Facility optimization method, device and equipment for power grid construction and storage medium
The invention provides a facility optimization method and device for power grid construction, equipment and a storage medium, and belongs to the field of power grid construction. The method comprises the following steps: acquiring power grid operation data; constructing a target function based on pr...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention provides a facility optimization method and device for power grid construction, equipment and a storage medium, and belongs to the field of power grid construction. The method comprises the following steps: acquiring power grid operation data; constructing a target function based on preset input data of power grid construction and power grid operation data; wherein the objective function is used for evaluating the benefit of power distribution network construction, and the preset input data of the power distribution network construction comprises the types and the number of input facilities; and optimizing the target function based on a particle swarm optimization algorithm to obtain optimal input parameters of power grid construction, the optimal input parameters of the power grid construction including an optimal facility type and an optimal facility number. According to the method, the configuration parameters of the power distribution network construction can be optimized, the optimal facili |
---|