Park power distribution network power supply capability analysis method
The invention relates to a power supply capability analysis method for a park power distribution network, and the method comprises the steps: building a safety domain model of the park power distribution network, searching for the load increase criticality and a load upper limit boundary, and search...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | LI YUNXIU WANG JING NIU RONGJIE XIAO JUN WANG KANGLI YANG XINMIAO LIANG HAISHEN HAO JINNA LI GUODONG SONG HONGYU ZU GUOQIANG YUAN HECHAO |
description | The invention relates to a power supply capability analysis method for a park power distribution network, and the method comprises the steps: building a safety domain model of the park power distribution network, searching for the load increase criticality and a load upper limit boundary, and searching for the load reduction criticality and a load lower limit boundary, building a power supply capability upper and lower limit curve model of the park power distribution network, and carrying out the calculation of the consumption capability of the park power distribution network. The method achieves the evaluation of the park power distribution network, guides the subsequent planning and construction of the park power distribution network, and serves the development of the park.
本发明涉及一种园区配电网供电能力分析方法,通过构建园区配电网安全域模型,寻解负荷增长临界性与负荷上限边界、负荷消减临界性与负荷下限边界,建立园区配电网供电能力上下限曲线模型,开展园区配电网的消纳能力的计算。本发明实现对园区配电网进行评估,指导园区配电网后续规划建设,服务园区发展。 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118052460A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118052460A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118052460A3</originalsourceid><addsrcrecordid>eNrjZHAPSCzKVijIL08tUkjJLC4pykwqLcnMz1PISy0pz4dLFZcWFORUKiQnFiQmZeZkllQqJOYl5lQWZxYr5KaWZOSn8DCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxORUoInxzn6GhhYGpkYmZgaOxsSoAQDk8zTq</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Park power distribution network power supply capability analysis method</title><source>esp@cenet</source><creator>LI YUNXIU ; WANG JING ; NIU RONGJIE ; XIAO JUN ; WANG KANGLI ; YANG XINMIAO ; LIANG HAISHEN ; HAO JINNA ; LI GUODONG ; SONG HONGYU ; ZU GUOQIANG ; YUAN HECHAO</creator><creatorcontrib>LI YUNXIU ; WANG JING ; NIU RONGJIE ; XIAO JUN ; WANG KANGLI ; YANG XINMIAO ; LIANG HAISHEN ; HAO JINNA ; LI GUODONG ; SONG HONGYU ; ZU GUOQIANG ; YUAN HECHAO</creatorcontrib><description>The invention relates to a power supply capability analysis method for a park power distribution network, and the method comprises the steps: building a safety domain model of the park power distribution network, searching for the load increase criticality and a load upper limit boundary, and searching for the load reduction criticality and a load lower limit boundary, building a power supply capability upper and lower limit curve model of the park power distribution network, and carrying out the calculation of the consumption capability of the park power distribution network. The method achieves the evaluation of the park power distribution network, guides the subsequent planning and construction of the park power distribution network, and serves the development of the park.
本发明涉及一种园区配电网供电能力分析方法,通过构建园区配电网安全域模型,寻解负荷增长临界性与负荷上限边界、负荷消减临界性与负荷下限边界,建立园区配电网供电能力上下限曲线模型,开展园区配电网的消纳能力的计算。本发明实现对园区配电网进行评估,指导园区配电网后续规划建设,服务园区发展。</description><language>chi ; eng</language><subject>CALCULATING ; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER ; COMPUTING ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; ELECTRICITY ; GENERATION ; PHYSICS ; SYSTEMS FOR STORING ELECTRIC ENERGY ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240517&DB=EPODOC&CC=CN&NR=118052460A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240517&DB=EPODOC&CC=CN&NR=118052460A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LI YUNXIU</creatorcontrib><creatorcontrib>WANG JING</creatorcontrib><creatorcontrib>NIU RONGJIE</creatorcontrib><creatorcontrib>XIAO JUN</creatorcontrib><creatorcontrib>WANG KANGLI</creatorcontrib><creatorcontrib>YANG XINMIAO</creatorcontrib><creatorcontrib>LIANG HAISHEN</creatorcontrib><creatorcontrib>HAO JINNA</creatorcontrib><creatorcontrib>LI GUODONG</creatorcontrib><creatorcontrib>SONG HONGYU</creatorcontrib><creatorcontrib>ZU GUOQIANG</creatorcontrib><creatorcontrib>YUAN HECHAO</creatorcontrib><title>Park power distribution network power supply capability analysis method</title><description>The invention relates to a power supply capability analysis method for a park power distribution network, and the method comprises the steps: building a safety domain model of the park power distribution network, searching for the load increase criticality and a load upper limit boundary, and searching for the load reduction criticality and a load lower limit boundary, building a power supply capability upper and lower limit curve model of the park power distribution network, and carrying out the calculation of the consumption capability of the park power distribution network. The method achieves the evaluation of the park power distribution network, guides the subsequent planning and construction of the park power distribution network, and serves the development of the park.
