Risk identification method and device for building construction progress, equipment and medium

The invention discloses a risk identification method and device for a building construction progress, equipment and a medium, and the method comprises the steps: obtaining a target building and a building construction project where the target building is located, determining a required construction...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LI SIJIE, YU CHIFEI, LI HUILI, GUO XUZHAO, YANG SHUAI, YANG CAN, FENG XUE
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a risk identification method and device for a building construction progress, equipment and a medium, and the method comprises the steps: obtaining a target building and a building construction project where the target building is located, determining a required construction period of the target building, and obtaining a risk identification result of the target building; the required construction period represents time required for completing construction of uncompleted floors in the target building; obtaining the maximum construction period and the minimum construction period of a standard floor in the N buildings; comparing the required construction period of the target building with the maximum construction period of the standard floor and the minimum construction period of the standard floor, and determining a risk level of progress construction of the target building according to a comparison result; and displaying the target building and the risk level of the target building. Acc