River channel embankment ecological improvement system and construction method

The invention relates to a riverway embankment ecological improvement system and a construction method. The construction method comprises the following steps of supporting system construction, ground beam and platform construction, active service retaining wall upgrading and reinforcing, riprap silt...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHANG DAN, YU MENG, LI CHANGCHUN, YUE YANG, ZHU JIANWEN, YAN ZHAODONG, JIN RUI, WU QIYUAN, ZHENG JINHUI, ZHANG SHUO, GUO DACHUI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHANG DAN
YU MENG
LI CHANGCHUN
YUE YANG
ZHU JIANWEN
YAN ZHAODONG
JIN RUI
WU QIYUAN
ZHENG JINHUI
ZHANG SHUO
GUO DACHUI
description The invention relates to a riverway embankment ecological improvement system and a construction method. The construction method comprises the following steps of supporting system construction, ground beam and platform construction, active service retaining wall upgrading and reinforcing, riprap silt squeezing construction, bottom plate construction and slope protection construction. The method has the beneficial effects that a cast-in-place pile-prefabricated slab combined supporting system is adopted, the plate hanging problem is solved through cooperation of the fixing holes and the penetrating rods, and slope-free supporting is achieved; an active-service retaining wall profile steel anchor rod reinforcing system is adopted, anchor rods are arranged in an active-service retaining wall and anchored through anchor plates, profile steel is arranged outside the active-service retaining wall, the problem that the supporting and retaining capacity of the active-service retaining wall is insufficient is solved, a
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117626890A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117626890A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117626890A3</originalsourceid><addsrcrecordid>eNqNykEKwjAQRuFuXIh6h_EAglWoupSiuOpC3JeY_rXBZCYkY8HbC-IBXD34eNOiuboRiexgmOEJ4W74GcBKsOLl4azx5EJMMuLL-Z0VgQx3ZIWzppdVJ0wBOkg3Lya98RmLX2fF8ny61ZcVorTI0VgwtK2bstxVm2p_WB-3_zwfi0Y3lA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>River channel embankment ecological improvement system and construction method</title><source>esp@cenet</source><creator>ZHANG DAN ; YU MENG ; LI CHANGCHUN ; YUE YANG ; ZHU JIANWEN ; YAN ZHAODONG ; JIN RUI ; WU QIYUAN ; ZHENG JINHUI ; ZHANG SHUO ; GUO DACHUI</creator><creatorcontrib>ZHANG DAN ; YU MENG ; LI CHANGCHUN ; YUE YANG ; ZHU JIANWEN ; YAN ZHAODONG ; JIN RUI ; WU QIYUAN ; ZHENG JINHUI ; ZHANG SHUO ; GUO DACHUI</creatorcontrib><description>The invention relates to a riverway embankment ecological improvement system and a construction method. The construction method comprises the following steps of supporting system construction, ground beam and platform construction, active service retaining wall upgrading and reinforcing, riprap silt squeezing construction, bottom plate construction and slope protection construction. The method has the beneficial effects that a cast-in-place pile-prefabricated slab combined supporting system is adopted, the plate hanging problem is solved through cooperation of the fixing holes and the penetrating rods, and slope-free supporting is achieved; an active-service retaining wall profile steel anchor rod reinforcing system is adopted, anchor rods are arranged in an active-service retaining wall and anchored through anchor plates, profile steel is arranged outside the active-service retaining wall, the problem that the supporting and retaining capacity of the active-service retaining wall is insufficient is solved, a</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240301&amp;DB=EPODOC&amp;CC=CN&amp;NR=117626890A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240301&amp;DB=EPODOC&amp;CC=CN&amp;NR=117626890A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG DAN</creatorcontrib><creatorcontrib>YU MENG</creatorcontrib><creatorcontrib>LI CHANGCHUN</creatorcontrib><creatorcontrib>YUE YANG</creatorcontrib><creatorcontrib>ZHU JIANWEN</creatorcontrib><creatorcontrib>YAN ZHAODONG</creatorcontrib><creatorcontrib>JIN RUI</creatorcontrib><creatorcontrib>WU QIYUAN</creatorcontrib><creatorcontrib>ZHENG JINHUI</creatorcontrib><creatorcontrib>ZHANG SHUO</creatorcontrib><creatorcontrib>GUO DACHUI</creatorcontrib><title>River channel embankment ecological improvement system and construction method</title><description>The invention relates to a riverway embankment ecological improvement system and a construction method. The construction method comprises the following steps of supporting system construction, ground beam and platform construction, active service retaining wall upgrading and reinforcing, riprap silt squeezing construction, bottom plate construction and slope protection construction. The method has the beneficial effects that a cast-in-place pile-prefabricated slab combined supporting system is adopted, the plate hanging problem is solved through cooperation of the fixing holes and the penetrating rods, and slope-free supporting is achieved; an active-service retaining wall profile steel anchor rod reinforcing system is adopted, anchor rods are arranged in an active-service retaining wall and anchored through anchor plates, profile steel is arranged outside the active-service retaining wall, the problem that the supporting and retaining capacity of the active-service retaining wall is insufficient is solved, a</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNykEKwjAQRuFuXIh6h_EAglWoupSiuOpC3JeY_rXBZCYkY8HbC-IBXD34eNOiuboRiexgmOEJ4W74GcBKsOLl4azx5EJMMuLL-Z0VgQx3ZIWzppdVJ0wBOkg3Lya98RmLX2fF8ny61ZcVorTI0VgwtK2bstxVm2p_WB-3_zwfi0Y3lA</recordid><startdate>20240301</startdate><enddate>20240301</enddate><creator>ZHANG DAN</creator><creator>YU MENG</creator><creator>LI CHANGCHUN</creator><creator>YUE YANG</creator><creator>ZHU JIANWEN</creator><creator>YAN ZHAODONG</creator><creator>JIN RUI</creator><creator>WU QIYUAN</creator><creator>ZHENG JINHUI</creator><creator>ZHANG SHUO</creator><creator>GUO DACHUI</creator><scope>EVB</scope></search><sort><creationdate>20240301</creationdate><title>River channel embankment ecological improvement system and construction method</title><author>ZHANG DAN ; YU MENG ; LI CHANGCHUN ; YUE YANG ; ZHU JIANWEN ; YAN ZHAODONG ; JIN RUI ; WU QIYUAN ; ZHENG JINHUI ; ZHANG SHUO ; GUO DACHUI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117626890A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG DAN</creatorcontrib><creatorcontrib>YU MENG</creatorcontrib><creatorcontrib>LI CHANGCHUN</creatorcontrib><creatorcontrib>YUE YANG</creatorcontrib><creatorcontrib>ZHU JIANWEN</creatorcontrib><creatorcontrib>YAN ZHAODONG</creatorcontrib><creatorcontrib>JIN RUI</creatorcontrib><creatorcontrib>WU QIYUAN</creatorcontrib><creatorcontrib>ZHENG JINHUI</creatorcontrib><creatorcontrib>ZHANG SHUO</creatorcontrib><creatorcontrib>GUO DACHUI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG DAN</au><au>YU MENG</au><au>LI CHANGCHUN</au><au>YUE YANG</au><au>ZHU JIANWEN</au><au>YAN ZHAODONG</au><au>JIN RUI</au><au>WU QIYUAN</au><au>ZHENG JINHUI</au><au>ZHANG SHUO</au><au>GUO DACHUI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>River channel embankment ecological improvement system and construction method</title><date>2024-03-01</date><risdate>2024</risdate><abstract>The invention relates to a riverway embankment ecological improvement system and a construction method. The construction method comprises the following steps of supporting system construction, ground beam and platform construction, active service retaining wall upgrading and reinforcing, riprap silt squeezing construction, bottom plate construction and slope protection construction. The method has the beneficial effects that a cast-in-place pile-prefabricated slab combined supporting system is adopted, the plate hanging problem is solved through cooperation of the fixing holes and the penetrating rods, and slope-free supporting is achieved; an active-service retaining wall profile steel anchor rod reinforcing system is adopted, anchor rods are arranged in an active-service retaining wall and anchored through anchor plates, profile steel is arranged outside the active-service retaining wall, the problem that the supporting and retaining capacity of the active-service retaining wall is insufficient is solved, a</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN117626890A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title River channel embankment ecological improvement system and construction method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-27T00%3A08%3A31IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20DAN&rft.date=2024-03-01&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117626890A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true