Gantry crane girder hoisting construction method

The invention discloses a hoisting construction method for a main beam of a portal crane. The hoisting construction method comprises a hoisting construction process of hoisting the main beam on the basis of constructing a main beam hoisting system of the portal crane. On the basis of a main beam hoi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHEN XIAOMING, LUO KAI, HAN YI, WANG HELU, YU TAO, GUAN CHAO, LIU ZHAO, XUE RIQUAN, LIAO TIANZHU, WANG WENGUO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator CHEN XIAOMING
LUO KAI
HAN YI
WANG HELU
YU TAO
GUAN CHAO
LIU ZHAO
XUE RIQUAN
LIAO TIANZHU
WANG WENGUO
description The invention discloses a hoisting construction method for a main beam of a portal crane. The hoisting construction method comprises a hoisting construction process of hoisting the main beam on the basis of constructing a main beam hoisting system of the portal crane. On the basis of a main beam hoisting system of the portal crane, when a main beam is hoisted and lifted, a wind cable A, a wind cable B, a wind cable C and a wind cable D converge and intersect on ground anchors on the two sides and the middle of a track; the main beam of the portal crane is not prone to making contact with the wind cable A, the wind cable B, the wind cable C and the wind cable D to cause interference, and the problem that due to the fact that the lifting frame is located on the inner side of the supporting leg, the main beam of the portal crane can make contact with and collide with the lifting frame in the lifting process, and the lifting efficiency is affected is solved. 本发明公开了一种门式起重机主梁吊装施工方法,包括:以构建出门式起重机主梁吊装体系为基础将主梁起吊的吊装施工过程
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118255267A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118255267A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118255267A3</originalsourceid><addsrcrecordid>eNrjZDBwT8wrKapUSC5KzEtVSM8sSkktUsjIzywuycxLV0jOzysuKSpNLsnMz1PITS3JyE_hYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhhZGpqZGZuaOxsSoAQCQdyvN</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Gantry crane girder hoisting construction method</title><source>esp@cenet</source><creator>CHEN XIAOMING ; LUO KAI ; HAN YI ; WANG HELU ; YU TAO ; GUAN CHAO ; LIU ZHAO ; XUE RIQUAN ; LIAO TIANZHU ; WANG WENGUO</creator><creatorcontrib>CHEN XIAOMING ; LUO KAI ; HAN YI ; WANG HELU ; YU TAO ; GUAN CHAO ; LIU ZHAO ; XUE RIQUAN ; LIAO TIANZHU ; WANG WENGUO</creatorcontrib><description>The invention discloses a hoisting construction method for a main beam of a portal crane. The hoisting construction method comprises a hoisting construction process of hoisting the main beam on the basis of constructing a main beam hoisting system of the portal crane. On the basis of a main beam hoisting system of the portal crane, when a main beam is hoisted and lifted, a wind cable A, a wind cable B, a wind cable C and a wind cable D converge and intersect on ground anchors on the two sides and the middle of a track; the main beam of the portal crane is not prone to making contact with the wind cable A, the wind cable B, the wind cable C and the wind cable D to cause interference, and the problem that due to the fact that the lifting frame is located on the inner side of the supporting leg, the main beam of the portal crane can make contact with and collide with the lifting frame in the lifting process, and the lifting efficiency is affected is solved. 本发明公开了一种门式起重机主梁吊装施工方法,包括:以构建出门式起重机主梁吊装体系为基础将主梁起吊的吊装施工过程</description><language>chi ; eng</language><subject>CRANES ; HAULING ; HOISTING ; LIFTING ; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES ; PERFORMING OPERATIONS ; TRANSPORTING</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240628&amp;DB=EPODOC&amp;CC=CN&amp;NR=118255267A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240628&amp;DB=EPODOC&amp;CC=CN&amp;NR=118255267A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CHEN XIAOMING</creatorcontrib><creatorcontrib>LUO KAI</creatorcontrib><creatorcontrib>HAN YI</creatorcontrib><creatorcontrib>WANG HELU</creatorcontrib><creatorcontrib>YU TAO</creatorcontrib><creatorcontrib>GUAN CHAO</creatorcontrib><creatorcontrib>LIU ZHAO</creatorcontrib><creatorcontrib>XUE RIQUAN</creatorcontrib><creatorcontrib>LIAO TIANZHU</creatorcontrib><creatorcontrib>WANG WENGUO</creatorcontrib><title>Gantry crane girder hoisting construction method</title><description>The invention discloses a hoisting construction method for a main beam of a portal crane. The hoisting construction method comprises a hoisting