Three-dimensional visual tower crane operation early warning method, system and equipment and storage medium

The invention provides a three-dimensional visual tower crane operation early warning method, system and equipment and a storage medium, and relates to the technical field of constructional engineering. By constructing the three-dimensional visual model of the engineering area, the three-dimensional...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: GUO YANG, ZHANG PENG, LIN HAOYANG, GUO TAO, BAN PINCHENG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator GUO YANG
ZHANG PENG
LIN HAOYANG
GUO TAO
BAN PINCHENG
description The invention provides a three-dimensional visual tower crane operation early warning method, system and equipment and a storage medium, and relates to the technical field of constructional engineering. By constructing the three-dimensional visual model of the engineering area, the three-dimensional space information of the engineering area is fully displayed, and a visual space basis is provided for determining the influence range of the tower crane. The operation data and the environment data of the tower crane are obtained, the physical engine is used for predicting the operation track of the tower crane object, the overall trend of the movement of the tower crane can be dynamically simulated, and the operation state of the tower crane can be accurately grasped. And the spatial relationship between the tower crane and surrounding facilities is accurately judged by combining tower crane influence range parameters determined by a three-dimensional visual model, so that a target early warning range is determi
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117765181A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117765181A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117765181A3</originalsourceid><addsrcrecordid>eNqNjL0KwjAYRbs4iPoOn7sdgmi7SlGcnLqXj-baBvJnklr69gbxAZwOh3u460K3YwBKqQxsVM6ypreKU0ZyMwL1gS3IeQROeSZw0AvNHKyyAxmk0ckDxSUmGGIrCa9J-XyWvhaTCzwgh1JNZlusnqwjdj9uiv3t2jb3Et51iJ57WKSueQhRVeeTqMXl-E_zAYP7Qm0</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Three-dimensional visual tower crane operation early warning method, system and equipment and storage medium</title><source>esp@cenet</source><creator>GUO YANG ; ZHANG PENG ; LIN HAOYANG ; GUO TAO ; BAN PINCHENG</creator><creatorcontrib>GUO YANG ; ZHANG PENG ; LIN HAOYANG ; GUO TAO ; BAN PINCHENG</creatorcontrib><description>The invention provides a three-dimensional visual tower crane operation early warning method, system and equipment and a storage medium, and relates to the technical field of constructional engineering. By constructing the three-dimensional visual model of the engineering area, the three-dimensional space information of the engineering area is fully displayed, and a visual space basis is provided for determining the influence range of the tower crane. The operation data and the environment data of the tower crane are obtained, the physical engine is used for predicting the operation track of the tower crane object, the overall trend of the movement of the tower crane can be dynamically simulated, and the operation state of the tower crane can be accurately grasped. And the spatial relationship between the tower crane and surrounding facilities is accurately judged by combining tower crane influence range parameters determined by a three-dimensional visual model, so that a target early warning range is determi</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; IMAGE DATA PROCESSING OR GENERATION, IN GENERAL ; PHYSICS</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240326&amp;DB=EPODOC&amp;CC=CN&amp;NR=117765181A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76516</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240326&amp;DB=EPODOC&amp;CC=CN&amp;NR=117765181A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>GUO YANG</creatorcontrib><creatorcontrib>ZHANG PENG</creatorcontrib><creatorcontrib>LIN HAOYANG</creatorcontrib><creatorcontrib>GUO TAO</creatorcontrib><creatorcontrib>BAN PINCHENG</creatorcontrib><title>Three-dimensional visual tower crane operation early warning method, system and equipment and storage medium</title><description>The invention provides a three-dimensional visual tower crane operation early warning method, system and equipment and a storage medium, and relates to the technical field of constructional engineering. By constructing the three-dimensional visual model of the engineering area, the three-dimensional space information of the engineering area is fully displayed, and a visual space basis is provided for determining the influence range of the tower crane. The operation data and the environment data of the tower crane are obtained, the physical engine is used for predicting the operation track of the tower crane object, the overall trend of the movement of the tower crane can be dynamically simulated, and the operation state of the tower crane can be accurately grasped. And the spatial relationship between the tower crane and surrounding facilities is accurately judged by combining tower crane influence range parameters determined by a three-dimensional visual model, so that a target early warning range is determi</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>IMAGE DATA PROCESSING OR GENERATION, IN GENERAL</subject><subject>PHYSICS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjL0KwjAYRbs4iPoOn7sdgmi7SlGcnLqXj-baBvJnklr69gbxAZwOh3u460K3YwBKqQxsVM6ypreKU0ZyMwL1gS3IeQROeSZw0AvNHKyyAxmk0ckDxSUmGGIrCa9J-XyWvhaTCzwgh1JNZlusnqwjdj9uiv3t2jb3Et51iJ57WKSueQhRVeeTqMXl-E_zAYP7Qm0</recordid><startdate>20240326</startdate><enddate>20240326</enddate><creator>GUO YANG</creator><creator>ZHANG PENG</creator><creator>LIN HAOYANG</creator><creator>GUO TAO</creator><creator>BAN PINCHENG</creator><scope>EVB</scope></search><sort><creationdate>20240326</creationdate><title>Three-dimensional visual tower crane operation early warning method, system and equipment and storage medium</title><author>GUO YANG ; ZHANG PENG ; LIN HAOYANG ; GUO TAO ; BAN PINCHENG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117765181A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>IMAGE DATA PROCESSING OR GENERATION, IN GENERAL</topic><topic>PHYSICS</topic><toplevel>online_resources</toplevel><creatorcontrib>GUO YANG</creatorcontrib><creatorcontrib>ZHANG PENG</creatorcontrib><creatorcontrib>LIN HAOYANG</creatorcontrib><creatorcontrib>GUO TAO</creatorcontrib><creatorcontrib>BAN PINCHENG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>GUO YANG</au><au>ZHANG PENG</au><au>LIN HAOYANG</au><au>GUO TAO</au><au>BAN PINCHENG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Three-dimensional visual tower crane operation early warning method, system and equipment and storage medium</title><date>2024-03-26</date><risdate>2024</risdate><abstract>The invention provides a three-dimensional visual tower crane operation early warning method, system and equipment and a storage medium, and relates to the technical field of constructional engineering. By constructing the three-dimensional visual model of the engineering area, the three-dimensional space information of the engineering area is fully displayed, and a visual space basis is provided for determining the influence range of the tower crane. The operation data and the environment data of the tower crane are obtained, the physical engine is used for predicting the operation track of the tower crane object, the overall trend of the movement of the tower crane can be dynamically simulated, and the operation state of the tower crane can be accurately grasped. And the spatial relationship between the tower crane and surrounding facilities is accurately judged by combining tower crane influence range parameters determined by a three-dimensional visual model, so that a target early warning range is determi</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN117765181A
source esp@cenet
subjects CALCULATING
COMPUTING
COUNTING
IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
PHYSICS
title Three-dimensional visual tower crane operation early warning method, system and equipment and storage medium
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-13T08%3A46%3A20IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=GUO%20YANG&rft.date=2024-03-26&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117765181A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true