Hole-entering construction method for slowly-inclined stratum tunnel

The invention discloses a construction method for entering a tunnel into a hole in a slowly-inclined stratum. The method comprises the following steps that a tunnel is excavated in a slowly-inclined stratum, a guide wall is arranged, an advanced pipe shed is constructed, then a soil body is excavate...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHAO GANGYING, HU ENLAI, LI XINWANG, WANG HUALING, YAN FEIYUE
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHAO GANGYING
HU ENLAI
LI XINWANG
WANG HUALING
YAN FEIYUE
description The invention discloses a construction method for entering a tunnel into a hole in a slowly-inclined stratum. The method comprises the following steps that a tunnel is excavated in a slowly-inclined stratum, a guide wall is arranged, an advanced pipe shed is constructed, then a soil body is excavated, the pipe shed is constructed before excavation, and the soil body is obliquely divided into blocks and obliquely excavated when the soil body is excavated, so that upward slope excavation is reduced, and the tunnel enters a hole early; for an inclined stratum, the direction of the maximum principal stress is parallel to the slope surface, the arch frame adopts an inclined vertical arch, and the inclination direction is parallel to the slope surface, so that the stress of the arch frame is parallel to the direction of the maximum principal stress, and the stress of the arch frame is most beneficial. The method has the advantages and beneficial effects that (1) earth excavation at the hole is reduced, even zero ex
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117927251A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117927251A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117927251A3</originalsourceid><addsrcrecordid>eNqNyrEKwjAQANAsDqL-w_UDMqQixbG0Sicn9xLSqwaudyW5IP69Dn6A01ve1vSDEFpkxRT5AUE4aypBozAsqE-ZYJYEmeRFbxs5UGSc4Ju8lgW0MCPtzWb2lPHwc2eq6-XeDRZXGTGvPiCjjt3NueZcN_XJtcd_zgcgODO4</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Hole-entering construction method for slowly-inclined stratum tunnel</title><source>esp@cenet</source><creator>ZHAO GANGYING ; HU ENLAI ; LI XINWANG ; WANG HUALING ; YAN FEIYUE</creator><creatorcontrib>ZHAO GANGYING ; HU ENLAI ; LI XINWANG ; WANG HUALING ; YAN FEIYUE</creatorcontrib><description>The invention discloses a construction method for entering a tunnel into a hole in a slowly-inclined stratum. The method comprises the following steps that a tunnel is excavated in a slowly-inclined stratum, a guide wall is arranged, an advanced pipe shed is constructed, then a soil body is excavated, the pipe shed is constructed before excavation, and the soil body is obliquely divided into blocks and obliquely excavated when the soil body is excavated, so that upward slope excavation is reduced, and the tunnel enters a hole early; for an inclined stratum, the direction of the maximum principal stress is parallel to the slope surface, the arch frame adopts an inclined vertical arch, and the inclination direction is parallel to the slope surface, so that the stress of the arch frame is parallel to the direction of the maximum principal stress, and the stress of the arch frame is most beneficial. The method has the advantages and beneficial effects that (1) earth excavation at the hole is reduced, even zero ex</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240426&amp;DB=EPODOC&amp;CC=CN&amp;NR=117927251A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25545,76296</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240426&amp;DB=EPODOC&amp;CC=CN&amp;NR=117927251A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHAO GANGYING</creatorcontrib><creatorcontrib>HU ENLAI</creatorcontrib><creatorcontrib>LI XINWANG</creatorcontrib><creatorcontrib>WANG HUALING</creatorcontrib><creatorcontrib>YAN FEIYUE</creatorcontrib><title>Hole-entering construction method for slowly-inclined stratum tunnel</title><description>The invention discloses a construction method for entering a tunnel into a hole in a slowly-inclined stratum. The method comprises the following steps that a tunnel is excavated in a slowly-inclined stratum, a guide wall is arranged, an advanced pipe shed is constructed, then a soil body is excavated, the pipe shed is constructed before excavation, and the soil body is obliquely divided into blocks and obliquely excavated when the soil body is excavated, so that upward slope excavation is reduced, and the tunnel enters a hole early; for an inclined stratum, the direction of the maximum principal stress is parallel to the slope surface, the arch frame adopts an inclined vertical arch, and the inclination direction is parallel to the slope surface, so that the stress of the arch frame is parallel to the direction of the maximum principal stress, and the stress of the arch frame is most beneficial. The method has the advantages and beneficial effects that (1) earth excavation at the hole is reduced, even zero ex</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyrEKwjAQANAsDqL-w_UDMqQixbG0Sicn9xLSqwaudyW5IP69Dn6A01ve1vSDEFpkxRT5AUE4aypBozAsqE-ZYJYEmeRFbxs5UGSc4Ju8lgW0MCPtzWb2lPHwc2eq6-XeDRZXGTGvPiCjjt3NueZcN_XJtcd_zgcgODO4</recordid><startdate>20240426</startdate><enddate>20240426</enddate><creator>ZHAO GANGYING</creator><creator>HU ENLAI</creator><creator>LI XINWANG</creator><creator>WANG HUALING</creator><creator>YAN FEIYUE</creator><scope>EVB</scope></search><sort><creationdate>20240426</creationdate><title>Hole-entering construction method for slowly-inclined stratum tunnel</title><author>ZHAO GANGYING ; HU ENLAI ; LI XINWANG ; WANG HUALING ; YAN FEIYUE</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117927251A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHAO GANGYING</creatorcontrib><creatorcontrib>HU ENLAI</creatorcontrib><creatorcontrib>LI XINWANG</creatorcontrib><creatorcontrib>WANG HUALING</creatorcontrib><creatorcontrib>YAN FEIYUE</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHAO GANGYING</au><au>HU ENLAI</au><au>LI XINWANG</au><au>WANG HUALING</au><au>YAN FEIYUE</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Hole-entering construction method for slowly-inclined stratum tunnel</title><date>2024-04-26</date><risdate>2024</risdate><abstract>The invention discloses a construction method for entering a tunnel into a hole in a slowly-inclined stratum. The method comprises the following steps that a tunnel is excavated in a slowly-inclined stratum, a guide wall is arranged, an advanced pipe shed is constructed, then a soil body is excavated, the pipe shed is constructed before excavation, and the soil body is obliquely divided into blocks and obliquely excavated when the soil body is excavated, so that upward slope excavation is reduced, and the tunnel enters a hole early; for an inclined stratum, the direction of the maximum principal stress is parallel to the slope surface, the arch frame adopts an inclined vertical arch, and the inclination direction is parallel to the slope surface, so that the stress of the arch frame is parallel to the direction of the maximum principal stress, and the stress of the arch frame is most beneficial. The method has the advantages and beneficial effects that (1) earth excavation at the hole is reduced, even zero ex</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN117927251A
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
TUNNELS
title Hole-entering construction method for slowly-inclined stratum tunnel
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-20T18%3A14%3A05IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHAO%20GANGYING&rft.date=2024-04-26&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117927251A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true