Hydropower station dam body leaking stoppage construction method
The invention discloses a hydropower station dam body leaking stoppage construction method which comprises the following steps that a dam body is drilled, a water seepage channel is determined, and a communicating hole is formed; the drilled hole diameter, distance and depth are checked, the upper a...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | TIAN RUXI BAO ZHIJUN LIU TAOHONG CAO YI WANG TAOXU LIU JIAHU MAO JUNLIN YANG XIAOHONG YI YONGBIN |
description | The invention discloses a hydropower station dam body leaking stoppage construction method which comprises the following steps that a dam body is drilled, a water seepage channel is determined, and a communicating hole is formed; the drilled hole diameter, distance and depth are checked, the upper and lower separation space distance of the water seepage channel is determined, and the water seepage channel is checked; performing reaming operation on the drilled hole for concrete pouring construction; after reaming, water injection operation is carried out, then mortar pouring is carried out, first-level concrete is poured into a hole for pouring, quick-setting concrete is poured into the hole for pouring, and finally common grout concrete is used for pouring construction. According to the scheme, a multi-hole and multi-material combined large-flow pouring construction mode is adopted, and a synchronous concrete pouring mode is matched with cement water glass and polyurethane pouring when the water level in fro |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117702688A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117702688A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117702688A3</originalsourceid><addsrcrecordid>eNrjZHDwqEwpyi_IL08tUiguSSzJzM9TSEnMVUjKT6lUyElNzM7MSwdK5BcUJKanKiTn5xWXFJUmg5XlppZk5KfwMLCmJeYUp_JCaW4GRTfXEGcP3dSC_PjU4oLE5NS81JJ4Zz9DQ3NzAyMzCwtHY2LUAAAiADIW</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Hydropower station dam body leaking stoppage construction method</title><source>esp@cenet</source><creator>TIAN RUXI ; BAO ZHIJUN ; LIU TAOHONG ; CAO YI ; WANG TAOXU ; LIU JIAHU ; MAO JUNLIN ; YANG XIAOHONG ; YI YONGBIN</creator><creatorcontrib>TIAN RUXI ; BAO ZHIJUN ; LIU TAOHONG ; CAO YI ; WANG TAOXU ; LIU JIAHU ; MAO JUNLIN ; YANG XIAOHONG ; YI YONGBIN</creatorcontrib><description>The invention discloses a hydropower station dam body leaking stoppage construction method which comprises the following steps that a dam body is drilled, a water seepage channel is determined, and a communicating hole is formed; the drilled hole diameter, distance and depth are checked, the upper and lower separation space distance of the water seepage channel is determined, and the water seepage channel is checked; performing reaming operation on the drilled hole for concrete pouring construction; after reaming, water injection operation is carried out, then mortar pouring is carried out, first-level concrete is poured into a hole for pouring, quick-setting concrete is poured into the hole for pouring, and finally common grout concrete is used for pouring construction. According to the scheme, a multi-hole and multi-material combined large-flow pouring construction mode is adopted, and a synchronous concrete pouring mode is matched with cement water glass and polyurethane pouring when the water level in fro</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240315&DB=EPODOC&CC=CN&NR=117702688A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240315&DB=EPODOC&CC=CN&NR=117702688A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>TIAN RUXI</creatorcontrib><creatorcontrib>BAO ZHIJUN</creatorcontrib><creatorcontrib>LIU TAOHONG</creatorcontrib><creatorcontrib>CAO YI</creatorcontrib><creatorcontrib>WANG TAOXU</creatorcontrib><creatorcontrib>LIU JIAHU</creatorcontrib><creatorcontrib>MAO JUNLIN</creatorcontrib><creatorcontrib>YANG XIAOHONG</creatorcontrib><creatorcontrib>YI YONGBIN</creatorcontrib><title>Hydropower station dam body leaking stoppage construction method</title><description>The invention discloses a hydropower station dam body leaking stoppage construction method which comprises the following steps that a dam body is drilled, a water seepage channel is determined, and a communicating hole is formed; the drilled hole diameter, distance and depth are checked, the upper and lower separation space distance of the water seepage channel is determined, and the water seepage channel is checked; performing reaming operation on the drilled hole for concrete pouring construction; after reaming, water injection operation is carried out, then mortar pouring is carried out, first-level concrete is poured into a hole for pouring, quick-setting concrete is poured into the hole for pouring, and finally common grout concrete is used for pouring construction. According to the scheme, a multi-hole and multi-material combined large-flow pouring construction mode is adopted, and a synchronous concrete pouring mode is matched with cement water glass and polyurethane pouring when the water level in fro</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHDwqEwpyi_IL08tUiguSSzJzM9TSEnMVUjKT6lUyElNzM7MSwdK5BcUJKanKiTn5xWXFJUmg5XlppZk5KfwMLCmJeYUp_JCaW4GRTfXEGcP3dSC_PjU4oLE5NS81JJ4Zz9DQ3NzAyMzCwtHY2LUAAAiADIW</recordid><startdate>20240315</startdate><enddate>20240315</enddate><creator>TIAN RUXI</creator><creator>BAO ZHIJUN</creator><creator>LIU TAOHONG</creator><creator>CAO YI</creator><creator>WANG TAOXU</creator><creator>LIU JIAHU</creator><creator>MAO JUNLIN</creator><creator>YANG XIAOHONG</creator><creator>YI YONGBIN</creator><scope>EVB</scope></search><sort><creationdate>20240315</creationdate><title>Hydropower station dam body leaking stoppage construction method</title><author>TIAN RUXI ; BAO ZHIJUN ; LIU TAOHONG ; CAO YI ; WANG TAOXU ; LIU JIAHU ; MAO JUNLIN ; YANG XIAOHONG ; YI YONGBIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117702688A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>TIAN RUXI</creatorcontrib><creatorcontrib>BAO ZHIJUN</creatorcontrib><creatorcontrib>LIU TAOHONG</creatorcontrib><creatorcontrib>CAO YI</creatorcontrib><creatorcontrib>WANG TAOXU</creatorcontrib><creatorcontrib>LIU JIAHU</creatorcontrib><creatorcontrib>MAO JUNLIN</creatorcontrib><creatorcontrib>YANG XIAOHONG</creatorcontrib><creatorcontrib>YI YONGBIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>TIAN RUXI</au><au>BAO ZHIJUN</au><au>LIU TAOHONG</au><au>CAO YI</au><au>WANG TAOXU</au><au>LIU JIAHU</au><au>MAO JUNLIN</au><au>YANG XIAOHONG</au><au>YI YONGBIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Hydropower station dam body leaking stoppage construction method</title><date>2024-03-15</date><risdate>2024</risdate><abstract>The invention discloses a hydropower station dam body leaking stoppage construction method which comprises the following steps that a dam body is drilled, a water seepage channel is determined, and a communicating hole is formed; the drilled hole diameter, distance and depth are checked, the upper and lower separation space distance of the water seepage channel is determined, and the water seepage channel is checked; performing reaming operation on the drilled hole for concrete pouring construction; after reaming, water injection operation is carried out, then mortar pouring is carried out, first-level concrete is poured into a hole for pouring, quick-setting concrete is poured into the hole for pouring, and finally common grout concrete is used for pouring construction. According to the scheme, a multi-hole and multi-material combined large-flow pouring construction mode is adopted, and a synchronous concrete pouring mode is matched with cement water glass and polyurethane pouring when the water level in fro</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN117702688A |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Hydropower station dam body leaking stoppage construction method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-25T07%3A20%3A35IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=TIAN%20RUXI&rft.date=2024-03-15&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117702688A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |