Breakwater laid by accropode and construction method

The invention discloses an accropode laid breakwater and a construction method, the breakwater comprises a dam base body, a continuous laying area and a non-continuous laying area, the dam base body extends along a coastline and is provided with an inclined dam surface facing a water area; the concr...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: DING DEKUN, ZHANG BO, WU YAFEI, ZHONG WEILIANG, FAN LIFENG, PEI RUI, ZHAO QIUJIN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator DING DEKUN
ZHANG BO
WU YAFEI
ZHONG WEILIANG
FAN LIFENG
PEI RUI
ZHAO QIUJIN
description The invention discloses an accropode laid breakwater and a construction method, the breakwater comprises a dam base body, a continuous laying area and a non-continuous laying area, the dam base body extends along a coastline and is provided with an inclined dam surface facing a water area; the concrete accropode in the continuous laying area is laid near the lower edge of the inclined breakwater face in a full distribution mode and extends in the direction of the breakwater. And geopolymer accropode in the discontinuous laying area is laid on the inclined breakwater face in a non-full-distribution mode and extends in the direction of the breakwater, and the continuous laying area is connected with the discontinuous laying area to form a protection structure covering the dam base body. Wherein the geopolymer accropode is prepared on site by taking dredged mud as a raw material, the structure forms a continuous protection structure covering the surface of the breakwater, and the continuous protection structure
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118007574A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118007574A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118007574A3</originalsourceid><addsrcrecordid>eNrjZDBxKkpNzC5PLEktUshJzExRSKpUSExOLsovyE9JVUjMS1FIzs8rLikqTS7JzM9TyE0tychP4WFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8c5-hoYWBgbmpuYmjsbEqAEAOHEs6Q</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Breakwater laid by accropode and construction method</title><source>esp@cenet</source><creator>DING DEKUN ; ZHANG BO ; WU YAFEI ; ZHONG WEILIANG ; FAN LIFENG ; PEI RUI ; ZHAO QIUJIN</creator><creatorcontrib>DING DEKUN ; ZHANG BO ; WU YAFEI ; ZHONG WEILIANG ; FAN LIFENG ; PEI RUI ; ZHAO QIUJIN</creatorcontrib><description>The invention discloses an accropode laid breakwater and a construction method, the breakwater comprises a dam base body, a continuous laying area and a non-continuous laying area, the dam base body extends along a coastline and is provided with an inclined dam surface facing a water area; the concrete accropode in the continuous laying area is laid near the lower edge of the inclined breakwater face in a full distribution mode and extends in the direction of the breakwater. And geopolymer accropode in the discontinuous laying area is laid on the inclined breakwater face in a non-full-distribution mode and extends in the direction of the breakwater, and the continuous laying area is connected with the discontinuous laying area to form a protection structure covering the dam base body. Wherein the geopolymer accropode is prepared on site by taking dredged mud as a raw material, the structure forms a continuous protection structure covering the surface of the breakwater, and the continuous protection structure</description><language>chi ; eng</language><subject>FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; PERFORMING OPERATIONS ; SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG, OR MIXTURESCONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER ; SOIL SHIFTING ; TRANSPORTING ; WORKING CEMENT, CLAY, OR STONE</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240510&amp;DB=EPODOC&amp;CC=CN&amp;NR=118007574A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240510&amp;DB=EPODOC&amp;CC=CN&amp;NR=118007574A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>DING DEKUN</creatorcontrib><creatorcontrib>ZHANG BO</creatorcontrib><creatorcontrib>WU YAFEI</creatorcontrib><creatorcontrib>ZHONG WEILIANG</creatorcontrib><creatorcontrib>FAN LIFENG</creatorcontrib><creatorcontrib>PEI RUI</creatorcontrib><creatorcontrib>ZHAO QIUJIN</creatorcontrib><title>Breakwater laid by accropode and construction method</title><description>The invention discloses an accropode laid breakwater and a construction method, the breakwater comprises a dam base body, a continuous laying area and a non-continuous laying area, the dam base body extends along a coastline