Temporary counterweight control method and system for concrete bridge cantilever closure construction

The invention relates to the technical field of bridge construction, in particular to a temporary counterweight control method and system for concrete bridge cantilever closure construction. Comprising the following steps that S1, the mass of a counter weight is determined according to the weight of...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHU JINZHU, HE JING, HUANG GANLE, ZHENG JIANXIN, MU WENJUN, HUANG CAN, SUN NANCHANG, LYU XINRUI, LIAO WANCHENG, ZHOU HAO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to the technical field of bridge construction, in particular to a temporary counterweight control method and system for concrete bridge cantilever closure construction. Comprising the following steps that S1, the mass of a counter weight is determined according to the weight of a closure section, and the counter weight with the adjusted mass is hoisted to the position of a main pier on a main beam; s2, a counter weight is driven to move to the cantilever end of the main beam from the main pier in the bridge direction; and S3, closure section concrete is poured, the counter weight is driven to move towards one side of the main pier in the bridge direction according to the concrete pouring condition, and the deflection of the cantilever end of the main beam is kept unchanged all the time till closure section construction is completed. The concrete bridge cantilever closure construction temporary counterweight mode is very simple, the deflection of the cantilever end of the main beam is con