Method for calculating extra equipment cost of industrial load participating in power grid demand side response
The invention discloses a method for calculating extra equipment cost of an industrial load participating in power grid demand side response, and relates to the field of participation of the industrial load in power grid demand side response, and the method comprises the steps: obtaining normal cost...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | WANG YONGCAN CHEN BAORUI CHEN GANG CHEN ZHEN YE XI LIAO SIYANG SHI PENG WANG XI XIE HAOCONG |
description | The invention discloses a method for calculating extra equipment cost of an industrial load participating in power grid demand side response, and relates to the field of participation of the industrial load in power grid demand side response, and the method comprises the steps: obtaining normal cost and the total quantity of products produced by production equipment, and carrying out the calculation to obtain first cost of a unit product produced by the production equipment in a normal period of the load; acquiring unit electric energy consumed by the production equipment for producing unit products in the normal load period, and calculating to obtain second cost generated by the unit electric energy consumed by the production equipment in the normal load period; calculating to obtain a third cost generated when the production equipment consumes unit electric energy in the abnormal period of the load; obtaining cost weights of influence factors of different production devices by using an analytic hierarchy pr |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117610834A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117610834A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117610834A3</originalsourceid><addsrcrecordid>eNqNyzEKwkAQQNE0FqLeYTyAYIiorQTFRiv7MOxO4sBmZ52dRY-voAew-s3700ouZHfx0IuCw-BKQOM4AL1MEehROI0UDZxkA-mBoy_ZlDFAEPSQUI0dp-_FEZI8SWFQ9uBpxOghsydQyklipnk16TFkWvw6q5an4609ryhJ9zHoKJJ17bWud9t6vW82h-Yf8wZJ9UNi</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Method for calculating extra equipment cost of industrial load participating in power grid demand side response</title><source>esp@cenet</source><creator>WANG YONGCAN ; CHEN BAORUI ; CHEN GANG ; CHEN ZHEN ; YE XI ; LIAO SIYANG ; SHI PENG ; WANG XI ; XIE HAOCONG</creator><creatorcontrib>WANG YONGCAN ; CHEN BAORUI ; CHEN GANG ; CHEN ZHEN ; YE XI ; LIAO SIYANG ; SHI PENG ; WANG XI ; XIE HAOCONG</creatorcontrib><description>The invention discloses a method for calculating extra equipment cost of an industrial load participating in power grid demand side response, and relates to the field of participation of the industrial load in power grid demand side response, and the method comprises the steps: obtaining normal cost and the total quantity of products produced by production equipment, and carrying out the calculation to obtain first cost of a unit product produced by the production equipment in a normal period of the load; acquiring unit electric energy consumed by the production equipment for producing unit products in the normal load period, and calculating to obtain second cost generated by the unit electric energy consumed by the production equipment in the normal load period; calculating to obtain a third cost generated when the production equipment consumes unit electric energy in the abnormal period of the load; obtaining cost weights of influence factors of different production devices by using an analytic hierarchy pr</description><language>chi ; eng</language><subject>CALCULATING ; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER ; COMPUTING ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; ELECTRICITY ; GENERATION ; PHYSICS ; SYSTEMS FOR STORING ELECTRIC ENERGY ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240227&DB=EPODOC&CC=CN&NR=117610834A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76418</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240227&DB=EPODOC&CC=CN&NR=117610834A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG YONGCAN</creatorcontrib><creatorcontrib>CHEN BAORUI</creatorcontrib><creatorcontrib>CHEN GANG</creatorcontrib><creatorcontrib>CHEN ZHEN</creatorcontrib><creatorcontrib>YE XI</creatorcontrib><creatorcontrib>LIAO SIYANG</creatorcontrib><creatorcontrib>SHI PENG</creatorcontrib><creatorcontrib>WANG XI</creatorcontrib><creatorcontrib>XIE HAOCONG</creatorcontrib><title>Method for calculating extra equipment cost of industrial load participating in power grid demand side response</title><description>The invention discloses a method for calculating extra equipment cost of an industrial load participating in power grid demand side response, and relates to the field of participation of the industrial load in power grid demand side response, and the method comprises the steps: obtaining normal cost and the total quantity