Method for optimizing and adjusting pile foundation construction parameters of pile plate type soilless roadbed
The invention provides a pile foundation construction parameter optimization and adjustment method for a pile plate type soilless roadbed. The method comprises the steps of parameter collection, data set arrangement, data analysis model establishment, model training, model evaluation, parameter opti...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention provides a pile foundation construction parameter optimization and adjustment method for a pile plate type soilless roadbed. The method comprises the steps of parameter collection, data set arrangement, data analysis model establishment, model training, model evaluation, parameter optimization and model application. The pile foundation construction parameter optimization and adjustment method for the pile plate type soilless roadbed is suitable for the field of constructional engineering and has the advantages of certain accuracy, safety, wide applicability and the like.
本发明提供了一种桩板式无土路基的桩基施工参数优化调整方法,包括参数的采集、数据集整理、数据分析模型的建立、模型训练、模型评估、参数调优和模型应用;本发明提供的一种桩板式无土路基的桩基施工参数优化调整方法,适用于建筑工程领域,具有一定的准确性、安全性和较广泛的适用性等优点。 |
---|