Control method and system for safe backfilling of roadbed

The invention relates to the technical field of road construction safety, in particular to a roadbed safety backfill control method and system, and the method comprises the steps: obtaining the related parameter information of roadbed soil and underground water in real time based on a geological sen...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG WEI, BIE TIANKUI, LIU LEI, LI JIE, LI YUAN, WANG YU, LU XIAOFANG, XIE FEI, YIN TONGTONG, FANG BIN, ZHAO YANG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WANG WEI
BIE TIANKUI
LIU LEI
LI JIE
LI YUAN
WANG YU
LU XIAOFANG
XIE FEI
YIN TONGTONG
FANG BIN
ZHAO YANG
description The invention relates to the technical field of road construction safety, in particular to a roadbed safety backfill control method and system, and the method comprises the steps: obtaining the related parameter information of roadbed soil and underground water in real time based on a geological sensing technology, and constructing a geological information data set; a strengthening material is introduced into the backfill material, and an auxiliary control strategy is designed; constructing a neural network model based on deep learning, and performing preliminary prediction on parameters of a path backfilling process according to the geological information data set; constructing a self-adaptive feedback mechanism, and adjusting backfill parameter information and an auxiliary control strategy according to real-time geological information and prediction information; and controlling the vibration compaction equipment and the material injection equipment to operate according to the backfilling parameter informati
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118192262A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118192262A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118192262A3</originalsourceid><addsrcrecordid>eNrjZLB0zs8rKcrPUchNLcnIT1FIzEtRKK4sLknNVUjLL1IoTkxLVUhKTM5Oy8zJycxLV8hPUyjKT0xJSk3hYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhhaGlkZGZkaOxsSoAQAhFi5c</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Control method and system for safe backfilling of roadbed</title><source>esp@cenet</source><creator>WANG WEI ; BIE TIANKUI ; LIU LEI ; LI JIE ; LI YUAN ; WANG YU ; LU XIAOFANG ; XIE FEI ; YIN TONGTONG ; FANG BIN ; ZHAO YANG</creator><creatorcontrib>WANG WEI ; BIE TIANKUI ; LIU LEI ; LI JIE ; LI YUAN ; WANG YU ; LU XIAOFANG ; XIE FEI ; YIN TONGTONG ; FANG BIN ; ZHAO YANG</creatorcontrib><description>The invention relates to the technical field of road construction safety, in particular to a roadbed safety backfill control method and system, and the method comprises the steps: obtaining the related parameter information of roadbed soil and underground water in real time based on a geological sensing technology, and constructing a geological information data set; a strengthening material is introduced into the backfill material, and an auxiliary control strategy is designed; constructing a neural network model based on deep learning, and performing preliminary prediction on parameters of a path backfilling process according to the geological information data set; constructing a self-adaptive feedback mechanism, and adjusting backfill parameter information and an auxiliary control strategy according to real-time geological information and prediction information; and controlling the vibration compaction equipment and the material injection equipment to operate according to the backfilling parameter informati</description><language>chi ; eng</language><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE ; CONTROL OR REGULATING SYSTEMS IN GENERAL ; CONTROLLING ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS ; HYDRAULIC ENGINEERING ; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR ; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS ; PHYSICS ; REGULATING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240614&amp;DB=EPODOC&amp;CC=CN&amp;NR=118192262A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76516</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240614&amp;DB=EPODOC&amp;CC=CN&amp;NR=118192262A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG WEI</creatorcontrib><creatorcontrib>BIE TIANKUI</creatorcontrib><creatorcontrib>LIU LEI</creatorcontrib><creatorcontrib>LI JIE</creatorcontrib><creatorcontrib>LI YUAN</creatorcontrib><creatorcontrib>WANG YU</creatorcontrib><creatorcontrib>LU XIAOFANG</creatorcontrib><creatorcontrib>XIE FEI</creatorcontrib><creatorcontrib>YIN TONGTONG</creatorcontrib><creatorcontrib>FANG BIN</creatorcontrib><creatorcontrib>ZHAO YANG</creatorcontrib><title>Control method and system for safe backfilling of roadbed</title><description>The invention relates to the technical field of road construction safety, in particular to a roadbed safety backfill control method and system, and the method comprises the steps: obtaining the related parameter information of