construction process of hoisting the main beam on the basis of constructing a main beam hoisting system of the portal crane. On the basis of a main beam hoisting system of the portal crane, when a main beam is hoisted and lifted, a wind cable A, a wind cable B, a wind cable C and a wind cable D converge and intersect on ground anchors on the two sides and the middle of a track; the main beam of the portal crane is not prone to making contact with the wind cable A, the wind cable B, the wind cable C and the wind cable D to cause interference, and the problem that due to the fact that the lifting frame is located on the inner side of the supporting leg, the main beam of the portal crane can make contact with and collide with the lifting frame in the lifting process, and the lifting efficiency is affected is solved. 本发明公开了一种门式起重机主梁吊装施工方法,包括:以构建出门式起重机主梁吊装体系为基础将主梁起吊的吊装施工过程</description><subject>CRANES</subject><subject>HAULING</subject><subject>HOISTING</subject><subject>LIFTING</subject><subject>LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES</subject><subject>PERFORMING OPERATIONS</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDBwT8wrKapUSC5KzEtVSM8sSkktUsjIzywuycxLV0jOzysuKSpNLsnMz1PITS3JyE_hYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhhZGpqZGZuaOxsSoAQCQdyvN</recordid><startdate>20240628</startdate><enddate>20240628</enddate><creator>CHEN XIAOMING</creator><creator>LUO KAI</creator><creator>HAN YI</creator><creator>WANG HELU</creator><creator>YU TAO</creator><creator>GUAN CHAO</creator><creator>LIU ZHAO</creator><creator>XUE RIQUAN</creator><creator>LIAO TIANZHU</creator><creator>WANG WENGUO</creator><scope>EVB</scope></search><sort><creationdate>20240628</creationdate><title>Gantry crane girder hoisting construction method</title><author>CHEN XIAOMING ; LUO KAI ; HAN YI ; WANG HELU ; YU TAO ; GUAN CHAO ; LIU ZHAO ; XUE RIQUAN ; LIAO TIANZHU ; WANG WENGUO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118255267A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>CRANES</topic><topic>HAULING</topic><topic>HOISTING</topic><topic>LIFTING</topic><topic>LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES</topic><topic>PERFORMING OPERATIONS</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>CHEN XIAOMING</creatorcontrib><creatorcontrib>LUO KAI</creatorcontrib><creatorcontrib>HAN YI</creatorcontrib><creatorcontrib>WANG HELU</creatorcontrib><creatorcontrib>YU TAO</creatorcontrib><creatorcontrib>GUAN CHAO</creatorcontrib><creatorcontrib>LIU ZHAO</creatorcontrib><creatorcontrib>XUE RIQUAN</creatorcontrib><creatorcontrib>LIAO TIANZHU</creatorcontrib><creatorcontrib>WANG WENGUO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CHEN XIAOMING</au><au>LUO KAI</au><au>HAN YI</au><au>WANG HELU</au><au>YU TAO</au><au>GUAN CHAO</au><au>LIU ZHAO</au><au>XUE RIQUAN</au><au>LIAO TIANZHU</au><au>WANG WENGUO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Gantry crane girder hoisting construction method</title><date>2024-06-28</date><risdate>2024</risdate><abstract>The invention discloses a hoisting construction method for a main beam of a portal crane. The hoisting construction method comprises a hoisting construction process of hoisting the main beam on the basis of constructing a main beam hoisting system of the portal crane. On the basis of a main beam hoisting system of the portal crane, when a main beam is hoisted and lifted, a wind cable A, a wind cable B, a wind cable C and a wind cable D converge and intersect on ground anchors on the two sides and the middle of a track; the main beam of the portal crane is not prone to making contact with the wind cable A, the wind cable B, the wind cable C and the wind cable D to cause interference, and the problem that due to the fact that the lifting frame is located on the inner side of the supporting leg, the main beam of the portal crane can make contact with and collide with the lifting frame in the lifting process, and the lifting efficiency is affected is solved. 本发明公开了一种门式起重机主梁吊装施工方法,包括:以构建出门式起重机主梁吊装体系为基础将主梁起吊的吊装施工过程</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118255267A
source esp@cenet
subjects CRANES
HAULING
HOISTING
LIFTING
LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES
PERFORMING OPERATIONS
TRANSPORTING
title Gantry crane girder hoisting construction method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-24T03%3A56%3A25IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CHEN%20XIAOMING&rft.date=2024-06-28&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118255267A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true