Rapidly paved double-layer composite pavement slab and use method thereof

The invention relates to a quick-paving double-layer composite pavement slab and a use method thereof, and the quick-paving double-layer composite pavement slab comprises a lower layer slab, an upper layer slab, a positioning plate, a positioning pin and a fixing pin. The use method comprises the fo...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LIANG ZHIXIN, WAN PENG, YANG JIANFU, ZHOU GUANGZHONG, ZOU CHUNHUA, WU LIPING, DUO JUNTAI, ZHANG ZHAOXIANG, CHEN QIFA, LEI SHENGXIANG, DING ZHENGQUAN, LUO JIULIN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LIANG ZHIXIN
WAN PENG
YANG JIANFU
ZHOU GUANGZHONG
ZOU CHUNHUA
WU LIPING
DUO JUNTAI
ZHANG ZHAOXIANG
CHEN QIFA
LEI SHENGXIANG
DING ZHENGQUAN
LUO JIULIN
description The invention relates to a quick-paving double-layer composite pavement slab and a use method thereof, and the quick-paving double-layer composite pavement slab comprises a lower layer slab, an upper layer slab, a positioning plate, a positioning pin and a fixing pin. The use method comprises the following steps of: connecting the positioning plate and every three adjacent lower-layer plates together by using the positioning pins; the lower layer plate is laid; positioning plates and positioning pins at the middle positions of the laid lower-layer plates are removed firstly, all the upper-layer plates need to be evenly distributed on the three lower-layer plates, namely staggered joint lap joint is achieved, and fixing pins are inserted into embedded sleeves, aligned with the lower-layer plates, of the upper-layer plates; the positioning plate and the positioning pin which interfere with the second upper-layer plate continue to be removed, and the second upper-layer plate is laid; and according to the method,
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118257174A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118257174A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118257174A3</originalsourceid><addsrcrecordid>eNrjZPAMSizITMmpVChILEtNUUjJL03KSdXNSaxMLVJIzs8tyC_OLEkFS-am5pUoFOckJikk5qUolBanKuSmlmTkpyiUZKQWpean8TCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeGc_Q0MLI1NzQ3MTR2Ni1AAA7ks0xQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Rapidly paved double-layer composite pavement slab and use method thereof</title><source>esp@cenet</source><creator>LIANG ZHIXIN ; WAN PENG ; YANG JIANFU ; ZHOU GUANGZHONG ; ZOU CHUNHUA ; WU LIPING ; DUO JUNTAI ; ZHANG ZHAOXIANG ; CHEN QIFA ; LEI SHENGXIANG ; DING ZHENGQUAN ; LUO JIULIN</creator><creatorcontrib>LIANG ZHIXIN ; WAN PENG ; YANG JIANFU ; ZHOU GUANGZHONG ; ZOU CHUNHUA ; WU LIPING ; DUO JUNTAI ; ZHANG ZHAOXIANG ; CHEN QIFA ; LEI SHENGXIANG ; DING ZHENGQUAN ; LUO JIULIN</creatorcontrib><description>The invention relates to a quick-paving double-layer composite pavement slab and a use method thereof, and the quick-paving double-layer composite pavement slab comprises a lower layer slab, an upper layer slab, a positioning plate, a positioning pin and a fixing pin. The use method comprises the following steps of: connecting the positioning plate and every three adjacent lower-layer plates together by using the positioning pins; the lower layer plate is laid; positioning plates and positioning pins at the middle positions of the laid lower-layer plates are removed firstly, all the upper-layer plates need to be evenly distributed on the three lower-layer plates, namely staggered joint lap joint is achieved, and fixing pins are inserted into embedded sleeves, aligned with the lower-layer plates, of the upper-layer plates; the positioning plate and the positioning pin which interfere with the second upper-layer plate continue to be removed, and the second upper-layer plate is laid; and according to the method,</description><language>chi ; eng</language><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE ; FIXED CONSTRUCTIONS ; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240628&amp;DB=EPODOC&amp;CC=CN&amp;NR=118257174A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240628&amp;DB=EPODOC&amp;CC=CN&amp;NR=118257174A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LIANG ZHIXIN</creatorcontrib><creatorcontrib>WAN PENG</creatorcontrib><creatorcontrib>YANG JIANFU</creatorcontrib><creatorcontrib>ZHOU GUANGZHONG</creatorcontrib><creatorcontrib>ZOU CHUNHUA</creatorcontrib><creatorcontrib>WU LIPING</creatorcontrib><creatorcontrib>DUO JUNTAI</creatorcontrib><creatorcontrib>ZHANG ZHAOXIANG</creatorcontrib><creatorcontrib>CHEN QIFA</creatorcontrib><creatorcontrib>LEI SHENGXIANG</creatorcontrib><creatorcontrib>DING ZHENGQUAN</creatorcontrib><creatorcontrib>LUO JIULIN</creatorcontrib><title>Rapidly paved double-layer composite pavement slab and use method thereof</title><description>The invention relates to a quick-paving double-layer composite pavement slab and a use method thereof, and the quick-paving double-layer composite pavement slab comprises a lower layer slab, an upper layer slab, a positioning plate, a positioning pin and a fixing pin. The use method comprises the following steps of: connecting the positioning plate and every three adjacent lower-layer plates together by using the positioning pins; the lower layer plate is laid; positioning plates and positioning pins at the middle positions of the laid lower-layer plates are removed firstly, all the upper-layer plates need to be evenly distributed on the three lower-layer plates, namely staggered joint lap joint is achieved, and fixing pins are inserted into embedded sleeves, aligned with the lower-layer plates, of the upper-layer plates; the positioning plate and the positioning pin which interfere with the second upper-layer plate continue to be removed, and the second upper-layer plate is laid; and according to the method,</description><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPAMSizITMmpVChILEtNUUjJL03KSdXNSaxMLVJIzs8tyC_OLEkFS-am5pUoFOckJikk5qUolBanKuSmlmTkpyiUZKQWpean8TCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeGc_Q0MLI1NzQ3MTR2Ni1AAA7ks0xQ</recordid><startdate>20240628</startdate><enddate>20240628</enddate><creator>LIANG ZHIXIN</creator><creator>WAN PENG</creator><creator>YANG JIANFU</creator><creator>ZHOU GUANGZHONG</creator><creator>ZOU CHUNHUA</creator><creator>WU LIPING</creator><creator>DUO JUNTAI</creator><creator>ZHANG ZHAOXIANG</creator><creator>CHEN QIFA</creator><creator>LEI SHENGXIANG</creator><creator>DING ZHENGQUAN</creator><creator>LUO JIULIN</creator><scope>EVB</scope></search><sort><creationdate>20240628</creationdate><title>Rapidly paved double-layer composite pavement slab and use method thereof</title><author>LIANG ZHIXIN ; WAN PENG ; YANG JIANFU ; ZHOU GUANGZHONG ; ZOU CHUNHUA ; WU LIPING ; DUO JUNTAI ; ZHANG ZHAOXIANG ; CHEN QIFA ; LEI SHENGXIANG ; DING ZHENGQUAN ; LUO JIULIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118257174A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</topic><toplevel>online_resources</toplevel><creatorcontrib>LIANG ZHIXIN</creatorcontrib><creatorcontrib>WAN PENG</creatorcontrib><creatorcontrib>YANG JIANFU</creatorcontrib><creatorcontrib>ZHOU GUANGZHONG</creatorcontrib><creatorcontrib>ZOU CHUNHUA</creatorcontrib><creatorcontrib>WU LIPING</creatorcontrib><creatorcontrib>DUO JUNTAI</creatorcontrib><creatorcontrib>ZHANG ZHAOXIANG</creatorcontrib><creatorcontrib>CHEN QIFA</creatorcontrib><creatorcontrib>LEI SHENGXIANG</creatorcontrib><creatorcontrib>DING ZHENGQUAN</creatorcontrib><creatorcontrib>LUO JIULIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LIANG ZHIXIN</au><au>WAN PENG</au><au>YANG JIANFU</au><au>ZHOU GUANGZHONG</au><au>ZOU CHUNHUA</au><au>WU LIPING</au><au>DUO JUNTAI</au><au>ZHANG ZHAOXIANG</au><au>CHEN QIFA</au><au>LEI SHENGXIANG</au><au>DING ZHENGQUAN</au><au>LUO JIULIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Rapidly paved double-layer composite pavement slab and use method thereof</title><date>2024-06-28</date><risdate>2024</risdate><abstract>The invention relates to a quick-paving double-layer composite pavement slab and a use method thereof, and the quick-paving double-layer composite pavement slab comprises a lower layer slab, an upper layer slab, a positioning plate, a positioning pin and a fixing pin. The use method comprises the following steps of: connecting the positioning plate and every three adjacent lower-layer plates together by using the positioning pins; the lower layer plate is laid; positioning plates and positioning pins at the middle positions of the laid lower-layer plates are removed firstly, all the upper-layer plates need to be evenly distributed on the three lower-layer plates, namely staggered joint lap joint is achieved, and fixing pins are inserted into embedded sleeves, aligned with the lower-layer plates, of the upper-layer plates; the positioning plate and the positioning pin which interfere with the second upper-layer plate continue to be removed, and the second upper-layer plate is laid; and according to the method,</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118257174A
source esp@cenet
subjects CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE
FIXED CONSTRUCTIONS
MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
title Rapidly paved double-layer composite pavement slab and use method thereof
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-31T17%3A29%3A01IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LIANG%20ZHIXIN&rft.date=2024-06-28&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118257174A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true