roadbed soil and underground water in real time based on a geological sensing technology, and constructing a geological information data set; a strengthening material is introduced into the backfill material, and an auxiliary control strategy is designed; constructing a neural network model based on deep learning, and performing preliminary prediction on parameters of a path backfilling process according to the geological information data set; constructing a self-adaptive feedback mechanism, and adjusting backfill parameter information and an auxiliary control strategy according to real-time geological information and prediction information; and controlling the vibration compaction equipment and the material injection equipment to operate according to the backfilling parameter informati</description><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</subject><subject>CONTROL OR REGULATING SYSTEMS IN GENERAL</subject><subject>CONTROLLING</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</subject><subject>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</subject><subject>PHYSICS</subject><subject>REGULATING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLB0zs8rKcrPUchNLcnIT1FIzEtRKK4sLknNVUjLL1IoTkxLVUhKTM5Oy8zJycxLV8hPUyjKT0xJSk3hYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhhaGlkZGZkaOxsSoAQAhFi5c</recordid><startdate>20240614</startdate><enddate>20240614</enddate><creator>WANG WEI</creator><creator>BIE TIANKUI</creator><creator>LIU LEI</creator><creator>LI JIE</creator><creator>LI YUAN</creator><creator>WANG YU</creator><creator>LU XIAOFANG</creator><creator>XIE FEI</creator><creator>YIN TONGTONG</creator><creator>FANG BIN</creator><creator>ZHAO YANG</creator><scope>EVB</scope></search><sort><creationdate>20240614</creationdate><title>Control method and system for safe backfilling of roadbed</title><author>WANG WEI ; BIE TIANKUI ; LIU LEI ; LI JIE ; LI YUAN ; WANG YU ; LU XIAOFANG ; XIE FEI ; YIN TONGTONG ; FANG BIN ; ZHAO YANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118192262A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</topic><topic>CONTROL OR REGULATING SYSTEMS IN GENERAL</topic><topic>CONTROLLING</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</topic><topic>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</topic><topic>PHYSICS</topic><topic>REGULATING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG WEI</creatorcontrib><creatorcontrib>BIE TIANKUI</creatorcontrib><creatorcontrib>LIU LEI</creatorcontrib><creatorcontrib>LI JIE</creatorcontrib><creatorcontrib>LI YUAN</creatorcontrib><creatorcontrib>WANG YU</creatorcontrib><creatorcontrib>LU XIAOFANG</creatorcontrib><creatorcontrib>XIE FEI</creatorcontrib><creatorcontrib>YIN TONGTONG</creatorcontrib><creatorcontrib>FANG BIN</creatorcontrib><creatorcontrib>ZHAO YANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG WEI</au><au>BIE TIANKUI</au><au>LIU LEI</au><au>LI JIE</au><au>LI YUAN</au><au>WANG YU</au><au>LU XIAOFANG</au><au>XIE FEI</au><au>YIN TONGTONG</au><au>FANG BIN</au><au>ZHAO YANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Control method and system for safe backfilling of roadbed</title><date>2024-06-14</date><risdate>2024</risdate><abstract>The invention relates to the technical field of road construction safety, in particular to a roadbed safety backfill control method and system, and the method comprises the steps: obtaining the related parameter information of roadbed soil and underground water in real time based on a geological sensing technology, and constructing a geological information data set; a strengthening material is introduced into the backfill material, and an auxiliary control strategy is designed; constructing a neural network model based on deep learning, and performing preliminary prediction on parameters of a path backfilling process according to the geological information data set; constructing a self-adaptive feedback mechanism, and adjusting backfill parameter information and an auxiliary control strategy according to real-time geological information and prediction information; and controlling the vibration compaction equipment and the material injection equipment to operate according to the backfilling parameter informati</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118192262A
source esp@cenet
subjects CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE
CONTROL OR REGULATING SYSTEMS IN GENERAL
CONTROLLING
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
FUNCTIONAL ELEMENTS OF SUCH SYSTEMS
HYDRAULIC ENGINEERING
MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS
PHYSICS
REGULATING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Control method and system for safe backfilling of roadbed
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-14T13%3A27%3A54IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20WEI&rft.date=2024-06-14&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118192262A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true