Integral jacking construction method for double-curved-surface large-span steel truss

The invention relates to an integral jacking construction method for a double-curved-surface large-span steel truss, which comprises the following steps of: (1) taking a simulation analysis theory as a basis, combining the integral characteristics of a double-layer upright quadrangular pyramid steel...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: GONG JINDE, FENG YUEHUI, LI JICHAO, WANG YUMING, CHEN YALI, XU SUHUAN, LUO SHUAI, CUI HONGLEI, CHENG JI, RAN MAOWANG, FENG JIHONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator GONG JINDE
FENG YUEHUI
LI JICHAO
WANG YUMING
CHEN YALI
XU SUHUAN
LUO SHUAI
CUI HONGLEI
CHENG JI
RAN MAOWANG
FENG JIHONG
description The invention relates to an integral jacking construction method for a double-curved-surface large-span steel truss, which comprises the following steps of: (1) taking a simulation analysis theory as a basis, combining the integral characteristics of a double-layer upright quadrangular pyramid steel truss, utilizing a supporting structure distribution form to provide a truss structure lifting point arrangement scheme, carrying out feasibility analysis on the scheme, determining an integral truss lifting scheme, and constructing a double-layer upright quadrangular pyramid steel truss lifting point arrangement scheme; a jacking point location is determined according to a model analysis calculation result; (2) jacking equipment is prepared; (3) surveying and setting out; (4) assembling on the ground; (5) jacking the net rack; and (6) the jacking equipment is dismantled, and installation is completed. According to the construction method, aloft work can be avoided, the engineering construction speed of the steel
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117758864A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117758864A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117758864A3</originalsourceid><addsrcrecordid>eNqNyzsSwiAURmEaC0fdw3UBFBkfSetkdLSx0jqD8EOiCBkuuH5TuACr03xnLu6XkOGS8vRU-jUERzoGzqnoPMRAb-Q-GrIxkYnl4SF1SR8YySVZpUFeJQfJowrEGfA0rcxLMbPKM1a_LsT6dLy1Z4kxdpi0RkDu2mtV1fWuafbbw-Yf8wUxzznp</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Integral jacking construction method for double-curved-surface large-span steel truss</title><source>esp@cenet</source><creator>GONG JINDE ; FENG YUEHUI ; LI JICHAO ; WANG YUMING ; CHEN YALI ; XU SUHUAN ; LUO SHUAI ; CUI HONGLEI ; CHENG JI ; RAN MAOWANG ; FENG JIHONG</creator><creatorcontrib>GONG JINDE ; FENG YUEHUI ; LI JICHAO ; WANG YUMING ; CHEN YALI ; XU SUHUAN ; LUO SHUAI ; CUI HONGLEI ; CHENG JI ; RAN MAOWANG ; FENG JIHONG</creatorcontrib><description>The invention relates to an integral jacking construction method for a double-curved-surface large-span steel truss, which comprises the following steps of: (1) taking a simulation analysis theory as a basis, combining the integral characteristics of a double-layer upright quadrangular pyramid steel truss, utilizing a supporting structure distribution form to provide a truss structure lifting point arrangement scheme, carrying out feasibility analysis on the scheme, determining an integral truss lifting scheme, and constructing a double-layer upright quadrangular pyramid steel truss lifting point arrangement scheme; a jacking point location is determined according to a model analysis calculation result; (2) jacking equipment is prepared; (3) surveying and setting out; (4) assembling on the ground; (5) jacking the net rack; and (6) the jacking equipment is dismantled, and installation is completed. According to the construction method, aloft work can be avoided, the engineering construction speed of the steel</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; CALCULATING ; CEILINGS ; COMPUTING ; COUNTING ; ELECTRIC DIGITAL DATA PROCESSING ; FIXED CONSTRUCTIONS ; FLOORS ; FORMS ; GENERAL BUILDING CONSTRUCTIONS ; HANDLING BUILDING MATERIALS ON THE SITE ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; PHYSICS ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; ROOFS ; SCAFFOLDING ; SHUTTERING ; WALLS, e.g. PARTITIONS</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240326&amp;DB=EPODOC&amp;CC=CN&amp;NR=117758864A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25569,76552</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240326&amp;DB=EPODOC&amp;CC=CN&amp;NR=117758864A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>GONG JINDE</creatorcontrib><creatorcontrib>FENG YUEHUI</creatorcontrib><creatorcontrib>LI JICHAO</creatorcontrib><creatorcontrib>WANG YUMING</creatorcontrib><creatorcontrib>CHEN YALI</creatorcontrib><creatorcontrib>XU SUHUAN</creatorcontrib><creatorcontrib>LUO SHUAI</creatorcontrib><creatorcontrib>CUI HONGLEI</creatorcontrib><creatorcontrib>CHENG JI</creatorcontrib><creatorcontrib>RAN MAOWANG</creatorcontrib><creatorcontrib>FENG JIHONG</creatorcontrib><title>Integral jacking construction method for double-curved-surface large-span steel truss</title><description>The invention relates to an integral jacking construction method for a double-curved-surface large-span steel truss, which comprises the following steps of: (1) taking a simulation analysis theory as a basis, combining the integral characteristics of a double-layer upright quadrangular pyramid steel truss, utilizing a supporting structure distribution form to provide a truss structure lifting point arrangement scheme, carrying out feasibility analysis on the scheme, determining an integral truss lifting scheme, and constructing a double-layer upright quadrangular pyramid steel truss lifting point arrangement scheme; a jacking point location is determined according to a model analysis calculation result; (2) jacking equipment is prepared; (3) surveying and setting out; (4) assembling on the ground; (5) jacking the net rack; and (6) the jacking equipment is dismantled, and installation is completed. According to the construction method, aloft work can be avoided, the engineering construction speed of the steel</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>CALCULATING</subject><subject>CEILINGS</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>ELECTRIC DIGITAL DATA PROCESSING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>FORMS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>PHYSICS</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>ROOFS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>WALLS, e.g. PARTITIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyzsSwiAURmEaC0fdw3UBFBkfSetkdLSx0jqD8EOiCBkuuH5TuACr03xnLu6XkOGS8vRU-jUERzoGzqnoPMRAb-Q-GrIxkYnl4SF1SR8YySVZpUFeJQfJowrEGfA0rcxLMbPKM1a_LsT6dLy1Z4kxdpi0RkDu2mtV1fWuafbbw-Yf8wUxzznp</recordid><startdate>20240326</startdate><enddate>20240326</enddate><creator>GONG JINDE</creator><creator>FENG YUEHUI</creator><creator>LI JICHAO</creator><creator>WANG YUMING</creator><creator>CHEN YALI</creator><creator>XU SUHUAN</creator><creator>LUO SHUAI</creator><creator>CUI HONGLEI</creator><creator>CHENG JI</creator><creator>RAN MAOWANG</creator><creator>FENG JIHONG</creator><scope>EVB</scope></search><sort><creationdate>20240326</creationdate><title>Integral jacking construction method for double-curved-surface large-span steel truss</title><author>GONG JINDE ; FENG YUEHUI ; LI JICHAO ; WANG YUMING ; CHEN YALI ; XU SUHUAN ; LUO SHUAI ; CUI HONGLEI ; CHENG JI ; RAN MAOWANG ; FENG JIHONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117758864A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>CALCULATING</topic><topic>CEILINGS</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>ELECTRIC DIGITAL DATA PROCESSING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>FORMS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>PHYSICS</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>ROOFS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>WALLS, e.g. PARTITIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>GONG JINDE</creatorcontrib><creatorcontrib>FENG YUEHUI</creatorcontrib><creatorcontrib>LI JICHAO</creatorcontrib><creatorcontrib>WANG YUMING</creatorcontrib><creatorcontrib>CHEN YALI</creatorcontrib><creatorcontrib>XU SUHUAN</creatorcontrib><creatorcontrib>LUO SHUAI</creatorcontrib><creatorcontrib>CUI HONGLEI</creatorcontrib><creatorcontrib>CHENG JI</creatorcontrib><creatorcontrib>RAN MAOWANG</creatorcontrib><creatorcontrib>FENG JIHONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>GONG JINDE</au><au>FENG YUEHUI</au><au>LI JICHAO</au><au>WANG YUMING</au><au>CHEN YALI</au><au>XU SUHUAN</au><au>LUO SHUAI</au><au>CUI HONGLEI</au><au>CHENG JI</au><au>RAN MAOWANG</au><au>FENG JIHONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Integral jacking construction method for double-curved-surface large-span steel truss</title><date>2024-03-26</date><risdate>2024</risdate><abstract>The invention relates to an integral jacking construction method for a double-curved-surface large-span steel truss, which comprises the following steps of: (1) taking a simulation analysis theory as a basis, combining the integral characteristics of a double-layer upright quadrangular pyramid steel truss, utilizing a supporting structure distribution form to provide a truss structure lifting point arrangement scheme, carrying out feasibility analysis on the scheme, determining an integral truss lifting scheme, and constructing a double-layer upright quadrangular pyramid steel truss lifting point arrangement scheme; a jacking point location is determined according to a model analysis calculation result; (2) jacking equipment is prepared; (3) surveying and setting out; (4) assembling on the ground; (5) jacking the net rack; and (6) the jacking equipment is dismantled, and installation is completed. According to the construction method, aloft work can be avoided, the engineering construction speed of the steel</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN117758864A
source esp@cenet
subjects BUILDING
BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE
CALCULATING
CEILINGS
COMPUTING
COUNTING
ELECTRIC DIGITAL DATA PROCESSING
FIXED CONSTRUCTIONS
FLOORS
FORMS
GENERAL BUILDING CONSTRUCTIONS
HANDLING BUILDING MATERIALS ON THE SITE
INSULATION OR OTHER PROTECTION OF BUILDINGS
PHYSICS
REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS
ROOFS
SCAFFOLDING
SHUTTERING
WALLS, e.g. PARTITIONS
title Integral jacking construction method for double-curved-surface large-span steel truss
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-13T23%3A42%3A12IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=GONG%20JINDE&rft.date=2024-03-26&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117758864A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true