Safety hanging basket for bridge construction

The invention discloses a bridge construction safety hanging basket which comprises a plurality of sliding rails, the bottom wall of each sliding rail is fixedly connected with an anchoring frame, the top wall of each sliding rail is slidably connected with a plurality of moving frames, and the tops...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHENG GEGE, ZHANG SIQI, SUN HANZHENG, LI DAN, GENG YAJIE
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator CHENG GEGE
ZHANG SIQI
SUN HANZHENG
LI DAN
GENG YAJIE
description The invention discloses a bridge construction safety hanging basket which comprises a plurality of sliding rails, the bottom wall of each sliding rail is fixedly connected with an anchoring frame, the top wall of each sliding rail is slidably connected with a plurality of moving frames, and the tops of the moving frames are fixedly connected with rhombic supporting frames. The top walls of the multiple rhombic supporting frames are jointly and fixedly connected with a top frame, multiple hanging rods are installed at the bottom end of the top frame, the bottom ends of the hanging rods are jointly and fixedly connected with a detection table, a cavity is formed in the inner wall of the detection table, a motor is fixedly connected to the inner wall of the top of the cavity, and the output end of the motor is fixedly connected with a rotating shaft. The side wall of the rotating shaft is fixedly connected with a driving gear, and the inner wall of the cavity is symmetrically connected with extension tables in a
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117646395A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117646395A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117646395A3</originalsourceid><addsrcrecordid>eNrjZNANTkxLLalUyEjMS8_MS1dISizOTi1RSMsvUkgqykxJT1VIzs8rLikqTS7JzM_jYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhuZmJmbGlqaOxsSoAQDUaCpp</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Safety hanging basket for bridge construction</title><source>esp@cenet</source><creator>CHENG GEGE ; ZHANG SIQI ; SUN HANZHENG ; LI DAN ; GENG YAJIE</creator><creatorcontrib>CHENG GEGE ; ZHANG SIQI ; SUN HANZHENG ; LI DAN ; GENG YAJIE</creatorcontrib><description>The invention discloses a bridge construction safety hanging basket which comprises a plurality of sliding rails, the bottom wall of each sliding rail is fixedly connected with an anchoring frame, the top wall of each sliding rail is slidably connected with a plurality of moving frames, and the tops of the moving frames are fixedly connected with rhombic supporting frames. The top walls of the multiple rhombic supporting frames are jointly and fixedly connected with a top frame, multiple hanging rods are installed at the bottom end of the top frame, the bottom ends of the hanging rods are jointly and fixedly connected with a detection table, a cavity is formed in the inner wall of the detection table, a motor is fixedly connected to the inner wall of the top of the cavity, and the output end of the motor is fixedly connected with a rotating shaft. The side wall of the rotating shaft is fixedly connected with a driving gear, and the inner wall of the cavity is symmetrically connected with extension tables in a</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240305&amp;DB=EPODOC&amp;CC=CN&amp;NR=117646395A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,778,883,25551,76302</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240305&amp;DB=EPODOC&amp;CC=CN&amp;NR=117646395A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CHENG GEGE</creatorcontrib><creatorcontrib>ZHANG SIQI</creatorcontrib><creatorcontrib>SUN HANZHENG</creatorcontrib><creatorcontrib>LI DAN</creatorcontrib><creatorcontrib>GENG YAJIE</creatorcontrib><title>Safety hanging basket for bridge construction</title><description>The invention discloses a bridge construction safety hanging basket which comprises a plurality of sliding rails, the bottom wall of each sliding rail is fixedly connected with an anchoring frame, the top wall of each sliding rail is slidably connected with a plurality of moving frames, and the tops of the moving frames are fixedly connected with rhombic supporting frames. The top walls of the multiple rhombic supporting frames are jointly and fixedly connected with a top frame, multiple hanging rods are installed at the bottom end of the top frame, the bottom ends of the hanging rods are jointly and fixedly connected with a detection table, a cavity is formed in the inner wall of the detection table, a motor is fixedly connected to the inner wall of the top of the cavity, and the output end of the motor is fixedly connected with a rotating shaft. The side wall of the rotating shaft is fixedly connected with a driving gear, and the inner wall of the cavity is symmetrically connected with extension tables in a</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNANTkxLLalUyEjMS8_MS1dISizOTi1RSMsvUkgqykxJT1VIzs8rLikqTS7JzM_jYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhuZmJmbGlqaOxsSoAQDUaCpp</recordid><startdate>20240305</startdate><enddate>20240305</enddate><creator>CHENG GEGE</creator><creator>ZHANG SIQI</creator><creator>SUN HANZHENG</creator><creator>LI DAN</creator><creator>GENG YAJIE</creator><scope>EVB</scope></search><sort><creationdate>20240305</creationdate><title>Safety hanging basket for bridge construction</title><author>CHENG GEGE ; ZHANG SIQI ; SUN HANZHENG ; LI DAN ; GENG YAJIE</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117646395A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>CHENG GEGE</creatorcontrib><creatorcontrib>ZHANG SIQI</creatorcontrib><creatorcontrib>SUN HANZHENG</creatorcontrib><creatorcontrib>LI DAN</creatorcontrib><creatorcontrib>GENG YAJIE</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CHENG GEGE</au><au>ZHANG SIQI</au><au>SUN HANZHENG</au><au>LI DAN</au><au>GENG YAJIE</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Safety hanging basket for bridge construction</title><date>2024-03-05</date><risdate>2024</risdate><abstract>The invention discloses a bridge construction safety hanging basket which comprises a plurality of sliding rails, the bottom wall of each sliding rail is fixedly connected with an anchoring frame, the top wall of each sliding rail is slidably connected with a plurality of moving frames, and the tops of the moving frames are fixedly connected with rhombic supporting frames. The top walls of the multiple rhombic supporting frames are jointly and fixedly connected with a top frame, multiple hanging rods are installed at the bottom end of the top frame, the bottom ends of the hanging rods are jointly and fixedly connected with a detection table, a cavity is formed in the inner wall of the detection table, a motor is fixedly connected to the inner wall of the top of the cavity, and the output end of the motor is fixedly connected with a rotating shaft. The side wall of the rotating shaft is fixedly connected with a driving gear, and the inner wall of the cavity is symmetrically connected with extension tables in a</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN117646395A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Safety hanging basket for bridge construction
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-15T13%3A22%3A29IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CHENG%20GEGE&rft.date=2024-03-05&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117646395A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true