Lock catch steel pipe pile cofferdam construction and inner support stress adjusting method
The invention discloses a lock catch steel pipe pile cofferdam construction and inner support stress adjusting method which comprises the steps that a steel casing in a cofferdam construction area is lengthened firstly, and a lowering system is installed at the top of the steel casing; the upper inn...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a lock catch steel pipe pile cofferdam construction and inner support stress adjusting method which comprises the steps that a steel casing in a cofferdam construction area is lengthened firstly, and a lowering system is installed at the top of the steel casing; the upper inner supporting structure is integrally assembled on site, and the lower inner supporting structure is assembled on site in a scattered mode. Then the upper inner supporting structure is placed to the designed elevation, a supporting piece is arranged on the outer side of the steel casing, and the supporting piece supports the upper inner supporting structure; steel pipe pile inserting and driving construction is conducted along the outer side of the upper inner supporting structure, and a cofferdam structure is defined by the multiple steel pipe piles; water pumping is conducted on the inner side of the cofferdam structure, the lower surrounding purlins are arranged on the inner side of the cofferdam structure in a |
---|