Control method and system for safe backfilling of roadbed
The invention relates to the technical field of road construction safety, in particular to a roadbed safety backfill control method and system, and the method comprises the steps: obtaining the related parameter information of roadbed soil and underground water in real time based on a geological sen...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | WANG WEI BIE TIANKUI LIU LEI LI JIE LI YUAN WANG YU LU XIAOFANG XIE FEI YIN TONGTONG FANG BIN ZHAO YANG |
description | The invention relates to the technical field of road construction safety, in particular to a roadbed safety backfill control method and system, and the method comprises the steps: obtaining the related parameter information of roadbed soil and underground water in real time based on a geological sensing technology, and constructing a geological information data set; a strengthening material is introduced into the backfill material, and an auxiliary control strategy is designed; constructing a neural network model based on deep learning, and performing preliminary prediction on parameters of a path backfilling process according to the geological information data set; constructing a self-adaptive feedback mechanism, and adjusting backfill parameter information and an auxiliary control strategy according to real-time geological information and prediction information; and controlling the vibration compaction equipment and the material injection equipment to operate according to the backfilling parameter informati |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118192262A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118192262A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118192262A3</originalsourceid><addsrcrecordid>eNrjZLB0zs8rKcrPUchNLcnIT1FIzEtRKK4sLknNVUjLL1IoTkxLVUhKTM5Oy8zJycxLV8hPUyjKT0xJSk3hYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhhaGlkZGZkaOxsSoAQAhFi5c</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Control method and system for safe backfilling of roadbed</title><source>esp@cenet</source><creator>WANG WEI ; BIE TIANKUI ; LIU LEI ; LI JIE ; LI YUAN ; WANG YU ; LU XIAOFANG ; XIE FEI ; YIN TONGTONG ; FANG BIN ; ZHAO YANG</creator><creatorcontrib>WANG WEI ; BIE TIANKUI ; LIU LEI ; LI JIE ; LI YUAN ; WANG YU ; LU XIAOFANG ; XIE FEI ; YIN TONGTONG ; FANG BIN ; ZHAO YANG</creatorcontrib><description>The invention relates to the technical field of road construction safety, in particular to a roadbed safety backfill control method and system, and the method comprises the steps: obtaining the related parameter information of roadbed soil and underground water in real time based on a geological sensing technology, and constructing a geological information data set; a strengthening material is introduced into the backfill material, and an auxiliary control strategy is designed; constructing a neural network model based on deep learning, and performing preliminary prediction on parameters of a path backfilling process according to the geological information data set; constructing a self-adaptive feedback mechanism, and adjusting backfill parameter information and an auxiliary control strategy according to real-time geological information and prediction information; and controlling the vibration compaction equipment and the material injection equipment to operate according to the backfilling parameter informati</description><language>chi ; eng</language><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE ; CONTROL OR REGULATING SYSTEMS IN GENERAL ; CONTROLLING ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS ; HYDRAULIC ENGINEERING ; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR ; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS ; PHYSICS ; REGULATING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240614&DB=EPODOC&CC=CN&NR=118192262A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76516</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240614&DB=EPODOC&CC=CN&NR=118192262A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG WEI</creatorcontrib><creatorcontrib>BIE TIANKUI</creatorcontrib><creatorcontrib>LIU LEI</creatorcontrib><creatorcontrib>LI JIE</creatorcontrib><creatorcontrib>LI YUAN</creatorcontrib><creatorcontrib>WANG YU</creatorcontrib><creatorcontrib>LU XIAOFANG</creatorcontrib><creatorcontrib>XIE FEI</creatorcontrib><creatorcontrib>YIN TONGTONG</creatorcontrib><creatorcontrib>FANG BIN</creatorcontrib><creatorcontrib>ZHAO YANG</creatorcontrib><title>Control method and system for safe backfilling of roadbed</title><description>The invention relates to the technical field of road construction safety, in particular to a roadbed safety backfill control method and system, and the method comprises the steps: obtaining the related parameter information of roadbed soil and underground water in real time based on a geological sensing technology, and constructing a geological information data set; a strengthening material is introduced into the backfill material, and an auxiliary control strategy is designed; constructing a neural network model based on deep learning, and performing preliminary prediction on parameters of a path backfilling process according to the geological information data set; constructing a self-adaptive feedback mechanism, and adjusting backfill parameter information and an auxiliary control strategy according to real-time geological information and prediction information; and controlling the vibration compaction equipment and the material injection equipment to operate according to the backfilling parameter informati</description><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</subject><subject>CONTROL OR REGULATING SYSTEMS IN GENERAL</subject><subject>CONTROLLING</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</subject><subject>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</subject><subject>PHYSICS</subject><subject>REGULATING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLB0zs8rKcrPUchNLcnIT1FIzEtRKK4sLknNVUjLL1IoTkxLVUhKTM5Oy8zJycxLV8hPUyjKT0xJSk3hYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhhaGlkZGZkaOxsSoAQAhFi5c</recordid><startdate>20240614</startdate><enddate>20240614</enddate><creator>WANG WEI</creator><creator>BIE TIANKUI</creator><creator>LIU LEI</creator><creator>LI JIE</creator><creator>LI YUAN</creator><creator>WANG YU</creator><creator>LU XIAOFANG</creator><creator>XIE FEI</creator><creator>YIN TONGTONG</creator><creator>FANG BIN</creator><creator>ZHAO YANG</creator><scope>EVB</scope></search><sort><creationdate>20240614</creationdate><title>Control method and system for safe backfilling of roadbed</title><author>WANG WEI ; BIE TIANKUI ; LIU LEI ; LI JIE ; LI YUAN ; WANG YU ; LU XIAOFANG ; XIE FEI ; YIN TONGTONG ; FANG BIN ; ZHAO YANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118192262A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</topic><topic>CONTROL OR REGULATING SYSTEMS IN GENERAL</topic><topic>CONTROLLING</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</topic><topic>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</topic><topic>PHYSICS</topic><topic>REGULATING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG WEI</creatorcontrib><creatorcontrib>BIE TIANKUI</creatorcontrib><creatorcontrib>LIU LEI</creatorcontrib><creatorcontrib>LI JIE</creatorcontrib><creatorcontrib>LI YUAN</creatorcontrib><creatorcontrib>WANG YU</creatorcontrib><creatorcontrib>LU XIAOFANG</creatorcontrib><creatorcontrib>XIE FEI</creatorcontrib><creatorcontrib>YIN TONGTONG</creatorcontrib><creatorcontrib>FANG BIN</creatorcontrib><creatorcontrib>ZHAO YANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG WEI</au><au>BIE TIANKUI</au><au>LIU LEI</au><au>LI JIE</au><au>LI YUAN</au><au>WANG YU</au><au>LU XIAOFANG</au><au>XIE FEI</au><au>YIN TONGTONG</au><au>FANG BIN</au><au>ZHAO YANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Control method and system for safe backfilling of roadbed</title><date>2024-06-14</date><risdate>2024</risdate><abstract>The invention relates to the technical field of road construction safety, in particular to a roadbed safety backfill control method and system, and the method comprises the steps: obtaining the related parameter information of roadbed soil and underground water in real time based on a geological sensing technology, and constructing a geological information data set; a strengthening material is introduced into the backfill material, and an auxiliary control strategy is designed; constructing a neural network model based on deep learning, and performing preliminary prediction on parameters of a path backfilling process according to the geological information data set; constructing a self-adaptive feedback mechanism, and adjusting backfill parameter information and an auxiliary control strategy according to real-time geological information and prediction information; and controlling the vibration compaction equipment and the material injection equipment to operate according to the backfilling parameter informati</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN118192262A |
source | esp@cenet |
subjects | CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE CONTROL OR REGULATING SYSTEMS IN GENERAL CONTROLLING EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS FUNCTIONAL ELEMENTS OF SUCH SYSTEMS HYDRAULIC ENGINEERING MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS PHYSICS REGULATING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Control method and system for safe backfilling of roadbed |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-14T13%3A27%3A54IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20WEI&rft.date=2024-06-14&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118192262A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |