Cap-shaped reinforcing construction method for miscellaneous fill area at top of tunnel

The invention relates to the technical field of stratum reinforcement, in particular to a tunnel top miscellaneous fill area cap-shaped reinforcement construction method which specifically comprises the steps that area division is conducted according to a tunnel top miscellaneous fill area; carrying...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHAO JUNLIANG, CAO WENQIANG, CHEN DANFENG, PENG JIANGTAO, CHEN PENG, WANG XI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator CHAO JUNLIANG
CAO WENQIANG
CHEN DANFENG
PENG JIANGTAO
CHEN PENG
WANG XI
description The invention relates to the technical field of stratum reinforcement, in particular to a tunnel top miscellaneous fill area cap-shaped reinforcement construction method which specifically comprises the steps that area division is conducted according to a tunnel top miscellaneous fill area; carrying out partition edge sealing on the divided areas; and grouting slurry is injected into the subareas after edge sealing. According to the reinforcing construction method, the reinforcing areas in the original area are arranged in a partitioned mode, grouting is carried out according to different reinforcing areas and different grouting liquid and grouting heights, meanwhile, partitioned edge sealing is carried out according to the strong reinforcing areas, the supporting capacity of the reinforcing body surrounding rock is further guaranteed, and therefore the working procedure is reasonably arranged, and the construction efficiency is improved. On the premise that normal excavation and support of the tunnel are not
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118007655A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118007655A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118007655A3</originalsourceid><addsrcrecordid>eNqNyrEKwjAQgOEuDqK-w_kAhRapukpQnJwEx3KkFxu43oXk8v46-ABO__D96-blMLVlxkQTZIoSNPsob_AqxXL1FlVgIZt1gq_BEosnZhTSWiBEZsBMCGhgmkADWBUh3jargFxo9-um2d-uT3dvKelIJaEnIRvdo-_PXXc6DsPl8M_zAYhnOiY</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Cap-shaped reinforcing construction method for miscellaneous fill area at top of tunnel</title><source>esp@cenet</source><creator>CHAO JUNLIANG ; CAO WENQIANG ; CHEN DANFENG ; PENG JIANGTAO ; CHEN PENG ; WANG XI</creator><creatorcontrib>CHAO JUNLIANG ; CAO WENQIANG ; CHEN DANFENG ; PENG JIANGTAO ; CHEN PENG ; WANG XI</creatorcontrib><description>The invention relates to the technical field of stratum reinforcement, in particular to a tunnel top miscellaneous fill area cap-shaped reinforcement construction method which specifically comprises the steps that area division is conducted according to a tunnel top miscellaneous fill area; carrying out partition edge sealing on the divided areas; and grouting slurry is injected into the subareas after edge sealing. According to the reinforcing construction method, the reinforcing areas in the original area are arranged in a partitioned mode, grouting is carried out according to different reinforcing areas and different grouting liquid and grouting heights, meanwhile, partitioned edge sealing is carried out according to the strong reinforcing areas, the supporting capacity of the reinforcing body surrounding rock is further guaranteed, and therefore the working procedure is reasonably arranged, and the construction efficiency is improved. On the premise that normal excavation and support of the tunnel are not</description><language>chi ; eng</language><subject>ARTIFICIAL STONE ; CEMENTS ; CERAMICS ; CHEMISTRY ; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS ; CONCRETE ; EARTH DRILLING ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; GALLERIES ; HYDRAULIC ENGINEERING ; LARGE UNDERGROUND CHAMBERS ; LIME, MAGNESIA ; METALLURGY ; MINING ; REFRACTORIES ; SHAFTS ; SLAG ; SOIL SHIFTING ; TREATMENT OF NATURAL STONE ; TUNNELS ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240510&amp;DB=EPODOC&amp;CC=CN&amp;NR=118007655A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25562,76317</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240510&amp;DB=EPODOC&amp;CC=CN&amp;NR=118007655A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CHAO JUNLIANG</creatorcontrib><creatorcontrib>CAO WENQIANG</creatorcontrib><creatorcontrib>CHEN DANFENG</creatorcontrib><creatorcontrib>PENG JIANGTAO</creatorcontrib><creatorcontrib>CHEN PENG</creatorcontrib><creatorcontrib>WANG XI</creatorcontrib><title>Cap-shaped reinforcing construction method for miscellaneous fill area at top of tunnel</title><description>The invention relates to the technical field of stratum reinforcement, in particular to a tunnel top miscellaneous fill area cap-shaped reinforcement construction method which specifically comprises the steps that area division is conducted according to a tunnel top miscellaneous fill area; carrying out partition edge sealing on the divided areas; and grouting slurry is injected into the subareas after edge sealing. According to the reinforcing construction method, the reinforcing areas in the original area are arranged in a partitioned mode, grouting is carried out according to different reinforcing areas and different grouting liquid and grouting heights, meanwhile, partitioned edge sealing is carried out according to the strong reinforcing areas, the supporting capacity of the reinforcing body surrounding rock is further guaranteed, and therefore the working procedure is reasonably arranged, and the construction efficiency is improved. On the premise that normal excavation and support of the tunnel are not</description><subject>ARTIFICIAL STONE</subject><subject>CEMENTS</subject><subject>CERAMICS</subject><subject>CHEMISTRY</subject><subject>COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS</subject><subject>CONCRETE</subject><subject>EARTH DRILLING</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>GALLERIES</subject><subject>HYDRAULIC ENGINEERING</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>LIME, MAGNESIA</subject><subject>METALLURGY</subject><subject>MINING</subject><subject>REFRACTORIES</subject><subject>SHAFTS</subject><subject>SLAG</subject><subject>SOIL SHIFTING</subject><subject>TREATMENT OF NATURAL STONE</subject><subject>TUNNELS</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyrEKwjAQgOEuDqK-w_kAhRapukpQnJwEx3KkFxu43oXk8v46-ABO__D96-blMLVlxkQTZIoSNPsob_AqxXL1FlVgIZt1gq_BEosnZhTSWiBEZsBMCGhgmkADWBUh3jargFxo9-um2d-uT3dvKelIJaEnIRvdo-_PXXc6DsPl8M_zAYhnOiY</recordid><startdate>20240510</startdate><enddate>20240510</enddate><creator>CHAO JUNLIANG</creator><creator>CAO WENQIANG</creator><creator>CHEN DANFENG</creator><creator>PENG JIANGTAO</creator><creator>CHEN PENG</creator><creator>WANG XI</creator><scope>EVB</scope></search><sort><creationdate>20240510</creationdate><title>Cap-shaped reinforcing construction method for miscellaneous fill area at top of tunnel</title><author>CHAO JUNLIANG ; CAO WENQIANG ; CHEN DANFENG ; PENG JIANGTAO ; CHEN PENG ; WANG XI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118007655A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>ARTIFICIAL STONE</topic><topic>CEMENTS</topic><topic>CERAMICS</topic><topic>CHEMISTRY</topic><topic>COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS</topic><topic>CONCRETE</topic><topic>EARTH DRILLING</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>GALLERIES</topic><topic>HYDRAULIC ENGINEERING</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>LIME, MAGNESIA</topic><topic>METALLURGY</topic><topic>MINING</topic><topic>REFRACTORIES</topic><topic>SHAFTS</topic><topic>SLAG</topic><topic>SOIL SHIFTING</topic><topic>TREATMENT OF NATURAL STONE</topic><topic>TUNNELS</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>CHAO JUNLIANG</creatorcontrib><creatorcontrib>CAO WENQIANG</creatorcontrib><creatorcontrib>CHEN DANFENG</creatorcontrib><creatorcontrib>PENG JIANGTAO</creatorcontrib><creatorcontrib>CHEN PENG</creatorcontrib><creatorcontrib>WANG XI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CHAO JUNLIANG</au><au>CAO WENQIANG</au><au>CHEN DANFENG</au><au>PENG JIANGTAO</au><au>CHEN PENG</au><au>WANG XI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Cap-shaped reinforcing construction method for miscellaneous fill area at top of tunnel</title><date>2024-05-10</date><risdate>2024</risdate><abstract>The invention relates to the technical field of stratum reinforcement, in particular to a tunnel top miscellaneous fill area cap-shaped reinforcement construction method which specifically comprises the steps that area division is conducted according to a tunnel top miscellaneous fill area; carrying out partition edge sealing on the divided areas; and grouting slurry is injected into the subareas after edge sealing. According to the reinforcing construction method, the reinforcing areas in the original area are arranged in a partitioned mode, grouting is carried out according to different reinforcing areas and different grouting liquid and grouting heights, meanwhile, partitioned edge sealing is carried out according to the strong reinforcing areas, the supporting capacity of the reinforcing body surrounding rock is further guaranteed, and therefore the working procedure is reasonably arranged, and the construction efficiency is improved. On the premise that normal excavation and support of the tunnel are not</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118007655A
source esp@cenet
subjects ARTIFICIAL STONE
CEMENTS
CERAMICS
CHEMISTRY
COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS
CONCRETE
EARTH DRILLING
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
GALLERIES
HYDRAULIC ENGINEERING
LARGE UNDERGROUND CHAMBERS
LIME, MAGNESIA
METALLURGY
MINING
REFRACTORIES
SHAFTS
SLAG
SOIL SHIFTING
TREATMENT OF NATURAL STONE
TUNNELS
UNDERGROUND OR UNDERWATER STRUCTURES
title Cap-shaped reinforcing construction method for miscellaneous fill area at top of tunnel
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-14T13%3A36%3A53IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CHAO%20JUNLIANG&rft.date=2024-05-10&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118007655A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true