Work order scheduling method
The invention discloses a work order scheduling method. The method comprises the following steps: acquiring image data and operation sound data of power equipment from a power monitoring system; processing the image data and the operation sound data to obtain a fault type evaluation result of the po...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a work order scheduling method. The method comprises the following steps: acquiring image data and operation sound data of power equipment from a power monitoring system; processing the image data and the operation sound data to obtain a fault type evaluation result of the power equipment; and obtaining maintenance personnel information from the power monitoring system, and allocating a work order based on the maintenance personnel information and the fault type evaluation result. The technical problem that work order scheduling is not achieved according to the actual situation of the power operation site in the prior art, and scheduling is unreasonable is solved.
本申请公开了一种工单调度方法,包括:从电力监控系统获取电力设备的图像数据和运行声音数据;对图像数据和运行声音数据进行处理,得到电力设备的故障类型评估结果;从电力监控系统获取维修人员信息,并基于维修人员信息和故障类型评估结果分配工单。本申请改善了现有技术没有根据电力作业现场的实际情况来实现工单调度,存在调度不合理的技术问题。 |
---|