Fabricated cornice construction method
An assembly type cornice construction method specifically comprises the following steps of S1, surveying and setting out, S2, dividing keels in the length direction of a cornice body according to the cornice surveying and setting out condition, S3, arranging a machining area on the site ground, mach...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHANG TAOTAO XU JIAHAO ZHENG YANLAI MA YI TAN KA LIAO XIAOSONG DAI QINGQIN ZHOU WU WU GANG |
description | An assembly type cornice construction method specifically comprises the following steps of S1, surveying and setting out, S2, dividing keels in the length direction of a cornice body according to the cornice surveying and setting out condition, S3, arranging a machining area on the site ground, machining a single-frame framework in the machining area according to the design in the step S2, and then according to the maximum lifting capacity of a tower crane, conducting construction on the single-frame framework according to the design in the step S2. Processing a plurality of single-frame frameworks into a small-frame unit according to a drawing; s3, aluminum plate processing; s5, the aluminum plate is installed at the design position of one small unit according to a drawing; s6, the one-truss small unit is hoisted, and the one-truss small unit is hoisted to the installed steel support on the roof steel frame; s7, connecting the small unit with the steel support after re-checking; and S8, the step S6 and the s |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117926978A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117926978A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117926978A3</originalsourceid><addsrcrecordid>eNrjZFBzS0wqykxOLElNUUjOL8rLTE4F0nnFJUWlySWZ-XkKuaklGfkpPAysaYk5xam8UJqbQdHNNcTZQze1ID8-tbggMTk1L7Uk3tnP0NDc0sjM0tzC0ZgYNQCUCygF</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Fabricated cornice construction method</title><source>esp@cenet</source><creator>ZHANG TAOTAO ; XU JIAHAO ; ZHENG YANLAI ; MA YI ; TAN KA ; LIAO XIAOSONG ; DAI QINGQIN ; ZHOU WU ; WU GANG</creator><creatorcontrib>ZHANG TAOTAO ; XU JIAHAO ; ZHENG YANLAI ; MA YI ; TAN KA ; LIAO XIAOSONG ; DAI QINGQIN ; ZHOU WU ; WU GANG</creatorcontrib><description>An assembly type cornice construction method specifically comprises the following steps of S1, surveying and setting out, S2, dividing keels in the length direction of a cornice body according to the cornice surveying and setting out condition, S3, arranging a machining area on the site ground, machining a single-frame framework in the machining area according to the design in the step S2, and then according to the maximum lifting capacity of a tower crane, conducting construction on the single-frame framework according to the design in the step S2. Processing a plurality of single-frame frameworks into a small-frame unit according to a drawing; s3, aluminum plate processing; s5, the aluminum plate is installed at the design position of one small unit according to a drawing; s6, the one-truss small unit is hoisted, and the one-truss small unit is hoisted to the installed steel support on the roof steel frame; s7, connecting the small unit with the steel support after re-checking; and S8, the step S6 and the s</description><language>chi ; eng</language><subject>BUILDING ; FIXED CONSTRUCTIONS ; GUTTERS ; ROOF COVERINGS ; ROOF-WORKING TOOLS ; SKY-LIGHTS</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240426&DB=EPODOC&CC=CN&NR=117926978A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76294</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240426&DB=EPODOC&CC=CN&NR=117926978A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG TAOTAO</creatorcontrib><creatorcontrib>XU JIAHAO</creatorcontrib><creatorcontrib>ZHENG YANLAI</creatorcontrib><creatorcontrib>MA YI</creatorcontrib><creatorcontrib>TAN KA</creatorcontrib><creatorcontrib>LIAO XIAOSONG</creatorcontrib><creatorcontrib>DAI QINGQIN</creatorcontrib><creatorcontrib>ZHOU WU</creatorcontrib><creatorcontrib>WU GANG</creatorcontrib><title>Fabricated cornice construction method</title><description>An assembly type cornice construction method specifically comprises the following steps of S1, surveying and setting out, S2, dividing keels in the length direction of a cornice body according to the cornice surveying and setting out condition, S3, arranging a machining area on the site ground, machining a single-frame framework in the machining area according to the design in the step S2, and then according to the maximum lifting capacity of a tower crane, conducting construction on the single-frame framework according to the design in the step S2. Processing a plurality of single-frame frameworks into a small-frame unit according to a drawing; s3, aluminum plate processing; s5, the aluminum plate is installed at the design position of one small unit according to a drawing; s6, the one-truss small unit is hoisted, and the one-truss small unit is hoisted to the installed steel support on the roof steel frame; s7, connecting the small unit with the steel support after re-checking; and S8, the step S6 and the s</description><subject>BUILDING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GUTTERS</subject><subject>ROOF COVERINGS</subject><subject>ROOF-WORKING TOOLS</subject><subject>SKY-LIGHTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFBzS0wqykxOLElNUUjOL8rLTE4F0nnFJUWlySWZ-XkKuaklGfkpPAysaYk5xam8UJqbQdHNNcTZQze1ID8-tbggMTk1L7Uk3tnP0NDc0sjM0tzC0ZgYNQCUCygF</recordid><startdate>20240426</startdate><enddate>20240426</enddate><creator>ZHANG TAOTAO</creator><creator>XU JIAHAO</creator><creator>ZHENG YANLAI</creator><creator>MA YI</creator><creator>TAN KA</creator><creator>LIAO XIAOSONG</creator><creator>DAI QINGQIN</creator><creator>ZHOU WU</creator><creator>WU GANG</creator><scope>EVB</scope></search><sort><creationdate>20240426</creationdate><title>Fabricated cornice construction method</title><author>ZHANG TAOTAO ; XU JIAHAO ; ZHENG YANLAI ; MA YI ; TAN KA ; LIAO XIAOSONG ; DAI QINGQIN ; ZHOU WU ; WU GANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117926978A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>BUILDING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GUTTERS</topic><topic>ROOF COVERINGS</topic><topic>ROOF-WORKING TOOLS</topic><topic>SKY-LIGHTS</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG TAOTAO</creatorcontrib><creatorcontrib>XU JIAHAO</creatorcontrib><creatorcontrib>ZHENG YANLAI</creatorcontrib><creatorcontrib>MA YI</creatorcontrib><creatorcontrib>TAN KA</creatorcontrib><creatorcontrib>LIAO XIAOSONG</creatorcontrib><creatorcontrib>DAI QINGQIN</creatorcontrib><creatorcontrib>ZHOU WU</creatorcontrib><creatorcontrib>WU GANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG TAOTAO</au><au>XU JIAHAO</au><au>ZHENG YANLAI</au><au>MA YI</au><au>TAN KA</au><au>LIAO XIAOSONG</au><au>DAI QINGQIN</au><au>ZHOU WU</au><au>WU GANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Fabricated cornice construction method</title><date>2024-04-26</date><risdate>2024</risdate><abstract>An assembly type cornice construction method specifically comprises the following steps of S1, surveying and setting out, S2, dividing keels in the length direction of a cornice body according to the cornice surveying and setting out condition, S3, arranging a machining area on the site ground, machining a single-frame framework in the machining area according to the design in the step S2, and then according to the maximum lifting capacity of a tower crane, conducting construction on the single-frame framework according to the design in the step S2. Processing a plurality of single-frame frameworks into a small-frame unit according to a drawing; s3, aluminum plate processing; s5, the aluminum plate is installed at the design position of one small unit according to a drawing; s6, the one-truss small unit is hoisted, and the one-truss small unit is hoisted to the installed steel support on the roof steel frame; s7, connecting the small unit with the steel support after re-checking; and S8, the step S6 and the s</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN117926978A |
source | esp@cenet |
subjects | BUILDING FIXED CONSTRUCTIONS GUTTERS ROOF COVERINGS ROOF-WORKING TOOLS SKY-LIGHTS |
title | Fabricated cornice construction method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-22T19%3A41%3A26IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20TAOTAO&rft.date=2024-04-26&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117926978A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |