Arch shell structure system with large middle opening and four floor corners and construction method of arch shell structure system
The invention discloses a large-middle-opening four-corner landing arch shell structure system and a construction method thereof.The large-middle-opening four-corner landing arch shell structure system comprises a plurality of pile foundations, a plurality of supports, a plurality of prestressed str...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHANG KAICHEN WANG LEI LIANG YUNDONG MAO ZHENLONG LI MING PENG BO YANG SONGLIN ZHANG HAIYAN XU ZHONGWEN YUAN LIPENG LIU WENTING HAO YUFENG REN QINGYING |
description | The invention discloses a large-middle-opening four-corner landing arch shell structure system and a construction method thereof.The large-middle-opening four-corner landing arch shell structure system comprises a plurality of pile foundations, a plurality of supports, a plurality of prestressed straining beams and an arch shell, all the supports are arranged on the corresponding pile foundations respectively, and all the prestressed straining beams are arranged between the two corresponding supports respectively; the arch shell is provided with a plurality of arch feet, the arch feet are connected to the corresponding supports respectively, the prestressed straining beams and the supports connected with the prestressed straining beams are provided with prestressed ducts, and the prestressed tendons are arranged in the prestressed ducts. The horizontal bearing capacity and the horizontal rigidity of the pile foundation are weak, the horizontal displacement of the pile top needs to be strictly controlled, and |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117702913A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117702913A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117702913A3</originalsourceid><addsrcrecordid>eNqNjbEKwjAQhrs4iPoO5wMI1g7FsRTFycm9hOTSBJK7cpcizr64oK6C0w8fH9-_rJ6d2AAaMCXQIrMtsyDoQwtmuMcSIBkZEXJ0LiHwhBRpBEMOPM8CPjELWBZC0Te2TJ9QZIKMJbAD9mB-_6yrhTdJcfPdVbU9n279ZYcTD6iTsUhYhv5a1227Pxzrpmv-cV6U1Usn</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Arch shell structure system with large middle opening and four floor corners and construction method of arch shell structure system</title><source>esp@cenet</source><creator>ZHANG KAICHEN ; WANG LEI ; LIANG YUNDONG ; MAO ZHENLONG ; LI MING ; PENG BO ; YANG SONGLIN ; ZHANG HAIYAN ; XU ZHONGWEN ; YUAN LIPENG ; LIU WENTING ; HAO YUFENG ; REN QINGYING</creator><creatorcontrib>ZHANG KAICHEN ; WANG LEI ; LIANG YUNDONG ; MAO ZHENLONG ; LI MING ; PENG BO ; YANG SONGLIN ; ZHANG HAIYAN ; XU ZHONGWEN ; YUAN LIPENG ; LIU WENTING ; HAO YUFENG ; REN QINGYING</creatorcontrib><description>The invention discloses a large-middle-opening four-corner landing arch shell structure system and a construction method thereof.The large-middle-opening four-corner landing arch shell structure system comprises a plurality of pile foundations, a plurality of supports, a plurality of prestressed straining beams and an arch shell, all the supports are arranged on the corresponding pile foundations respectively, and all the prestressed straining beams are arranged between the two corresponding supports respectively; the arch shell is provided with a plurality of arch feet, the arch feet are connected to the corresponding supports respectively, the prestressed straining beams and the supports connected with the prestressed straining beams are provided with prestressed ducts, and the prestressed tendons are arranged in the prestressed ducts. The horizontal bearing capacity and the horizontal rigidity of the pile foundation are weak, the horizontal displacement of the pile top needs to be strictly controlled, and</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; CEILINGS ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FLOORS ; FORMS ; FOUNDATIONS ; GENERAL BUILDING CONSTRUCTIONS ; HANDLING BUILDING MATERIALS ON THE SITE ; HYDRAULIC ENGINEERING ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; ROOFS ; SCAFFOLDING ; SHUTTERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES ; WALLS, e.g. PARTITIONS</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240315&DB=EPODOC&CC=CN&NR=117702913A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240315&DB=EPODOC&CC=CN&NR=117702913A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG KAICHEN</creatorcontrib><creatorcontrib>WANG LEI</creatorcontrib><creatorcontrib>LIANG YUNDONG</creatorcontrib><creatorcontrib>MAO ZHENLONG</creatorcontrib><creatorcontrib>LI MING</creatorcontrib><creatorcontrib>PENG BO</creatorcontrib><creatorcontrib>YANG SONGLIN</creatorcontrib><creatorcontrib>ZHANG HAIYAN</creatorcontrib><creatorcontrib>XU ZHONGWEN</creatorcontrib><creatorcontrib>YUAN LIPENG</creatorcontrib><creatorcontrib>LIU WENTING</creatorcontrib><creatorcontrib>HAO YUFENG</creatorcontrib><creatorcontrib>REN QINGYING</creatorcontrib><title>Arch shell structure system with large middle opening and four floor corners and construction method of arch shell structure system</title><description>The invention discloses a large-middle-opening four-corner landing arch shell structure system and a construction method thereof.The large-middle-opening four-corner landing arch shell structure system comprises a plurality of pile foundations, a plurality of supports, a plurality of prestressed straining beams and an arch shell, all the supports are arranged on the corresponding pile foundations respectively, and all the prestressed straining beams are