Construction hoist wall attaching frame and mounting method thereof

The invention belongs to the technical field of building construction machinery, and particularly relates to a building hoist wall attaching frame and an installation method thereof.The installation method comprises the following steps that S1, bolt holes in a guide rail frame are used for positioni...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WAN LICHENG, YU TING, XIE YONGFEI, LI XUBIN, LI QI, FU XINGZHONG, WANG BINGHUI, ZHANG WEI, GAO LELE, YUN ZHONGYU
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention belongs to the technical field of building construction machinery, and particularly relates to a building hoist wall attaching frame and an installation method thereof.The installation method comprises the following steps that S1, bolt holes in a guide rail frame are used for positioning, and a front small frame is fixed to the guide rail frame through bolts; s2, a middle wall attaching frame body, a rear wall attaching frame and a rear wall attaching foot are sequentially installed, and the rear wall attaching foot is installed on a floor and fastened through an M20 bolt, a gasket and double nuts; and S3, the distance between the guide rail frame and the rear attached wall foot is adjusted, the rear attached wall foot is properly moved to adjust the perpendicularity of the guide rail frame, and the adjusting bolt is fastened after adjustment. 本发明属于建筑施工机械技术领域,具体的说是一种施工升降机附墙架及其安装方法,该安装方法如下:S1:以导轨架上的螺栓孔定位,用螺栓将前小架固定在导轨架上;S2:依次安装中附墙架本体、后附墙架和后附墙脚,将后附墙脚安装在楼板上,用M20螺栓、垫片及双螺母紧固进行;S3:调整导轨架与后附墙脚之间的距离,适当移动后