本发明涉及一种园区配电网供电能力分析方法,通过构建园区配电网安全域模型,寻解负荷增长临界性与负荷上限边界、负荷消减临界性与负荷下限边界,建立园区配电网供电能力上下限曲线模型,开展园区配电网的消纳能力的计算。本发明实现对园区配电网进行评估,指导园区配电网后续规划建设,服务园区发展。</description><subject>CALCULATING</subject><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</subject><subject>COMPUTING</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>ELECTRICITY</subject><subject>GENERATION</subject><subject>PHYSICS</subject><subject>SYSTEMS FOR STORING ELECTRIC ENERGY</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHAPSCzKVijIL08tUkjJLC4pykwqLcnMz1PISy0pz4dLFZcWFORUKiQnFiQmZeZkllQqJOYl5lQWZxYr5KaWZOSn8DCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxORUoInxzn6GhhYGpkYmZgaOxsSoAQDk8zTq</recordid><startdate>20240517</startdate><enddate>20240517</enddate><creator>LI YUNXIU</creator><creator>WANG JING</creator><creator>NIU RONGJIE</creator><creator>XIAO JUN</creator><creator>WANG KANGLI</creator><creator>YANG XINMIAO</creator><creator>LIANG HAISHEN</creator><creator>HAO JINNA</creator><creator>LI GUODONG</creator><creator>SONG HONGYU</creator><creator>ZU GUOQIANG</creator><creator>YUAN HECHAO</creator><scope>EVB</scope></search><sort><creationdate>20240517</creationdate><title>Park power distribution network power supply capability analysis method</title><author>LI YUNXIU ; WANG JING ; NIU RONGJIE ; XIAO JUN ; WANG KANGLI ; YANG XINMIAO ; LIANG HAISHEN ; HAO JINNA ; LI GUODONG ; SONG HONGYU ; ZU GUOQIANG ; YUAN HECHAO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118052460A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>CALCULATING</topic><topic>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</topic><topic>COMPUTING</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>ELECTRICITY</topic><topic>GENERATION</topic><topic>PHYSICS</topic><topic>SYSTEMS FOR STORING ELECTRIC ENERGY</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>LI YUNXIU</creatorcontrib><creatorcontrib>WANG JING</creatorcontrib><creatorcontrib>NIU RONGJIE</creatorcontrib><creatorcontrib>XIAO JUN</creatorcontrib><creatorcontrib>WANG KANGLI</creatorcontrib><creatorcontrib>YANG XINMIAO</creatorcontrib><creatorcontrib>LIANG HAISHEN</creatorcontrib><creatorcontrib>HAO JINNA</creatorcontrib><creatorcontrib>LI GUODONG</creatorcontrib><creatorcontrib>SONG HONGYU</creatorcontrib><creatorcontrib>ZU GUOQIANG</creatorcontrib><creatorcontrib>YUAN HECHAO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LI YUNXIU</au><au>WANG JING</au><au>NIU RONGJIE</au><au>XIAO JUN</au><au>WANG KANGLI</au><au>YANG XINMIAO</au><au>LIANG HAISHEN</au><au>HAO JINNA</au><au>LI GUODONG</au><au>SONG HONGYU</au><au>ZU GUOQIANG</au><au>YUAN HECHAO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Park power distribution network power supply capability analysis method</title><date>2024-05-17</date><risdate>2024</risdate><abstract>The invention relates to a power supply capability analysis method for a park power distribution network, and the method comprises the steps: building a safety domain model of the park power distribution network, searching for the load increase criticality and a load upper limit boundary, and searching for the load reduction criticality and a load lower limit boundary, building a power supply capability upper and lower limit curve model of the park power distribution network, and carrying out the calculation of the consumption capability of the park power distribution network. The method achieves the evaluation of the park power distribution network, guides the subsequent planning and construction of the park power distribution network, and serves the development of the park.
本发明涉及一种园区配电网供电能力分析方法,通过构建园区配电网安全域模型,寻解负荷增长临界性与负荷上限边界、负荷消减临界性与负荷下限边界,建立园区配电网供电能力上下限曲线模型,开展园区配电网的消纳能力的计算。本发明实现对园区配电网进行评估,指导园区配电网后续规划建设,服务园区发展。</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN118052460A |
source | esp@cenet |
subjects | CALCULATING CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER COMPUTING CONVERSION OR DISTRIBUTION OF ELECTRIC POWER COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ELECTRICITY GENERATION PHYSICS SYSTEMS FOR STORING ELECTRIC ENERGY SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | Park power distribution network power supply capability analysis method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-29T15%3A46%3A28IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LI%20YUNXIU&rft.date=2024-05-17&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118052460A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |