Sludge layer pile foundation settlement monitoring device
The invention discloses a silt layer pile foundation settlement monitoring device which comprises a signal processor, a pulse generator, a transmitter, a transmitting antenna, an electromagnetic wave reflection detection object, a receiving antenna, a receiver and a displayer. Signals sent by the si...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | YUAN ZHANWU LI CHANGQING ZHANG HUILING ZHOU YAO SUN XINRU |
description | The invention discloses a silt layer pile foundation settlement monitoring device which comprises a signal processor, a pulse generator, a transmitter, a transmitting antenna, an electromagnetic wave reflection detection object, a receiving antenna, a receiver and a displayer. Signals sent by the signal processor are transmitted to the input end of the pulse generator through the output end, pulses sent by the pulse generator are transmitted to the input end of the transmitter through the output end, electromagnetic wave signals generated by the transmitter are transmitted to the transmitting antenna through the output end, and the transmitting antenna and the receiving antenna are arranged on the pile top of a pile foundation. Electromagnetic wave reflectors are preset on the pile foundation in a segmented mode to serve as monitoring positions; the receiving antenna transmits received reflected electromagnetic waves to the input end of the receiver through the output end, the receiver converts received elect |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117905121A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117905121A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117905121A3</originalsourceid><addsrcrecordid>eNrjZLAMzilNSU9VyEmsTC1SKMjMSVVIyy_NS0ksyczPUyhOLSnJSc1NzStRyM3PyyzJL8rMS1dISS3LTE7lYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhuaWBqaGRoaOxsSoAQB9Gi8z</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Sludge layer pile foundation settlement monitoring device</title><source>esp@cenet</source><creator>YUAN ZHANWU ; LI CHANGQING ; ZHANG HUILING ; ZHOU YAO ; SUN XINRU</creator><creatorcontrib>YUAN ZHANWU ; LI CHANGQING ; ZHANG HUILING ; ZHOU YAO ; SUN XINRU</creatorcontrib><description>The invention discloses a silt layer pile foundation settlement monitoring device which comprises a signal processor, a pulse generator, a transmitter, a transmitting antenna, an electromagnetic wave reflection detection object, a receiving antenna, a receiver and a displayer. Signals sent by the signal processor are transmitted to the input end of the pulse generator through the output end, pulses sent by the pulse generator are transmitted to the input end of the transmitter through the output end, electromagnetic wave signals generated by the transmitter are transmitted to the transmitting antenna through the output end, and the transmitting antenna and the receiving antenna are arranged on the pile top of a pile foundation. Electromagnetic wave reflectors are preset on the pile foundation in a segmented mode to serve as monitoring positions; the receiving antenna transmits received reflected electromagnetic waves to the input end of the receiver through the output end, the receiver converts received elect</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; GYROSCOPIC INSTRUMENTS ; HYDRAULIC ENGINEERING ; MEASURING ; MEASURING DISTANCES, LEVELS OR BEARINGS ; NAVIGATION ; PHOTOGRAMMETRY OR VIDEOGRAMMETRY ; PHYSICS ; SOIL SHIFTING ; SURVEYING ; TESTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240419&DB=EPODOC&CC=CN&NR=117905121A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240419&DB=EPODOC&CC=CN&NR=117905121A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YUAN ZHANWU</creatorcontrib><creatorcontrib>LI CHANGQING</creatorcontrib><creatorcontrib>ZHANG HUILING</creatorcontrib><creatorcontrib>ZHOU YAO</creatorcontrib><creatorcontrib>SUN XINRU</creatorcontrib><title>Sludge layer pile foundation settlement monitoring device</title><description>The invention discloses a silt layer pile foundation settlement monitoring device which comprises a signal processor, a pulse generator, a transmitter, a transmitting antenna, an electromagnetic wave reflection detection object, a receiving antenna, a receiver and a displayer. Signals sent by the signal processor are transmitted to the input end of the pulse generator through the output end, pulses sent by the pulse generator are transmitted to the input end of the transmitter through the output end, electromagnetic wave signals generated by the transmitter are transmitted to the transmitting antenna through the output end, and the transmitting antenna and the receiving antenna are arranged on the pile top of a pile foundation. Electromagnetic wave reflectors are preset on the pile foundation in a segmented mode to serve as monitoring positions; the receiving antenna transmits received reflected electromagnetic waves to the input end of the receiver through the output end, the receiver converts received elect</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>GYROSCOPIC INSTRUMENTS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>MEASURING</subject><subject>MEASURING DISTANCES, LEVELS OR BEARINGS</subject><subject>NAVIGATION</subject><subject>PHOTOGRAMMETRY OR VIDEOGRAMMETRY</subject><subject>PHYSICS</subject><subject>SOIL SHIFTING</subject><subject>SURVEYING</subject><subject>TESTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLAMzilNSU9VyEmsTC1SKMjMSVVIyy_NS0ksyczPUyhOLSnJSc1NzStRyM3PyyzJL8rMS1dISS3LTE7lYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhuaWBqaGRoaOxsSoAQB9Gi8z</recordid><startdate>20240419</startdate><enddate>20240419</enddate><creator>YUAN ZHANWU</creator><creator>LI CHANGQING</creator><creator>ZHANG HUILING</creator><creator>ZHOU YAO</creator><creator>SUN XINRU</creator><scope>EVB</scope></search><sort><creationdate>20240419</creationdate><title>Sludge layer pile foundation settlement monitoring device</title><author>YUAN ZHANWU ; LI CHANGQING ; ZHANG HUILING ; ZHOU YAO ; SUN XINRU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117905121A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>GYROSCOPIC INSTRUMENTS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>MEASURING</topic><topic>MEASURING DISTANCES, LEVELS OR BEARINGS</topic><topic>NAVIGATION</topic><topic>PHOTOGRAMMETRY OR VIDEOGRAMMETRY</topic><topic>PHYSICS</topic><topic>SOIL SHIFTING</topic><topic>SURVEYING</topic><topic>TESTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>YUAN ZHANWU</creatorcontrib><creatorcontrib>LI CHANGQING</creatorcontrib><creatorcontrib>ZHANG HUILING</creatorcontrib><creatorcontrib>ZHOU YAO</creatorcontrib><creatorcontrib>SUN XINRU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YUAN ZHANWU</au><au>LI CHANGQING</au><au>ZHANG HUILING</au><au>ZHOU YAO</au><au>SUN XINRU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Sludge layer pile foundation settlement monitoring device</title><date>2024-04-19</date><risdate>2024</risdate><abstract>The invention discloses a silt layer pile foundation settlement monitoring device which comprises a signal processor, a pulse generator, a transmitter, a transmitting antenna, an electromagnetic wave reflection detection object, a receiving antenna, a receiver and a displayer. Signals sent by the signal processor are transmitted to the input end of the pulse generator through the output end, pulses sent by the pulse generator are transmitted to the input end of the transmitter through the output end, electromagnetic wave signals generated by the transmitter are transmitted to the transmitting antenna through the output end, and the transmitting antenna and the receiving antenna are arranged on the pile top of a pile foundation. Electromagnetic wave reflectors are preset on the pile foundation in a segmented mode to serve as monitoring positions; the receiving antenna transmits received reflected electromagnetic waves to the input end of the receiver through the output end, the receiver converts received elect</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN117905121A |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS GYROSCOPIC INSTRUMENTS HYDRAULIC ENGINEERING MEASURING MEASURING DISTANCES, LEVELS OR BEARINGS NAVIGATION PHOTOGRAMMETRY OR VIDEOGRAMMETRY PHYSICS SOIL SHIFTING SURVEYING TESTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Sludge layer pile foundation settlement monitoring device |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-25T13%3A40%3A43IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YUAN%20ZHANWU&rft.date=2024-04-19&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117905121A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |