole digging pile and a construction method of the retaining wall of the manual hole digging pile, and relates to the technical field of manual hole digging pile construction.The retaining wall of the manual hole digging pile is characterized in that in the process that the retaining wall is installed in a pile hole, a fore shaft ring (10) is arranged at the top of the pile hole, and the outer diameter of a standard knot (20) can be matched with the inner diameter of the fore shaft ring (10); in the pile hole excavation process, each standard knot (20) is installed by being arranged in the locking ring (10) in a sleeved mode, the previous standard knot (20) is automatically connected with the next standard knot (20) in a clamped mode under the action of vertical force, the standard knots (20) integrally move downwards under the action of the vertical force, the lowermost standard knot (20) is made to make contact with the hole bottom of the pile hole all the</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZCgKKMovSU0uySxLVShPzMlRyE9TyE3MK03MUcjIz0lVSMlMT8_MS1coyARyEvNSFJLz84pLikqBOvLzFHJTSzLyU0B6Cog3hoeBNS0xpziVF0pzMyi6uYY4e-imFuTHpxYXJCan5qWWxDv7GRpaGJmaG5laOBoTowYA5OdEAQ</recordid><startdate>20240628</startdate><enddate>20240628</enddate><creator>LEI MENG</creator><creator>LIU WENBIN</creator><creator>SONG WEICHAO</creator><creator>MA JIAN</creator><creator>SHI XIAOBO</creator><creator>DONG ANXIN</creator><creator>WANG WENLONG</creator><creator>YIN LIJIE</creator><creator>DENG JIANGANG</creator><creator>YAO JIANSHI</creator><scope>EVB</scope></search><sort><creationdate>20240628</creationdate><title>Protective wall of manual hole digging pile and construction method of protective wall of manual hole digging pile</title><author>LEI MENG ; LIU WENBIN ; SONG WEICHAO ; MA JIAN ; SHI XIAOBO ; DONG ANXIN ; WANG WENLONG ; YIN LIJIE ; DENG JIANGANG ; YAO JIANSHI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118257258A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>LEI MENG</creatorcontrib><creatorcontrib>LIU WENBIN</creatorcontrib><creatorcontrib>SONG WEICHAO</creatorcontrib><creatorcontrib>MA JIAN</creatorcontrib><creatorcontrib>SHI XIAOBO</creatorcontrib><creatorcontrib>DONG ANXIN</creatorcontrib><creatorcontrib>WANG WENLONG</creatorcontrib><creatorcontrib>YIN LIJIE</creatorcontrib><creatorcontrib>DENG JIANGANG</creatorcontrib><creatorcontrib>YAO JIANSHI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LEI MENG</au><au>LIU WENBIN</au><au>SONG WEICHAO</au><au>MA JIAN</au><au>SHI XIAOBO</au><au>DONG ANXIN</au><au>WANG WENLONG</au><au>YIN LIJIE</au><au>DENG JIANGANG</au><au>YAO JIANSHI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Protective wall of manual hole digging pile and construction method of protective wall of manual hole digging pile</title><date>2024-06-28</date><risdate>2024</risdate><abstract>The invention provides a retaining wall of a manual hole digging pile and a construction method of the retaining wall of the manual hole digging pile, and relates to the technical field of manual hole digging pile construction.The retaining wall of the manual hole digging pile is characterized in that in the process that the retaining wall is installed in a pile hole, a fore shaft ring (10) is arranged at the top of the pile hole, and the outer diameter of a standard knot (20) can be matched with the inner diameter of the fore shaft ring (10); in the pile hole excavation process, each standard knot (20) is installed by being arranged in the locking ring (10) in a sleeved mode, the previous standard knot (20) is automatically connected with the next standard knot (20) in a clamped mode under the action of vertical force, the standard knots (20) integrally move downwards under the action of the vertical force, the lowermost standard knot (20) is made to make contact with the hole bottom of the pile hole all the</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118257258A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Protective wall of manual hole digging pile and construction method of protective wall of manual hole digging pile
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-11T23%3A20%3A07IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LEI%20MENG&rft.date=2024-06-28&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118257258A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true