Ballast track base disease treatment construction method

The invention provides a ballast track base disease treatment construction method. The method comprises the steps that construction preparation is made; the feet-lock anchor pipe is constructed; driving a row of locking anchor pipes, firstly utilizing the skylight, constructing the locking anchor pi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHAO PENG, FU BINGXIAN, NIU YABIN, SHI YUEFENG, MA CHAOFENG, YU SENG-HO, ZOU WENHAO, ZHANG TIAN, XUE HAO, LOU LIANGWEI, ZHENG XINGUO, LI YAO, WEI SHAOWEI, MA WEIBIN, LYU SONG, FENG TAOJIAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHAO PENG
FU BINGXIAN
NIU YABIN
SHI YUEFENG
MA CHAOFENG
YU SENG-HO
ZOU WENHAO
ZHANG TIAN
XUE HAO
LOU LIANGWEI
ZHENG XINGUO
LI YAO
WEI SHAOWEI
MA WEIBIN
LYU SONG
FENG TAOJIAN
description The invention provides a ballast track base disease treatment construction method. The method comprises the steps that construction preparation is made; the feet-lock anchor pipe is constructed; driving a row of locking anchor pipes, firstly utilizing the skylight, constructing the locking anchor pipe on the right side of the disease section, then utilizing the skylight, and completing the rest of the locking anchor pipes; rail breaking construction is conducted, and the upward steel rail is sawed through a skylight; carrying out cable and drainage relocation and construction, and carrying out temporary buttress driving construction; carrying out sleeper displacement, railway ballast cleaning and steel sleeper beam erection construction; dismantling the base plate and restoring construction; then steel template beam dismantling and track resetting construction are carried out, and seamless welding and fine adjustment are carried out on the steel rails; and recovering the ditch bottom cable trough. 本发明提出了一种有砟轨
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118207762A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118207762A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118207762A3</originalsourceid><addsrcrecordid>eNrjZLBwSszJSSwuUSgpSkzOVkhKLE5VSMksTgXRJUWpiSW5qXklCsn5ecUlRaXJJZn5eQq5qSUZ-Sk8DKxpiTnFqbxQmptB0c01xNlDN7UgPz61uCAxOTUvtSTe2c_Q0MLIwNzczMjRmBg1ACzoLrQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Ballast track base disease treatment construction method</title><source>esp@cenet</source><creator>ZHAO PENG ; FU BINGXIAN ; NIU YABIN ; SHI YUEFENG ; MA CHAOFENG ; YU SENG-HO ; ZOU WENHAO ; ZHANG TIAN ; XUE HAO ; LOU LIANGWEI ; ZHENG XINGUO ; LI YAO ; WEI SHAOWEI ; MA WEIBIN ; LYU SONG ; FENG TAOJIAN</creator><creatorcontrib>ZHAO PENG ; FU BINGXIAN ; NIU YABIN ; SHI YUEFENG ; MA CHAOFENG ; YU SENG-HO ; ZOU WENHAO ; ZHANG TIAN ; XUE HAO ; LOU LIANGWEI ; ZHENG XINGUO ; LI YAO ; WEI SHAOWEI ; MA WEIBIN ; LYU SONG ; FENG TAOJIAN</creatorcontrib><description>The invention provides a ballast track base disease treatment construction method. The method comprises the steps that construction preparation is made; the feet-lock anchor pipe is constructed; driving a row of locking anchor pipes, firstly utilizing the skylight, constructing the locking anchor pipe on the right side of the disease section, then utilizing the skylight, and completing the rest of the locking anchor pipes; rail breaking construction is conducted, and the upward steel rail is sawed through a skylight; carrying out cable and drainage relocation and construction, and carrying out temporary buttress driving construction; carrying out sleeper displacement, railway ballast cleaning and steel sleeper beam erection construction; dismantling the base plate and restoring construction; then steel template beam dismantling and track resetting construction are carried out, and seamless welding and fine adjustment are carried out on the steel rails; and recovering the ditch bottom cable trough. 本发明提出了一种有砟轨</description><language>chi ; eng</language><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MACHINES FOR MAKING RAILWAYS OF ALL KINDS ; MINING ; PERMANENT WAY ; PERMANENT-WAY TOOLS ; SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS ; SHAFTS ; TUNNELS</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240618&amp;DB=EPODOC&amp;CC=CN&amp;NR=118207762A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240618&amp;DB=EPODOC&amp;CC=CN&amp;NR=118207762A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHAO PENG</creatorcontrib><creatorcontrib>FU BINGXIAN</creatorcontrib><creatorcontrib>NIU YABIN</creatorcontrib><creatorcontrib>SHI YUEFENG</creatorcontrib><creatorcontrib>MA CHAOFENG</creatorcontrib><creatorcontrib>YU SENG-HO</creatorcontrib><creatorcontrib>ZOU WENHAO</creatorcontrib><creatorcontrib>ZHANG TIAN</creatorcontrib><creatorcontrib>XUE HAO</creatorcontrib><creatorcontrib>LOU LIANGWEI</creatorcontrib><creatorcontrib>ZHENG XINGUO</creatorcontrib><creatorcontrib>LI YAO</creatorcontrib><creatorcontrib>WEI SHAOWEI</creatorcontrib><creatorcontrib>MA WEIBIN</creatorcontrib><creatorcontrib>LYU SONG</creatorcontrib><creatorcontrib>FENG TAOJIAN</creatorcontrib><title>Ballast track base disease treatment construction method</title><description>The invention provides a ballast track base disease treatment construction method. The method comprises the steps that construction preparation is made; the feet-lock anchor pipe is constructed; driving a row of locking anchor pipes, firstly utilizing the skylight, constructing the locking anchor pipe on the right side of the disease section, then utilizing the skylight, and completing the rest of the locking anchor pipes; rail breaking construction is conducted, and the upward steel rail is sawed through a skylight; carrying out cable and drainage relocation and construction, and carrying out temporary buttress driving construction; carrying out sleeper displacement, railway ballast cleaning and steel sleeper beam erection construction; dismantling the base plate and restoring construction; then steel template beam dismantling and track resetting construction are carried out, and seamless welding and fine adjustment are carried out on the steel rails; and recovering the ditch bottom cable trough. 本发明提出了一种有砟轨</description><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MACHINES FOR MAKING RAILWAYS OF ALL KINDS</subject><subject>MINING</subject><subject>PERMANENT WAY</subject><subject>PERMANENT-WAY TOOLS</subject><subject>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLBwSszJSSwuUSgpSkzOVkhKLE5VSMksTgXRJUWpiSW5qXklCsn5ecUlRaXJJZn5eQq5qSUZ-Sk8DKxpiTnFqbxQmptB0c01xNlDN7UgPz61uCAxOTUvtSTe2c_Q0MLIwNzczMjRmBg1ACzoLrQ</recordid><startdate>20240618</startdate><enddate>20240618</enddate><creator>ZHAO PENG</creator><creator>FU BINGXIAN</creator><creator>NIU YABIN</creator><creator>SHI YUEFENG</creator><creator>MA CHAOFENG</creator><creator>YU SENG-HO</creator><creator>ZOU WENHAO</creator><creator>ZHANG TIAN</creator><creator>XUE HAO</creator><creator>LOU LIANGWEI</creator><creator>ZHENG XINGUO</creator><creator>LI YAO</creator><creator>WEI SHAOWEI</creator><creator>MA WEIBIN</creator><creator>LYU SONG</creator><creator>FENG TAOJIAN</creator><scope>EVB</scope></search><sort><creationdate>20240618</creationdate><title>Ballast track base disease treatment construction method</title><author>ZHAO PENG ; FU BINGXIAN ; NIU YABIN ; SHI YUEFENG ; MA CHAOFENG ; YU SENG-HO ; ZOU WENHAO ; ZHANG TIAN ; XUE HAO ; LOU LIANGWEI ; ZHENG XINGUO ; LI YAO ; WEI SHAOWEI ; MA WEIBIN ; LYU SONG ; FENG TAOJIAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118207762A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MACHINES FOR MAKING RAILWAYS OF ALL KINDS</topic><topic>MINING</topic><topic>PERMANENT WAY</topic><topic>PERMANENT-WAY TOOLS</topic><topic>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHAO PENG</creatorcontrib><creatorcontrib>FU BINGXIAN</creatorcontrib><creatorcontrib>NIU YABIN</creatorcontrib><creatorcontrib>SHI YUEFENG</creatorcontrib><creatorcontrib>MA CHAOFENG</creatorcontrib><creatorcontrib>YU SENG-HO</creatorcontrib><creatorcontrib>ZOU WENHAO</creatorcontrib><creatorcontrib>ZHANG TIAN</creatorcontrib><creatorcontrib>XUE HAO</creatorcontrib><creatorcontrib>LOU LIANGWEI</creatorcontrib><creatorcontrib>ZHENG XINGUO</creatorcontrib><creatorcontrib>LI YAO</creatorcontrib><creatorcontrib>WEI SHAOWEI</creatorcontrib><creatorcontrib>MA WEIBIN</creatorcontrib><creatorcontrib>LYU SONG</creatorcontrib><creatorcontrib>FENG TAOJIAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHAO PENG</au><au>FU BINGXIAN</au><au>NIU YABIN</au><au>SHI YUEFENG</au><au>MA CHAOFENG</au><au>YU SENG-HO</au><au>ZOU WENHAO</au><au>ZHANG TIAN</au><au>XUE HAO</au><au>LOU LIANGWEI</au><au>ZHENG XINGUO</au><au>LI YAO</au><au>WEI SHAOWEI</au><au>MA WEIBIN</au><au>LYU SONG</au><au>FENG TAOJIAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Ballast track base disease treatment construction method</title><date>2024-06-18</date><risdate>2024</risdate><abstract>The invention provides a ballast track base disease treatment construction method. The method comprises the steps that construction preparation is made; the feet-lock anchor pipe is constructed; driving a row of locking anchor pipes, firstly utilizing the skylight, constructing the locking anchor pipe on the right side of the disease section, then utilizing the skylight, and completing the rest of the locking anchor pipes; rail breaking construction is conducted, and the upward steel rail is sawed through a skylight; carrying out cable and drainage relocation and construction, and carrying out temporary buttress driving construction; carrying out sleeper displacement, railway ballast cleaning and steel sleeper beam erection construction; dismantling the base plate and restoring construction; then steel template beam dismantling and track resetting construction are carried out, and seamless welding and fine adjustment are carried out on the steel rails; and recovering the ditch bottom cable trough. 本发明提出了一种有砟轨</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118207762A
source esp@cenet
subjects CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MACHINES FOR MAKING RAILWAYS OF ALL KINDS
MINING
PERMANENT WAY
PERMANENT-WAY TOOLS
SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS
SHAFTS
TUNNELS
title Ballast track base disease treatment construction method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-12T14%3A57%3A22IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHAO%20PENG&rft.date=2024-06-18&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118207762A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true