and is provided with an inclined dam surface facing a water area; the concrete accropode in the continuous laying area is laid near the lower edge of the inclined breakwater face in a full distribution mode and extends in the direction of the breakwater. And geopolymer accropode in the discontinuous laying area is laid on the inclined breakwater face in a non-full-distribution mode and extends in the direction of the breakwater, and the continuous laying area is connected with the discontinuous laying area to form a protection structure covering the dam base body. Wherein the geopolymer accropode is prepared on site by taking dredged mud as a raw material, the structure forms a continuous protection structure covering the surface of the breakwater, and the continuous protection structure</description><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>PERFORMING OPERATIONS</subject><subject>SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG, OR MIXTURESCONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER</subject><subject>SOIL SHIFTING</subject><subject>TRANSPORTING</subject><subject>WORKING CEMENT, CLAY, OR STONE</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDBxKkpNzC5PLEktUshJzExRSKpUSExOLsovyE9JVUjMS1FIzs8rLikqTS7JzM9TyE0tychP4WFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8c5-hoYWBgbmpuYmjsbEqAEAOHEs6Q</recordid><startdate>20240510</startdate><enddate>20240510</enddate><creator>DING DEKUN</creator><creator>ZHANG BO</creator><creator>WU YAFEI</creator><creator>ZHONG WEILIANG</creator><creator>FAN LIFENG</creator><creator>PEI RUI</creator><creator>ZHAO QIUJIN</creator><scope>EVB</scope></search><sort><creationdate>20240510</creationdate><title>Breakwater laid by accropode and construction method</title><author>DING DEKUN ; ZHANG BO ; WU YAFEI ; ZHONG WEILIANG ; FAN LIFENG ; PEI RUI ; ZHAO QIUJIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118007574A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>PERFORMING OPERATIONS</topic><topic>SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG, OR MIXTURESCONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER</topic><topic>SOIL SHIFTING</topic><topic>TRANSPORTING</topic><topic>WORKING CEMENT, CLAY, OR STONE</topic><toplevel>online_resources</toplevel><creatorcontrib>DING DEKUN</creatorcontrib><creatorcontrib>ZHANG BO</creatorcontrib><creatorcontrib>WU YAFEI</creatorcontrib><creatorcontrib>ZHONG WEILIANG</creatorcontrib><creatorcontrib>FAN LIFENG</creatorcontrib><creatorcontrib>PEI RUI</creatorcontrib><creatorcontrib>ZHAO QIUJIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>DING DEKUN</au><au>ZHANG BO</au><au>WU YAFEI</au><au>ZHONG WEILIANG</au><au>FAN LIFENG</au><au>PEI RUI</au><au>ZHAO QIUJIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Breakwater laid by accropode and construction method</title><date>2024-05-10</date><risdate>2024</risdate><abstract>The invention discloses an accropode laid breakwater and a construction method, the breakwater comprises a dam base body, a continuous laying area and a non-continuous laying area, the dam base body extends along a coastline and is provided with an inclined dam surface facing a water area; the concrete accropode in the continuous laying area is laid near the lower edge of the inclined breakwater face in a full distribution mode and extends in the direction of the breakwater. And geopolymer accropode in the discontinuous laying area is laid on the inclined breakwater face in a non-full-distribution mode and extends in the direction of the breakwater, and the continuous laying area is connected with the discontinuous laying area to form a protection structure covering the dam base body. Wherein the geopolymer accropode is prepared on site by taking dredged mud as a raw material, the structure forms a continuous protection structure covering the surface of the breakwater, and the continuous protection structure</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118007574A
source esp@cenet
subjects FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
PERFORMING OPERATIONS
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG, OR MIXTURESCONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
SOIL SHIFTING
TRANSPORTING
WORKING CEMENT, CLAY, OR STONE
title Breakwater laid by accropode and construction method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-30T12%3A25%3A22IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=DING%20DEKUN&rft.date=2024-05-10&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118007574A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true