of products produced by production equipment, and carrying out the calculation to obtain first cost of a unit product produced by the production equipment in a normal period of the load; acquiring unit electric energy consumed by the production equipment for producing unit products in the normal load period, and calculating to obtain second cost generated by the unit electric energy consumed by the production equipment in the normal load period; calculating to obtain a third cost generated when the production equipment consumes unit electric energy in the abnormal period of the load; obtaining cost weights of influence factors of different production devices by using an analytic hierarchy pr</description><subject>CALCULATING</subject><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</subject><subject>COMPUTING</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>ELECTRICITY</subject><subject>GENERATION</subject><subject>PHYSICS</subject><subject>SYSTEMS FOR STORING ELECTRIC ENERGY</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyzEKwkAQQNE0FqLeYTyAYIiorQTFRiv7MOxO4sBmZ52dRY-voAew-s3700ouZHfx0IuCw-BKQOM4AL1MEehROI0UDZxkA-mBoy_ZlDFAEPSQUI0dp-_FEZI8SWFQ9uBpxOghsydQyklipnk16TFkWvw6q5an4609ryhJ9zHoKJJ17bWud9t6vW82h-Yf8wZJ9UNi</recordid><startdate>20240227</startdate><enddate>20240227</enddate><creator>WANG YONGCAN</creator><creator>CHEN BAORUI</creator><creator>CHEN GANG</creator><creator>CHEN ZHEN</creator><creator>YE XI</creator><creator>LIAO SIYANG</creator><creator>SHI PENG</creator><creator>WANG XI</creator><creator>XIE HAOCONG</creator><scope>EVB</scope></search><sort><creationdate>20240227</creationdate><title>Method for calculating extra equipment cost of industrial load participating in power grid demand side response</title><author>WANG YONGCAN ; CHEN BAORUI ; CHEN GANG ; CHEN ZHEN ; YE XI ; LIAO SIYANG ; SHI PENG ; WANG XI ; XIE HAOCONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117610834A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>CALCULATING</topic><topic>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</topic><topic>COMPUTING</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>ELECTRICITY</topic><topic>GENERATION</topic><topic>PHYSICS</topic><topic>SYSTEMS FOR STORING ELECTRIC ENERGY</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG YONGCAN</creatorcontrib><creatorcontrib>CHEN BAORUI</creatorcontrib><creatorcontrib>CHEN GANG</creatorcontrib><creatorcontrib>CHEN ZHEN</creatorcontrib><creatorcontrib>YE XI</creatorcontrib><creatorcontrib>LIAO SIYANG</creatorcontrib><creatorcontrib>SHI PENG</creatorcontrib><creatorcontrib>WANG XI</creatorcontrib><creatorcontrib>XIE HAOCONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG YONGCAN</au><au>CHEN BAORUI</au><au>CHEN GANG</au><au>CHEN ZHEN</au><au>YE XI</au><au>LIAO SIYANG</au><au>SHI PENG</au><au>WANG XI</au><au>XIE HAOCONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Method for calculating extra equipment cost of industrial load participating in power grid demand side response</title><date>2024-02-27</date><risdate>2024</risdate><abstract>The invention discloses a method for calculating extra equipment cost of an industrial load participating in power grid demand side response, and relates to the field of participation of the industrial load in power grid demand side response, and the method comprises the steps: obtaining normal cost and the total quantity of products produced by production equipment, and carrying out the calculation to obtain first cost of a unit product produced by the production equipment in a normal period of the load; acquiring unit electric energy consumed by the production equipment for producing unit products in the normal load period, and calculating to obtain second cost generated by the unit electric energy consumed by the production equipment in the normal load period; calculating to obtain a third cost generated when the production equipment consumes unit electric energy in the abnormal period of the load; obtaining cost weights of influence factors of different production devices by using an analytic hierarchy pr</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN117610834A |
source | esp@cenet |
subjects | CALCULATING CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER COMPUTING CONVERSION OR DISTRIBUTION OF ELECTRIC POWER COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ELECTRICITY GENERATION PHYSICS SYSTEMS FOR STORING ELECTRIC ENERGY SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | Method for calculating extra equipment cost of industrial load participating in power grid demand side response |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-09T05%3A14%3A09IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20YONGCAN&rft.date=2024-02-27&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117610834A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |