Construction hoist wall attaching frame and mounting method thereof

The invention belongs to the technical field of building construction machinery, and particularly relates to a building hoist wall attaching frame and an installation method thereof.The installation method comprises the following steps that S1, bolt holes in a guide rail frame are used for positioni...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WAN LICHENG, YU TING, XIE YONGFEI, LI XUBIN, LI QI, FU XINGZHONG, WANG BINGHUI, ZHANG WEI, GAO LELE, YUN ZHONGYU
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WAN LICHENG
YU TING
XIE YONGFEI
LI XUBIN
LI QI
FU XINGZHONG
WANG BINGHUI
ZHANG WEI
GAO LELE
YUN ZHONGYU
description The invention belongs to the technical field of building construction machinery, and particularly relates to a building hoist wall attaching frame and an installation method thereof.The installation method comprises the following steps that S1, bolt holes in a guide rail frame are used for positioning, and a front small frame is fixed to the guide rail frame through bolts; s2, a middle wall attaching frame body, a rear wall attaching frame and a rear wall attaching foot are sequentially installed, and the rear wall attaching foot is installed on a floor and fastened through an M20 bolt, a gasket and double nuts; and S3, the distance between the guide rail frame and the rear attached wall foot is adjusted, the rear attached wall foot is properly moved to adjust the perpendicularity of the guide rail frame, and the adjusting bolt is fastened after adjustment. 本发明属于建筑施工机械技术领域,具体的说是一种施工升降机附墙架及其安装方法,该安装方法如下:S1:以导轨架上的螺栓孔定位,用螺栓将前小架固定在导轨架上;S2:依次安装中附墙架本体、后附墙架和后附墙脚,将后附墙脚安装在楼板上,用M20螺栓、垫片及双螺母紧固进行;S3:调整导轨架与后附墙脚之间的距离,适当移动后
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117775924A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117775924A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117775924A3</originalsourceid><addsrcrecordid>eNrjZHB2zs8rLikqTS7JzM9TyMjPLC5RKE_MyVFILClJTM7IzEtXSCtKzE1VSMxLUcjNL80rAQnlppZk5KcolGSkFqXmp_EwsKYl5hSn8kJpbgZFN9cQZw_d1IL8-NTigsTk1LzUknhnP0NDc3NzU0sjE0djYtQAALisMvI</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction hoist wall attaching frame and mounting method thereof</title><source>esp@cenet</source><creator>WAN LICHENG ; YU TING ; XIE YONGFEI ; LI XUBIN ; LI QI ; FU XINGZHONG ; WANG BINGHUI ; ZHANG WEI ; GAO LELE ; YUN ZHONGYU</creator><creatorcontrib>WAN LICHENG ; YU TING ; XIE YONGFEI ; LI XUBIN ; LI QI ; FU XINGZHONG ; WANG BINGHUI ; ZHANG WEI ; GAO LELE ; YUN ZHONGYU</creatorcontrib><description>The invention belongs to the technical field of building construction machinery, and particularly relates to a building hoist wall attaching frame and an installation method thereof.The installation method comprises the following steps that S1, bolt holes in a guide rail frame are used for positioning, and a front small frame is fixed to the guide rail frame through bolts; s2, a middle wall attaching frame body, a rear wall attaching frame and a rear wall attaching foot are sequentially installed, and the rear wall attaching foot is installed on a floor and fastened through an M20 bolt, a gasket and double nuts; and S3, the distance between the guide rail frame and the rear attached wall foot is adjusted, the rear attached wall foot is properly moved to adjust the perpendicularity of the guide rail frame, and the adjusting bolt is fastened after adjustment. 本发明属于建筑施工机械技术领域,具体的说是一种施工升降机附墙架及其安装方法,该安装方法如下:S1:以导轨架上的螺栓孔定位,用螺栓将前小架固定在导轨架上;S2:依次安装中附墙架本体、后附墙架和后附墙脚,将后附墙脚安装在楼板上,用M20螺栓、垫片及双螺母紧固进行;S3:调整导轨架与后附墙脚之间的距离,适当移动后</description><language>chi ; eng</language><subject>BLASTING ; DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS ORMACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS,CLIPS, WEDGES, JOINTS OR JOINTING ; ELEVATORS ; ENGINEERING ELEMENTS AND UNITS ; ESCALATORS OR MOVING WALKWAYS ; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS ; HAULING ; HEATING ; HOISTING ; LIFTING ; LIGHTING ; MECHANICAL ENGINEERING ; PERFORMING OPERATIONS ; THERMAL INSULATION IN GENERAL ; TRANSPORTING ; WEAPONS</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240329&amp;DB=EPODOC&amp;CC=CN&amp;NR=117775924A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240329&amp;DB=EPODOC&amp;CC=CN&amp;NR=117775924A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WAN LICHENG</creatorcontrib><creatorcontrib>YU TING</creatorcontrib><creatorcontrib>XIE YONGFEI</creatorcontrib><creatorcontrib>LI XUBIN</creatorcontrib><creatorcontrib>LI QI</creatorcontrib><creatorcontrib>FU XINGZHONG</creatorcontrib><creatorcontrib>WANG BINGHUI</creatorcontrib><creatorcontrib>ZHANG WEI</creatorcontrib><creatorcontrib>GAO LELE</creatorcontrib><creatorcontrib>YUN ZHONGYU</creatorcontrib><title>Construction hoist wall attaching frame and mounting method thereof</title><description>The invention belongs to the technical field of building construction machinery, and particularly relates to a building hoist wall attaching frame and an installation method thereof.The installation method comprises the following steps that S1, bolt holes in a guide rail frame are used for positioning, and a front small frame is fixed to the guide rail frame through bolts; s2, a middle wall attaching frame body, a rear wall attaching frame and a rear wall attaching foot are sequentially installed, and the rear wall attaching foot is installed on a floor and fastened through an M20 bolt, a gasket and double nuts; and S3, the distance between the guide rail frame and the rear attached wall foot is adjusted, the rear attached wall foot is properly moved to adjust the perpendicularity of the guide rail frame, and the adjusting bolt is fastened after adjustment. 本发明属于建筑施工机械技术领域,具体的说是一种施工升降机附墙架及其安装方法,该安装方法如下:S1:以导轨架上的螺栓孔定位,用螺栓将前小架固定在导轨架上;S2:依次安装中附墙架本体、后附墙架和后附墙脚,将后附墙脚安装在楼板上,用M20螺栓、垫片及双螺母紧固进行;S3:调整导轨架与后附墙脚之间的距离,适当移动后</description><subject>BLASTING</subject><subject>DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS ORMACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS,CLIPS, WEDGES, JOINTS OR JOINTING</subject><subject>ELEVATORS</subject><subject>ENGINEERING ELEMENTS AND UNITS</subject><subject>ESCALATORS OR MOVING WALKWAYS</subject><subject>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</subject><subject>HAULING</subject><subject>HEATING</subject><subject>HOISTING</subject><subject>LIFTING</subject><subject>LIGHTING</subject><subject>MECHANICAL ENGINEERING</subject><subject>PERFORMING OPERATIONS</subject><subject>THERMAL INSULATION IN GENERAL</subject><subject>TRANSPORTING</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHB2zs8rLikqTS7JzM9TyMjPLC5RKE_MyVFILClJTM7IzEtXSCtKzE1VSMxLUcjNL80rAQnlppZk5KcolGSkFqXmp_EwsKYl5hSn8kJpbgZFN9cQZw_d1IL8-NTigsTk1LzUknhnP0NDc3NzU0sjE0djYtQAALisMvI</recordid><startdate>20240329</startdate><enddate>20240329</enddate><creator>WAN LICHENG</creator><creator>YU TING</creator><creator>XIE YONGFEI</creator><creator>LI XUBIN</creator><creator>LI QI</creator><creator>FU XINGZHONG</creator><creator>WANG BINGHUI</creator><creator>ZHANG WEI</creator><creator>GAO LELE</creator><creator>YUN ZHONGYU</creator><scope>EVB</scope></search><sort><creationdate>20240329</creationdate><title>Construction hoist wall attaching frame and mounting method thereof</title><author>WAN LICHENG ; YU TING ; XIE YONGFEI ; LI XUBIN ; LI QI ; FU XINGZHONG ; WANG BINGHUI ; ZHANG WEI ; GAO LELE ; YUN ZHONGYU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117775924A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>BLASTING</topic><topic>DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS ORMACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS,CLIPS, WEDGES, JOINTS OR JOINTING</topic><topic>ELEVATORS</topic><topic>ENGINEERING ELEMENTS AND UNITS</topic><topic>ESCALATORS OR MOVING WALKWAYS</topic><topic>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</topic><topic>HAULING</topic><topic>HEATING</topic><topic>HOISTING</topic><topic>LIFTING</topic><topic>LIGHTING</topic><topic>MECHANICAL ENGINEERING</topic><topic>PERFORMING OPERATIONS</topic><topic>THERMAL INSULATION IN GENERAL</topic><topic>TRANSPORTING</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>WAN LICHENG</creatorcontrib><creatorcontrib>YU TING</creatorcontrib><creatorcontrib>XIE YONGFEI</creatorcontrib><creatorcontrib>LI XUBIN</creatorcontrib><creatorcontrib>LI QI</creatorcontrib><creatorcontrib>FU XINGZHONG</creatorcontrib><creatorcontrib>WANG BINGHUI</creatorcontrib><creatorcontrib>ZHANG WEI</creatorcontrib><creatorcontrib>GAO LELE</creatorcontrib><creatorcontrib>YUN ZHONGYU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WAN LICHENG</au><au>YU TING</au><au>XIE YONGFEI</au><au>LI XUBIN</au><au>LI QI</au><au>FU XINGZHONG</au><au>WANG BINGHUI</au><au>ZHANG WEI</au><au>GAO LELE</au><au>YUN ZHONGYU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction hoist wall attaching frame and mounting method thereof</title><date>2024-03-29</date><risdate>2024</risdate><abstract>The invention belongs to the technical field of building construction machinery, and particularly relates to a building hoist wall attaching frame and an installation method thereof.The installation method comprises the following steps that S1, bolt holes in a guide rail frame are used for positioning, and a front small frame is fixed to the guide rail frame through bolts; s2, a middle wall attaching frame body, a rear wall attaching frame and a rear wall attaching foot are sequentially installed, and the rear wall attaching foot is installed on a floor and fastened through an M20 bolt, a gasket and double nuts; and S3, the distance between the guide rail frame and the rear attached wall foot is adjusted, the rear attached wall foot is properly moved to adjust the perpendicularity of the guide rail frame, and the adjusting bolt is fastened after adjustment. 本发明属于建筑施工机械技术领域,具体的说是一种施工升降机附墙架及其安装方法,该安装方法如下:S1:以导轨架上的螺栓孔定位,用螺栓将前小架固定在导轨架上;S2:依次安装中附墙架本体、后附墙架和后附墙脚,将后附墙脚安装在楼板上,用M20螺栓、垫片及双螺母紧固进行;S3:调整导轨架与后附墙脚之间的距离,适当移动后</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN117775924A
source esp@cenet
subjects BLASTING
DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS ORMACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS,CLIPS, WEDGES, JOINTS OR JOINTING
ELEVATORS
ENGINEERING ELEMENTS AND UNITS
ESCALATORS OR MOVING WALKWAYS
GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS
HAULING
HEATING
HOISTING
LIFTING
LIGHTING
MECHANICAL ENGINEERING
PERFORMING OPERATIONS
THERMAL INSULATION IN GENERAL
TRANSPORTING
WEAPONS
title Construction hoist wall attaching frame and mounting method thereof
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-24T18%3A36%3A58IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WAN%20LICHENG&rft.date=2024-03-29&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117775924A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true