Underwater pressure pipeline and construction method thereof

The invention relates to an underwater pressure pipeline and a construction method thereof, the pipeline comprises a pipeline body and at least one suspended matter sensor, at least the lowest position of the pipeline body is provided with four-way pieces, and each four-way piece corresponds to at l...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHANG ZHIQIAN, YANG LONGBIN, HONG YOUNG BOK, YANG MINGJIE, WU JIANLI, WU WEIMIN, LI HONGLU, CHI CHANGJIA, YAN JUNBIN, YAN XIAOYAN, GAO QINGFENG, HUANG FUXIANG, XIE WEI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHANG ZHIQIAN
YANG LONGBIN
HONG YOUNG BOK
YANG MINGJIE
WU JIANLI
WU WEIMIN
LI HONGLU
CHI CHANGJIA
YAN JUNBIN
YAN XIAOYAN
GAO QINGFENG
HUANG FUXIANG
XIE WEI
description The invention relates to an underwater pressure pipeline and a construction method thereof, the pipeline comprises a pipeline body and at least one suspended matter sensor, at least the lowest position of the pipeline body is provided with four-way pieces, and each four-way piece corresponds to at least one suspended matter sensor; the lower port of the four-way piece is blocked to form a sedimentation tank, and a probe of the suspended matter sensor is arranged in the sedimentation tank; the upper port of the four-way piece extends upwards to form an inspection well, and a blind plate is detachably plugged at the mouth of the inspection well; an exhaust pipe communicated with the inspection well is arranged on the blind plate, an upper end pipe opening of the exhaust pipe is always located above the water surface, and a host of the suspended matter sensor is arranged at the position of the upper end pipe opening of the exhaust pipe. The pipeline construction method comprises the steps of route design, pipeli
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117588628A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117588628A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117588628A3</originalsourceid><addsrcrecordid>eNrjZLAJzUtJLSpPLEktUigoSi0uLi1KVSjILEjNycxLVUjMS1FIzs8rLikqTS7JzM9TyE0tychPUSjJSC1KzU_jYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhuamFhZmRhaOxsSoAQBPwDC7</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Underwater pressure pipeline and construction method thereof</title><source>esp@cenet</source><creator>ZHANG ZHIQIAN ; YANG LONGBIN ; HONG YOUNG BOK ; YANG MINGJIE ; WU JIANLI ; WU WEIMIN ; LI HONGLU ; CHI CHANGJIA ; YAN JUNBIN ; YAN XIAOYAN ; GAO QINGFENG ; HUANG FUXIANG ; XIE WEI</creator><creatorcontrib>ZHANG ZHIQIAN ; YANG LONGBIN ; HONG YOUNG BOK ; YANG MINGJIE ; WU JIANLI ; WU WEIMIN ; LI HONGLU ; CHI CHANGJIA ; YAN JUNBIN ; YAN XIAOYAN ; GAO QINGFENG ; HUANG FUXIANG ; XIE WEI</creatorcontrib><description>The invention relates to an underwater pressure pipeline and a construction method thereof, the pipeline comprises a pipeline body and at least one suspended matter sensor, at least the lowest position of the pipeline body is provided with four-way pieces, and each four-way piece corresponds to at least one suspended matter sensor; the lower port of the four-way piece is blocked to form a sedimentation tank, and a probe of the suspended matter sensor is arranged in the sedimentation tank; the upper port of the four-way piece extends upwards to form an inspection well, and a blind plate is detachably plugged at the mouth of the inspection well; an exhaust pipe communicated with the inspection well is arranged on the blind plate, an upper end pipe opening of the exhaust pipe is always located above the water surface, and a host of the suspended matter sensor is arranged at the position of the upper end pipe opening of the exhaust pipe. The pipeline construction method comprises the steps of route design, pipeli</description><language>chi ; eng</language><subject>BLASTING ; ENGINEERING ELEMENTS AND UNITS ; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS ; HEATING ; INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIRCHEMICAL OR PHYSICAL PROPERTIES ; JOINTS OR FITTINGS FOR PIPES ; LIGHTING ; MEANS FOR THERMAL INSULATION IN GENERAL ; MEASURING ; MECHANICAL ENGINEERING ; PHYSICS ; PIPE-LINE SYSTEMS ; PIPE-LINES ; PIPES ; STORING OF DISTRIBUTING GASES OR LIQUIDS ; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING ; TESTING ; THERMAL INSULATION IN GENERAL ; WEAPONS</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240223&amp;DB=EPODOC&amp;CC=CN&amp;NR=117588628A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76418</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240223&amp;DB=EPODOC&amp;CC=CN&amp;NR=117588628A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG ZHIQIAN</creatorcontrib><creatorcontrib>YANG LONGBIN</creatorcontrib><creatorcontrib>HONG YOUNG BOK</creatorcontrib><creatorcontrib>YANG MINGJIE</creatorcontrib><creatorcontrib>WU JIANLI</creatorcontrib><creatorcontrib>WU WEIMIN</creatorcontrib><creatorcontrib>LI HONGLU</creatorcontrib><creatorcontrib>CHI CHANGJIA</creatorcontrib><creatorcontrib>YAN JUNBIN</creatorcontrib><creatorcontrib>YAN XIAOYAN</creatorcontrib><creatorcontrib>GAO QINGFENG</creatorcontrib><creatorcontrib>HUANG FUXIANG</creatorcontrib><creatorcontrib>XIE WEI</creatorcontrib><title>Underwater pressure pipeline and construction method thereof</title><description>The invention relates to an underwater pressure pipeline and a construction method thereof, the pipeline comprises a pipeline body and at least one suspended matter sensor, at least the lowest position of the pipeline body is provided with four-way pieces, and each four-way piece corresponds to at least one suspended matter sensor; the lower port of the four-way piece is blocked to form a sedimentation tank, and a probe of the suspended matter sensor is arranged in the sedimentation tank; the upper port of the four-way piece extends upwards to form an inspection well, and a blind plate is detachably plugged at the mouth of the inspection well; an exhaust pipe communicated with the inspection well is arranged on the blind plate, an upper end pipe opening of the exhaust pipe is always located above the water surface, and a host of the suspended matter sensor is arranged at the position of the upper end pipe opening of the exhaust pipe. The pipeline construction method comprises the steps of route design, pipeli</description><subject>BLASTING</subject><subject>ENGINEERING ELEMENTS AND UNITS</subject><subject>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</subject><subject>HEATING</subject><subject>INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIRCHEMICAL OR PHYSICAL PROPERTIES</subject><subject>JOINTS OR FITTINGS FOR PIPES</subject><subject>LIGHTING</subject><subject>MEANS FOR THERMAL INSULATION IN GENERAL</subject><subject>MEASURING</subject><subject>MECHANICAL ENGINEERING</subject><subject>PHYSICS</subject><subject>PIPE-LINE SYSTEMS</subject><subject>PIPE-LINES</subject><subject>PIPES</subject><subject>STORING OF DISTRIBUTING GASES OR LIQUIDS</subject><subject>SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING</subject><subject>TESTING</subject><subject>THERMAL INSULATION IN GENERAL</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLAJzUtJLSpPLEktUigoSi0uLi1KVSjILEjNycxLVUjMS1FIzs8rLikqTS7JzM9TyE0tychPUSjJSC1KzU_jYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhuamFhZmRhaOxsSoAQBPwDC7</recordid><startdate>20240223</startdate><enddate>20240223</enddate><creator>ZHANG ZHIQIAN</creator><creator>YANG LONGBIN</creator><creator>HONG YOUNG BOK</creator><creator>YANG MINGJIE</creator><creator>WU JIANLI</creator><creator>WU WEIMIN</creator><creator>LI HONGLU</creator><creator>CHI CHANGJIA</creator><creator>YAN JUNBIN</creator><creator>YAN XIAOYAN</creator><creator>GAO QINGFENG</creator><creator>HUANG FUXIANG</creator><creator>XIE WEI</creator><scope>EVB</scope></search><sort><creationdate>20240223</creationdate><title>Underwater pressure pipeline and construction method thereof</title><author>ZHANG ZHIQIAN ; YANG LONGBIN ; HONG YOUNG BOK ; YANG MINGJIE ; WU JIANLI ; WU WEIMIN ; LI HONGLU ; CHI CHANGJIA ; YAN JUNBIN ; YAN XIAOYAN ; GAO QINGFENG ; HUANG FUXIANG ; XIE WEI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117588628A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>BLASTING</topic><topic>ENGINEERING ELEMENTS AND UNITS</topic><topic>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</topic><topic>HEATING</topic><topic>INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIRCHEMICAL OR PHYSICAL PROPERTIES</topic><topic>JOINTS OR FITTINGS FOR PIPES</topic><topic>LIGHTING</topic><topic>MEANS FOR THERMAL INSULATION IN GENERAL</topic><topic>MEASURING</topic><topic>MECHANICAL ENGINEERING</topic><topic>PHYSICS</topic><topic>PIPE-LINE SYSTEMS</topic><topic>PIPE-LINES</topic><topic>PIPES</topic><topic>STORING OF DISTRIBUTING GASES OR LIQUIDS</topic><topic>SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING</topic><topic>TESTING</topic><topic>THERMAL INSULATION IN GENERAL</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG ZHIQIAN</creatorcontrib><creatorcontrib>YANG LONGBIN</creatorcontrib><creatorcontrib>HONG YOUNG BOK</creatorcontrib><creatorcontrib>YANG MINGJIE</creatorcontrib><creatorcontrib>WU JIANLI</creatorcontrib><creatorcontrib>WU WEIMIN</creatorcontrib><creatorcontrib>LI HONGLU</creatorcontrib><creatorcontrib>CHI CHANGJIA</creatorcontrib><creatorcontrib>YAN JUNBIN</creatorcontrib><creatorcontrib>YAN XIAOYAN</creatorcontrib><creatorcontrib>GAO QINGFENG</creatorcontrib><creatorcontrib>HUANG FUXIANG</creatorcontrib><creatorcontrib>XIE WEI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG ZHIQIAN</au><au>YANG LONGBIN</au><au>HONG YOUNG BOK</au><au>YANG MINGJIE</au><au>WU JIANLI</au><au>WU WEIMIN</au><au>LI HONGLU</au><au>CHI CHANGJIA</au><au>YAN JUNBIN</au><au>YAN XIAOYAN</au><au>GAO QINGFENG</au><au>HUANG FUXIANG</au><au>XIE WEI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Underwater pressure pipeline and construction method thereof</title><date>2024-02-23</date><risdate>2024</risdate><abstract>The invention relates to an underwater pressure pipeline and a construction method thereof, the pipeline comprises a pipeline body and at least one suspended matter sensor, at least the lowest position of the pipeline body is provided with four-way pieces, and each four-way piece corresponds to at least one suspended matter sensor; the lower port of the four-way piece is blocked to form a sedimentation tank, and a probe of the suspended matter sensor is arranged in the sedimentation tank; the upper port of the four-way piece extends upwards to form an inspection well, and a blind plate is detachably plugged at the mouth of the inspection well; an exhaust pipe communicated with the inspection well is arranged on the blind plate, an upper end pipe opening of the exhaust pipe is always located above the water surface, and a host of the suspended matter sensor is arranged at the position of the upper end pipe opening of the exhaust pipe. The pipeline construction method comprises the steps of route design, pipeli</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN117588628A
source esp@cenet
subjects BLASTING
ENGINEERING ELEMENTS AND UNITS
GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS
HEATING
INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIRCHEMICAL OR PHYSICAL PROPERTIES
JOINTS OR FITTINGS FOR PIPES
LIGHTING
MEANS FOR THERMAL INSULATION IN GENERAL
MEASURING
MECHANICAL ENGINEERING
PHYSICS
PIPE-LINE SYSTEMS
PIPE-LINES
PIPES
STORING OF DISTRIBUTING GASES OR LIQUIDS
SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING
TESTING
THERMAL INSULATION IN GENERAL
WEAPONS
title Underwater pressure pipeline and construction method thereof
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-08T15%3A23%3A08IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20ZHIQIAN&rft.date=2024-02-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117588628A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true