Transformer load adjusting method and device, storage medium and processor

The invention discloses a transformer load adjusting method and device, a storage medium and a processor. The method comprises the steps that operation data of a plurality of transformers in a target area and first load demand data of the target area are acquired, and the first load demand data are...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LI JINBEI, MA SIYA, HUANG MINGHAO, ZHAO MINGRAN, WANG SHENG, OU RANQING, LIANG ZIYANG, ZHONG YAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LI JINBEI
MA SIYA
HUANG MINGHAO
ZHAO MINGRAN
WANG SHENG
OU RANQING
LIANG ZIYANG
ZHONG YAN
description The invention discloses a transformer load adjusting method and device, a storage medium and a processor. The method comprises the steps that operation data of a plurality of transformers in a target area and first load demand data of the target area are acquired, and the first load demand data are used for at least indicating the power utilization demand of loads in the target area; based on the operation data and the first load demand data, the multiple transformers are initialized, a transformer cluster is obtained, and the transformer cluster comprises initial loads corresponding to the multiple transformers in the target area; the transformer cluster is updated for at least one time, an updated transformer cluster is obtained, and the updated transformer cluster comprises second load demand data of the multiple transformers; and adjusting the output power of each transformer based on the second load demand data of each transformer. The technical problem that the loss of the distribution transformer canno
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117996791A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117996791A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117996791A3</originalsourceid><addsrcrecordid>eNrjZPAKKUrMK07LL8pNLVLIyU9MUUhMySotLsnMS1fITS3JyAcK5KUopKSWZSan6igUl-QXJaanAqVSMktzwVIFRfnJqcXF-UU8DKxpiTnFqbxQmptB0c01xNlDN7UgPz61uCAxOTUvtSTe2c_Q0NzS0szc0tDRmBg1ADPbNUo</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Transformer load adjusting method and device, storage medium and processor</title><source>esp@cenet</source><creator>LI JINBEI ; MA SIYA ; HUANG MINGHAO ; ZHAO MINGRAN ; WANG SHENG ; OU RANQING ; LIANG ZIYANG ; ZHONG YAN</creator><creatorcontrib>LI JINBEI ; MA SIYA ; HUANG MINGHAO ; ZHAO MINGRAN ; WANG SHENG ; OU RANQING ; LIANG ZIYANG ; ZHONG YAN</creatorcontrib><description>The invention discloses a transformer load adjusting method and device, a storage medium and a processor. The method comprises the steps that operation data of a plurality of transformers in a target area and first load demand data of the target area are acquired, and the first load demand data are used for at least indicating the power utilization demand of loads in the target area; based on the operation data and the first load demand data, the multiple transformers are initialized, a transformer cluster is obtained, and the transformer cluster comprises initial loads corresponding to the multiple transformers in the target area; the transformer cluster is updated for at least one time, an updated transformer cluster is obtained, and the updated transformer cluster comprises second load demand data of the multiple transformers; and adjusting the output power of each transformer based on the second load demand data of each transformer. The technical problem that the loss of the distribution transformer canno</description><language>chi ; eng</language><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; ELECTRICITY ; GENERATION ; SYSTEMS FOR STORING ELECTRIC ENERGY</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240507&amp;DB=EPODOC&amp;CC=CN&amp;NR=117996791A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,778,883,25547,76298</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240507&amp;DB=EPODOC&amp;CC=CN&amp;NR=117996791A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LI JINBEI</creatorcontrib><creatorcontrib>MA SIYA</creatorcontrib><creatorcontrib>HUANG MINGHAO</creatorcontrib><creatorcontrib>ZHAO MINGRAN</creatorcontrib><creatorcontrib>WANG SHENG</creatorcontrib><creatorcontrib>OU RANQING</creatorcontrib><creatorcontrib>LIANG ZIYANG</creatorcontrib><creatorcontrib>ZHONG YAN</creatorcontrib><title>Transformer load adjusting method and device, storage medium and processor</title><description>The invention discloses a transformer load adjusting method and device, a storage medium and a processor. The method comprises the steps that operation data of a plurality of transformers in a target area and first load demand data of the target area are acquired, and the first load demand data are used for at least indicating the power utilization demand of loads in the target area; based on the operation data and the first load demand data, the multiple transformers are initialized, a transformer cluster is obtained, and the transformer cluster comprises initial loads corresponding to the multiple transformers in the target area; the transformer cluster is updated for at least one time, an updated transformer cluster is obtained, and the updated transformer cluster comprises second load demand data of the multiple transformers; and adjusting the output power of each transformer based on the second load demand data of each transformer. The technical problem that the loss of the distribution transformer canno</description><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>ELECTRICITY</subject><subject>GENERATION</subject><subject>SYSTEMS FOR STORING ELECTRIC ENERGY</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPAKKUrMK07LL8pNLVLIyU9MUUhMySotLsnMS1fITS3JyAcK5KUopKSWZSan6igUl-QXJaanAqVSMktzwVIFRfnJqcXF-UU8DKxpiTnFqbxQmptB0c01xNlDN7UgPz61uCAxOTUvtSTe2c_Q0NzS0szc0tDRmBg1ADPbNUo</recordid><startdate>20240507</startdate><enddate>20240507</enddate><creator>LI JINBEI</creator><creator>MA SIYA</creator><creator>HUANG MINGHAO</creator><creator>ZHAO MINGRAN</creator><creator>WANG SHENG</creator><creator>OU RANQING</creator><creator>LIANG ZIYANG</creator><creator>ZHONG YAN</creator><scope>EVB</scope></search><sort><creationdate>20240507</creationdate><title>Transformer load adjusting method and device, storage medium and processor</title><author>LI JINBEI ; MA SIYA ; HUANG MINGHAO ; ZHAO MINGRAN ; WANG SHENG ; OU RANQING ; LIANG ZIYANG ; ZHONG YAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117996791A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>ELECTRICITY</topic><topic>GENERATION</topic><topic>SYSTEMS FOR STORING ELECTRIC ENERGY</topic><toplevel>online_resources</toplevel><creatorcontrib>LI JINBEI</creatorcontrib><creatorcontrib>MA SIYA</creatorcontrib><creatorcontrib>HUANG MINGHAO</creatorcontrib><creatorcontrib>ZHAO MINGRAN</creatorcontrib><creatorcontrib>WANG SHENG</creatorcontrib><creatorcontrib>OU RANQING</creatorcontrib><creatorcontrib>LIANG ZIYANG</creatorcontrib><creatorcontrib>ZHONG YAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LI JINBEI</au><au>MA SIYA</au><au>HUANG MINGHAO</au><au>ZHAO MINGRAN</au><au>WANG SHENG</au><au>OU RANQING</au><au>LIANG ZIYANG</au><au>ZHONG YAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Transformer load adjusting method and device, storage medium and processor</title><date>2024-05-07</date><risdate>2024</risdate><abstract>The invention discloses a transformer load adjusting method and device, a storage medium and a processor. The method comprises the steps that operation data of a plurality of transformers in a target area and first load demand data of the target area are acquired, and the first load demand data are used for at least indicating the power utilization demand of loads in the target area; based on the operation data and the first load demand data, the multiple transformers are initialized, a transformer cluster is obtained, and the transformer cluster comprises initial loads corresponding to the multiple transformers in the target area; the transformer cluster is updated for at least one time, an updated transformer cluster is obtained, and the updated transformer cluster comprises second load demand data of the multiple transformers; and adjusting the output power of each transformer based on the second load demand data of each transformer. The technical problem that the loss of the distribution transformer canno</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN117996791A
source esp@cenet
subjects CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER
CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
ELECTRICITY
GENERATION
SYSTEMS FOR STORING ELECTRIC ENERGY
title Transformer load adjusting method and device, storage medium and processor
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-16T19%3A56%3A30IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LI%20JINBEI&rft.date=2024-05-07&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117996791A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true