Construction management method, system and equipment for project supervision and storage medium

The invention relates to a construction management method, system and equipment for project supervision and a storage medium, and the method comprises the steps: obtaining a building construction drawing and a corresponding construction period plan, carrying out the construction step analysis of the...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LI MINGQUAN, MOON JI-WOON, CHEN SHAOWEI, LIANG JIAXIN, LI XUPENG, HUANG GUOCHAO, LIN ENBO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LI MINGQUAN
MOON JI-WOON
CHEN SHAOWEI
LIANG JIAXIN
LI XUPENG
HUANG GUOCHAO
LIN ENBO
description The invention relates to a construction management method, system and equipment for project supervision and a storage medium, and the method comprises the steps: obtaining a building construction drawing and a corresponding construction period plan, carrying out the construction step analysis of the building construction drawing, constructing a construction supervision model of a current building according to the construction steps and the corresponding construction period plan, and carrying out the construction management of the current building. And obtaining the actual construction progress of the construction project and the corresponding construction acceptance standard, inputting the actual construction progress and the corresponding construction acceptance standard into the construction supervision model for construction process recheck processing, and performing risk investigation on each step of the current construction process according to the process recheck result in combination with the expected
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118229122A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118229122A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118229122A3</originalsourceid><addsrcrecordid>eNqNjDEOAiEQRbexMOodxl4LsNHSEI2VlT0hMKsYYZAZTLy9u8YDWP3iv_emnTWUWWrzEilDctldMWEWSCg3CivgNwsmcDkAPlss37OnCqXSHb0At4L1FXn0R4qF6hAZAiG2NO8mvXswLn4765bHw8Wc1ljIIhfnMaNYc1Zqq_VOab3f_MN8AAIZPdE</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction management method, system and equipment for project supervision and storage medium</title><source>esp@cenet</source><creator>LI MINGQUAN ; MOON JI-WOON ; CHEN SHAOWEI ; LIANG JIAXIN ; LI XUPENG ; HUANG GUOCHAO ; LIN ENBO</creator><creatorcontrib>LI MINGQUAN ; MOON JI-WOON ; CHEN SHAOWEI ; LIANG JIAXIN ; LI XUPENG ; HUANG GUOCHAO ; LIN ENBO</creatorcontrib><description>The invention relates to a construction management method, system and equipment for project supervision and a storage medium, and the method comprises the steps: obtaining a building construction drawing and a corresponding construction period plan, carrying out the construction step analysis of the building construction drawing, constructing a construction supervision model of a current building according to the construction steps and the corresponding construction period plan, and carrying out the construction management of the current building. And obtaining the actual construction progress of the construction project and the corresponding construction acceptance standard, inputting the actual construction progress and the corresponding construction acceptance standard into the construction supervision model for construction process recheck processing, and performing risk investigation on each step of the current construction process according to the process recheck result in combination with the expected</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240621&amp;DB=EPODOC&amp;CC=CN&amp;NR=118229122A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240621&amp;DB=EPODOC&amp;CC=CN&amp;NR=118229122A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LI MINGQUAN</creatorcontrib><creatorcontrib>MOON JI-WOON</creatorcontrib><creatorcontrib>CHEN SHAOWEI</creatorcontrib><creatorcontrib>LIANG JIAXIN</creatorcontrib><creatorcontrib>LI XUPENG</creatorcontrib><creatorcontrib>HUANG GUOCHAO</creatorcontrib><creatorcontrib>LIN ENBO</creatorcontrib><title>Construction management method, system and equipment for project supervision and storage medium</title><description>The invention relates to a construction management method, system and equipment for project supervision and a storage medium, and the method comprises the steps: obtaining a building construction drawing and a corresponding construction period plan, carrying out the construction step analysis of the building construction drawing, constructing a construction supervision model of a current building according to the construction steps and the corresponding construction period plan, and carrying out the construction management of the current building. And obtaining the actual construction progress of the construction project and the corresponding construction acceptance standard, inputting the actual construction progress and the corresponding construction acceptance standard into the construction supervision model for construction process recheck processing, and performing risk investigation on each step of the current construction process according to the process recheck result in combination with the expected</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjDEOAiEQRbexMOodxl4LsNHSEI2VlT0hMKsYYZAZTLy9u8YDWP3iv_emnTWUWWrzEilDctldMWEWSCg3CivgNwsmcDkAPlss37OnCqXSHb0At4L1FXn0R4qF6hAZAiG2NO8mvXswLn4765bHw8Wc1ljIIhfnMaNYc1Zqq_VOab3f_MN8AAIZPdE</recordid><startdate>20240621</startdate><enddate>20240621</enddate><creator>LI MINGQUAN</creator><creator>MOON JI-WOON</creator><creator>CHEN SHAOWEI</creator><creator>LIANG JIAXIN</creator><creator>LI XUPENG</creator><creator>HUANG GUOCHAO</creator><creator>LIN ENBO</creator><scope>EVB</scope></search><sort><creationdate>20240621</creationdate><title>Construction management method, system and equipment for project supervision and storage medium</title><author>LI MINGQUAN ; MOON JI-WOON ; CHEN SHAOWEI ; LIANG JIAXIN ; LI XUPENG ; HUANG GUOCHAO ; LIN ENBO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118229122A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>LI MINGQUAN</creatorcontrib><creatorcontrib>MOON JI-WOON</creatorcontrib><creatorcontrib>CHEN SHAOWEI</creatorcontrib><creatorcontrib>LIANG JIAXIN</creatorcontrib><creatorcontrib>LI XUPENG</creatorcontrib><creatorcontrib>HUANG GUOCHAO</creatorcontrib><creatorcontrib>LIN ENBO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LI MINGQUAN</au><au>MOON JI-WOON</au><au>CHEN SHAOWEI</au><au>LIANG JIAXIN</au><au>LI XUPENG</au><au>HUANG GUOCHAO</au><au>LIN ENBO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction management method, system and equipment for project supervision and storage medium</title><date>2024-06-21</date><risdate>2024</risdate><abstract>The invention relates to a construction management method, system and equipment for project supervision and a storage medium, and the method comprises the steps: obtaining a building construction drawing and a corresponding construction period plan, carrying out the construction step analysis of the building construction drawing, constructing a construction supervision model of a current building according to the construction steps and the corresponding construction period plan, and carrying out the construction management of the current building. And obtaining the actual construction progress of the construction project and the corresponding construction acceptance standard, inputting the actual construction progress and the corresponding construction acceptance standard into the construction supervision model for construction process recheck processing, and performing risk investigation on each step of the current construction process according to the process recheck result in combination with the expected</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118229122A
source esp@cenet
subjects CALCULATING
COMPUTING
COUNTING
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES
PHYSICS
SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR
title Construction management method, system and equipment for project supervision and storage medium
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-25T22%3A16%3A45IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LI%20MINGQUAN&rft.date=2024-06-21&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118229122A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true