Method for calculating extra equipment cost of industrial load participating in power grid demand side response

The invention discloses a method for calculating extra equipment cost of an industrial load participating in power grid demand side response, and relates to the field of participation of the industrial load in power grid demand side response, and the method comprises the steps: obtaining normal cost...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG YONGCAN, CHEN BAORUI, CHEN GANG, CHEN ZHEN, YE XI, LIAO SIYANG, SHI PENG, WANG XI, XIE HAOCONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WANG YONGCAN
CHEN BAORUI
CHEN GANG
CHEN ZHEN
YE XI
LIAO SIYANG
SHI PENG
WANG XI
XIE HAOCONG
description The invention discloses a method for calculating extra equipment cost of an industrial load participating in power grid demand side response, and relates to the field of participation of the industrial load in power grid demand side response, and the method comprises the steps: obtaining normal cost and the total quantity of products produced by production equipment, and carrying out the calculation to obtain first cost of a unit product produced by the production equipment in a normal period of the load; acquiring unit electric energy consumed by the production equipment for producing unit products in the normal load period, and calculating to obtain second cost generated by the unit electric energy consumed by the production equipment in the normal load period; calculating to obtain a third cost generated when the production equipment consumes unit electric energy in the abnormal period of the load; obtaining cost weights of influence factors of different production devices by using an analytic hierarchy pr
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117610834A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117610834A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117610834A3</originalsourceid><addsrcrecordid>eNqNyzEKwkAQQNE0FqLeYTyAYIiorQTFRiv7MOxO4sBmZ52dRY-voAew-s3700ouZHfx0IuCw-BKQOM4AL1MEehROI0UDZxkA-mBoy_ZlDFAEPSQUI0dp-_FEZI8SWFQ9uBpxOghsydQyklipnk16TFkWvw6q5an4609ryhJ9zHoKJJ17bWud9t6vW82h-Yf8wZJ9UNi</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Method for calculating extra equipment cost of industrial load participating in power grid demand side response</title><source>esp@cenet</source><creator>WANG YONGCAN ; CHEN BAORUI ; CHEN GANG ; CHEN ZHEN ; YE XI ; LIAO SIYANG ; SHI PENG ; WANG XI ; XIE HAOCONG</creator><creatorcontrib>WANG YONGCAN ; CHEN BAORUI ; CHEN GANG ; CHEN ZHEN ; YE XI ; LIAO SIYANG ; SHI PENG ; WANG XI ; XIE HAOCONG</creatorcontrib><description>The invention discloses a method for calculating extra equipment cost of an industrial load participating in power grid demand side response, and relates to the field of participation of the industrial load in power grid demand side response, and the method comprises the steps: obtaining normal cost and the total quantity of products produced by production equipment, and carrying out the calculation to obtain first cost of a unit product produced by the production equipment in a normal period of the load; acquiring unit electric energy consumed by the production equipment for producing unit products in the normal load period, and calculating to obtain second cost generated by the unit electric energy consumed by the production equipment in the normal load period; calculating to obtain a third cost generated when the production equipment consumes unit electric energy in the abnormal period of the load; obtaining cost weights of influence factors of different production devices by using an analytic hierarchy pr</description><language>chi ; eng</language><subject>CALCULATING ; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER ; COMPUTING ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; ELECTRICITY ; GENERATION ; PHYSICS ; SYSTEMS FOR STORING ELECTRIC ENERGY ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240227&amp;DB=EPODOC&amp;CC=CN&amp;NR=117610834A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76418</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240227&amp;DB=EPODOC&amp;CC=CN&amp;NR=117610834A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG YONGCAN</creatorcontrib><creatorcontrib>CHEN BAORUI</creatorcontrib><creatorcontrib>CHEN GANG</creatorcontrib><creatorcontrib>CHEN ZHEN</creatorcontrib><creatorcontrib>YE XI</creatorcontrib><creatorcontrib>LIAO SIYANG</creatorcontrib><creatorcontrib>SHI PENG</creatorcontrib><creatorcontrib>WANG XI</creatorcontrib><creatorcontrib>XIE HAOCONG</creatorcontrib><title>Method for calculating extra equipment cost of industrial load participating in power grid demand side response</title><description>The invention discloses a method for calculating extra equipment cost of an industrial load participating in power grid demand side response, and relates to the field of participation of the industrial load in power grid demand side response, and the method comprises the steps: obtaining normal cost and the total quantity of products produced by production equipment, and carrying out the calculation to obtain first cost of a unit product produced by the production equipment in a normal period of the load; acquiring unit electric energy consumed by the production equipment for producing unit products in the normal load period, and calculating to obtain second cost generated by the unit electric energy consumed by the production equipment in the normal load period; calculating to obtain a third cost generated when the production equipment consumes unit electric energy in the abnormal period of the load; obtaining cost weights of influence factors of different production devices by using an analytic hierarchy pr</description><subject>CALCULATING</subject><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</subject><subject>COMPUTING</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>ELECTRICITY</subject><subject>GENERATION</subject><subject>PHYSICS</subject><subject>SYSTEMS FOR STORING ELECTRIC ENERGY</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyzEKwkAQQNE0FqLeYTyAYIiorQTFRiv7MOxO4sBmZ52dRY-voAew-s3700ouZHfx0IuCw-BKQOM4AL1MEehROI0UDZxkA-mBoy_ZlDFAEPSQUI0dp-_FEZI8SWFQ9uBpxOghsydQyklipnk16TFkWvw6q5an4609ryhJ9zHoKJJ17bWud9t6vW82h-Yf8wZJ9UNi</recordid><startdate>20240227</startdate><enddate>20240227</enddate><creator>WANG YONGCAN</creator><creator>CHEN BAORUI</creator><creator>CHEN GANG</creator><creator>CHEN ZHEN</creator><creator>YE XI</creator><creator>LIAO SIYANG</creator><creator>SHI PENG</creator><creator>WANG XI</creator><creator>XIE HAOCONG</creator><scope>EVB</scope></search><sort><creationdate>20240227</creationdate><title>Method for calculating extra equipment cost of industrial load participating in power grid demand side response</title><author>WANG YONGCAN ; CHEN BAORUI ; CHEN GANG ; CHEN ZHEN ; YE XI ; LIAO SIYANG ; SHI PENG ; WANG XI ; XIE HAOCONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117610834A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>CALCULATING</topic><topic>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</topic><topic>COMPUTING</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>ELECTRICITY</topic><topic>GENERATION</topic><topic>PHYSICS</topic><topic>SYSTEMS FOR STORING ELECTRIC ENERGY</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG YONGCAN</creatorcontrib><creatorcontrib>CHEN BAORUI</creatorcontrib><creatorcontrib>CHEN GANG</creatorcontrib><creatorcontrib>CHEN ZHEN</creatorcontrib><creatorcontrib>YE XI</creatorcontrib><creatorcontrib>LIAO SIYANG</creatorcontrib><creatorcontrib>SHI PENG</creatorcontrib><creatorcontrib>WANG XI</creatorcontrib><creatorcontrib>XIE HAOCONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG YONGCAN</au><au>CHEN BAORUI</au><au>CHEN GANG</au><au>CHEN ZHEN</au><au>YE XI</au><au>LIAO SIYANG</au><au>SHI PENG</au><au>WANG XI</au><au>XIE HAOCONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Method for calculating extra equipment cost of industrial load participating in power grid demand side response</title><date>2024-02-27</date><risdate>2024</risdate><abstract>The invention discloses a method for calculating extra equipment cost of an industrial load participating in power grid demand side response, and relates to the field of participation of the industrial load in power grid demand side response, and the method comprises the steps: obtaining normal cost and the total quantity of products produced by production equipment, and carrying out the calculation to obtain first cost of a unit product produced by the production equipment in a normal period of the load; acquiring unit electric energy consumed by the production equipment for producing unit products in the normal load period, and calculating to obtain second cost generated by the unit electric energy consumed by the production equipment in the normal load period; calculating to obtain a third cost generated when the production equipment consumes unit electric energy in the abnormal period of the load; obtaining cost weights of influence factors of different production devices by using an analytic hierarchy pr</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN117610834A
source esp@cenet
subjects CALCULATING
CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER
COMPUTING
CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
COUNTING
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES
ELECTRICITY
GENERATION
PHYSICS
SYSTEMS FOR STORING ELECTRIC ENERGY
SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR
title Method for calculating extra equipment cost of industrial load participating in power grid demand side response
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-09T05%3A14%3A09IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20YONGCAN&rft.date=2024-02-27&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117610834A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true