arranged between the two corresponding supports respectively; the arch shell is provided with a plurality of arch feet, the arch feet are connected to the corresponding supports respectively, the prestressed straining beams and the supports connected with the prestressed straining beams are provided with prestressed ducts, and the prestressed tendons are arranged in the prestressed ducts. The horizontal bearing capacity and the horizontal rigidity of the pile foundation are weak, the horizontal displacement of the pile top needs to be strictly controlled, and</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>CEILINGS</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>FORMS</subject><subject>FOUNDATIONS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>HYDRAULIC ENGINEERING</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>ROOFS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><subject>WALLS, e.g. PARTITIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjbEKwjAQhrs4iPoO5wMI1g7FsRTFycm9hOTSBJK7cpcizr64oK6C0w8fH9-_rJ6d2AAaMCXQIrMtsyDoQwtmuMcSIBkZEXJ0LiHwhBRpBEMOPM8CPjELWBZC0Te2TJ9QZIKMJbAD9mB-_6yrhTdJcfPdVbU9n279ZYcTD6iTsUhYhv5a1227Pxzrpmv-cV6U1Usn</recordid><startdate>20240315</startdate><enddate>20240315</enddate><creator>ZHANG KAICHEN</creator><creator>WANG LEI</creator><creator>LIANG YUNDONG</creator><creator>MAO ZHENLONG</creator><creator>LI MING</creator><creator>PENG BO</creator><creator>YANG SONGLIN</creator><creator>ZHANG HAIYAN</creator><creator>XU ZHONGWEN</creator><creator>YUAN LIPENG</creator><creator>LIU WENTING</creator><creator>HAO YUFENG</creator><creator>REN QINGYING</creator><scope>EVB</scope></search><sort><creationdate>20240315</creationdate><title>Arch shell structure system with large middle opening and four floor corners and construction method of arch shell structure system</title><author>ZHANG KAICHEN ; WANG LEI ; LIANG YUNDONG ; MAO ZHENLONG ; LI MING ; PENG BO ; YANG SONGLIN ; ZHANG HAIYAN ; XU ZHONGWEN ; YUAN LIPENG ; LIU WENTING ; HAO YUFENG ; REN QINGYING</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117702913A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>CEILINGS</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>FORMS</topic><topic>FOUNDATIONS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>HYDRAULIC ENGINEERING</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>ROOFS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><topic>WALLS, e.g. PARTITIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG KAICHEN</creatorcontrib><creatorcontrib>WANG LEI</creatorcontrib><creatorcontrib>LIANG YUNDONG</creatorcontrib><creatorcontrib>MAO ZHENLONG</creatorcontrib><creatorcontrib>LI MING</creatorcontrib><creatorcontrib>PENG BO</creatorcontrib><creatorcontrib>YANG SONGLIN</creatorcontrib><creatorcontrib>ZHANG HAIYAN</creatorcontrib><creatorcontrib>XU ZHONGWEN</creatorcontrib><creatorcontrib>YUAN LIPENG</creatorcontrib><creatorcontrib>LIU WENTING</creatorcontrib><creatorcontrib>HAO YUFENG</creatorcontrib><creatorcontrib>REN QINGYING</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG KAICHEN</au><au>WANG LEI</au><au>LIANG YUNDONG</au><au>MAO ZHENLONG</au><au>LI MING</au><au>PENG BO</au><au>YANG SONGLIN</au><au>ZHANG HAIYAN</au><au>XU ZHONGWEN</au><au>YUAN LIPENG</au><au>LIU WENTING</au><au>HAO YUFENG</au><au>REN QINGYING</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Arch shell structure system with large middle opening and four floor corners and construction method of arch shell structure system</title><date>2024-03-15</date><risdate>2024</risdate><abstract>The invention discloses a large-middle-opening four-corner landing arch shell structure system and a construction method thereof.The large-middle-opening four-corner landing arch shell structure system comprises a plurality of pile foundations, a plurality of supports, a plurality of prestressed straining beams and an arch shell, all the supports are arranged on the corresponding pile foundations respectively, and all the prestressed straining beams are arranged between the two corresponding supports respectively; the arch shell is provided with a plurality of arch feet, the arch feet are connected to the corresponding supports respectively, the prestressed straining beams and the supports connected with the prestressed straining beams are provided with prestressed ducts, and the prestressed tendons are arranged in the prestressed ducts. The horizontal bearing capacity and the horizontal rigidity of the pile foundation are weak, the horizontal displacement of the pile top needs to be strictly controlled, and</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN117702913A |
source | esp@cenet |
subjects | BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE CEILINGS EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FLOORS FORMS FOUNDATIONS GENERAL BUILDING CONSTRUCTIONS HANDLING BUILDING MATERIALS ON THE SITE HYDRAULIC ENGINEERING INSULATION OR OTHER PROTECTION OF BUILDINGS REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ROOFS SCAFFOLDING SHUTTERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES WALLS, e.g. PARTITIONS |
title | Arch shell structure system with large middle opening and four floor corners and construction method of arch shell structure system |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-02T00%3A09%3A05IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20KAICHEN&rft.date=2024-03-15&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117702913A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |