Prestress construction method and device

The invention provides a prestress construction method and device. The method comprises the steps that a flexible bag is pre-buried in the design position of a prestress steel beam; the flexible bag is filled with a fluid medium, so that the flexible bag expands, deforms and is supported in the conc...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG XIAOTANG, CAI QINHAO, LI JILONG, WANG XIONG, HU GUANGQUAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WANG XIAOTANG
CAI QINHAO
LI JILONG
WANG XIONG
HU GUANGQUAN
description The invention provides a prestress construction method and device. The method comprises the steps that a flexible bag is pre-buried in the design position of a prestress steel beam; the flexible bag is filled with a fluid medium, so that the flexible bag expands, deforms and is supported in the concrete; after the concrete is solidified and meets the expected requirement, the fluid medium in the flexible bag is discharged, so that the flexible bag is separated from the concrete; the flexible bag is taken out, and a prestress strand penetrating hole channel is formed; and a prestressed steel beam is placed in the prestressed beam penetrating hole channel, anchored and tensioned. According to the invention, the gas (liquid) bag is adopted to realize post-tensioning method post-strand pulling prestressed duct pore-forming. 本发明提供了一种预应力施工方法及装置,所述方法包括:将柔性囊预埋在预应力钢束的设计位置;向所述柔性囊内充入流体介质,以使所述柔性囊膨胀变形并支撑在混凝土内部;当混凝土凝固并达到预期要求后,排出所述柔性囊内的流体介质,以使所述柔性囊与混凝土脱离;取出所述柔性囊,形成预应力穿束孔道;以及将预应力钢束放置于所述预应力穿束孔道内,锚固并张拉。本发明采用气(液)囊实现后张法后穿束预应力孔道成
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117449584A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117449584A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117449584A3</originalsourceid><addsrcrecordid>eNrjZNAIKEotLgHiYoXk_DwgqzS5JDM_TyE3tSQjP0UhMS9FISW1LDM5lYeBNS0xpziVF0pzMyi6uYY4e-imFuTHpxYXJCan5qWWxDv7GRqam5hYmlqYOBoTowYAAkwovw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Prestress construction method and device</title><source>esp@cenet</source><creator>WANG XIAOTANG ; CAI QINHAO ; LI JILONG ; WANG XIONG ; HU GUANGQUAN</creator><creatorcontrib>WANG XIAOTANG ; CAI QINHAO ; LI JILONG ; WANG XIONG ; HU GUANGQUAN</creatorcontrib><description>The invention provides a prestress construction method and device. The method comprises the steps that a flexible bag is pre-buried in the design position of a prestress steel beam; the flexible bag is filled with a fluid medium, so that the flexible bag expands, deforms and is supported in the concrete; after the concrete is solidified and meets the expected requirement, the fluid medium in the flexible bag is discharged, so that the flexible bag is separated from the concrete; the flexible bag is taken out, and a prestress strand penetrating hole channel is formed; and a prestressed steel beam is placed in the prestressed beam penetrating hole channel, anchored and tensioned. According to the invention, the gas (liquid) bag is adopted to realize post-tensioning method post-strand pulling prestressed duct pore-forming. 本发明提供了一种预应力施工方法及装置,所述方法包括:将柔性囊预埋在预应力钢束的设计位置;向所述柔性囊内充入流体介质,以使所述柔性囊膨胀变形并支撑在混凝土内部;当混凝土凝固并达到预期要求后,排出所述柔性囊内的流体介质,以使所述柔性囊与混凝土脱离;取出所述柔性囊,形成预应力穿束孔道;以及将预应力钢束放置于所述预应力穿束孔道内,锚固并张拉。本发明采用气(液)囊实现后张法后穿束预应力孔道成</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; BUILDING MATERIALS ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING ; STRUCTURAL ELEMENTS</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240126&amp;DB=EPODOC&amp;CC=CN&amp;NR=117449584A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240126&amp;DB=EPODOC&amp;CC=CN&amp;NR=117449584A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG XIAOTANG</creatorcontrib><creatorcontrib>CAI QINHAO</creatorcontrib><creatorcontrib>LI JILONG</creatorcontrib><creatorcontrib>WANG XIONG</creatorcontrib><creatorcontrib>HU GUANGQUAN</creatorcontrib><title>Prestress construction method and device</title><description>The invention provides a prestress construction method and device. The method comprises the steps that a flexible bag is pre-buried in the design position of a prestress steel beam; the flexible bag is filled with a fluid medium, so that the flexible bag expands, deforms and is supported in the concrete; after the concrete is solidified and meets the expected requirement, the fluid medium in the flexible bag is discharged, so that the flexible bag is separated from the concrete; the flexible bag is taken out, and a prestress strand penetrating hole channel is formed; and a prestressed steel beam is placed in the prestressed beam penetrating hole channel, anchored and tensioned. According to the invention, the gas (liquid) bag is adopted to realize post-tensioning method post-strand pulling prestressed duct pore-forming. 本发明提供了一种预应力施工方法及装置,所述方法包括:将柔性囊预埋在预应力钢束的设计位置;向所述柔性囊内充入流体介质,以使所述柔性囊膨胀变形并支撑在混凝土内部;当混凝土凝固并达到预期要求后,排出所述柔性囊内的流体介质,以使所述柔性囊与混凝土脱离;取出所述柔性囊,形成预应力穿束孔道;以及将预应力钢束放置于所述预应力穿束孔道内,锚固并张拉。本发明采用气(液)囊实现后张法后穿束预应力孔道成</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>BUILDING MATERIALS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>STRUCTURAL ELEMENTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNAIKEotLgHiYoXk_DwgqzS5JDM_TyE3tSQjP0UhMS9FISW1LDM5lYeBNS0xpziVF0pzMyi6uYY4e-imFuTHpxYXJCan5qWWxDv7GRqam5hYmlqYOBoTowYAAkwovw</recordid><startdate>20240126</startdate><enddate>20240126</enddate><creator>WANG XIAOTANG</creator><creator>CAI QINHAO</creator><creator>LI JILONG</creator><creator>WANG XIONG</creator><creator>HU GUANGQUAN</creator><scope>EVB</scope></search><sort><creationdate>20240126</creationdate><title>Prestress construction method and device</title><author>WANG XIAOTANG ; CAI QINHAO ; LI JILONG ; WANG XIONG ; HU GUANGQUAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117449584A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>BUILDING MATERIALS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>STRUCTURAL ELEMENTS</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG XIAOTANG</creatorcontrib><creatorcontrib>CAI QINHAO</creatorcontrib><creatorcontrib>LI JILONG</creatorcontrib><creatorcontrib>WANG XIONG</creatorcontrib><creatorcontrib>HU GUANGQUAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG XIAOTANG</au><au>CAI QINHAO</au><au>LI JILONG</au><au>WANG XIONG</au><au>HU GUANGQUAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Prestress construction method and device</title><date>2024-01-26</date><risdate>2024</risdate><abstract>The invention provides a prestress construction method and device. The method comprises the steps that a flexible bag is pre-buried in the design position of a prestress steel beam; the flexible bag is filled with a fluid medium, so that the flexible bag expands, deforms and is supported in the concrete; after the concrete is solidified and meets the expected requirement, the fluid medium in the flexible bag is discharged, so that the flexible bag is separated from the concrete; the flexible bag is taken out, and a prestress strand penetrating hole channel is formed; and a prestressed steel beam is placed in the prestressed beam penetrating hole channel, anchored and tensioned. According to the invention, the gas (liquid) bag is adopted to realize post-tensioning method post-strand pulling prestressed duct pore-forming. 本发明提供了一种预应力施工方法及装置,所述方法包括:将柔性囊预埋在预应力钢束的设计位置;向所述柔性囊内充入流体介质,以使所述柔性囊膨胀变形并支撑在混凝土内部;当混凝土凝固并达到预期要求后,排出所述柔性囊内的流体介质,以使所述柔性囊与混凝土脱离;取出所述柔性囊,形成预应力穿束孔道;以及将预应力钢束放置于所述预应力穿束孔道内,锚固并张拉。本发明采用气(液)囊实现后张法后穿束预应力孔道成</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN117449584A
source esp@cenet
subjects BUILDING
BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE
BUILDING MATERIALS
FIXED CONSTRUCTIONS
FORMS
HANDLING BUILDING MATERIALS ON THE SITE
REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS
SCAFFOLDING
SHUTTERING
STRUCTURAL ELEMENTS
title Prestress construction method and device
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-20T15%3A47%3A45IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20XIAOTANG&rft.date=2024-01-26&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117449584A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true