PHC slant socketed pile construction method

The invention relates to the technical field of cast-in-place concrete pile construction, in particular to a PHC slant socketed pile construction method which is used for PHC pipe pile and socketed core construction, the PHC pipe pile comprises a straight pile and an inclined pile, the inclined pile...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LUO XIAOCHUAN, WANG JUN, BI SHAOWEI, LIU JIANDONG, CHEN GANGQIANG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LUO XIAOCHUAN
WANG JUN
BI SHAOWEI
LIU JIANDONG
CHEN GANGQIANG
description The invention relates to the technical field of cast-in-place concrete pile construction, in particular to a PHC slant socketed pile construction method which is used for PHC pipe pile and socketed core construction, the PHC pipe pile comprises a straight pile and an inclined pile, the inclined pile and the straight pile of the PHC pipe pile are hit, pile sinking is completed, an inner hole of the PHC pipe pile is drilled through a percussion drill after pile sinking, and before drilling, the inner hole of the PHC pipe pile is drilled through a percussion drill; according to the construction method, a hollow hammer head and a construction device are improved, the construction process of the PHC slant socketed pile is smoothly completed, and the construction method comprises the steps of drilling, grouting, hole cleaning and inspection, reinforcement cage manufacturing, transportation and installation, socketed core concrete pouring and finally pile forming detection, and the construction method successfully s
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117364756A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117364756A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117364756A3</originalsourceid><addsrcrecordid>eNrjZNAO8HBWKM5JzCtRKM5Pzk4tSU1RKMjMSVVIzs8rLikqTS7JzM9TyE0tychP4WFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8c5-hobmxmYm5qZmjsbEqAEAUNQpZw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>PHC slant socketed pile construction method</title><source>esp@cenet</source><creator>LUO XIAOCHUAN ; WANG JUN ; BI SHAOWEI ; LIU JIANDONG ; CHEN GANGQIANG</creator><creatorcontrib>LUO XIAOCHUAN ; WANG JUN ; BI SHAOWEI ; LIU JIANDONG ; CHEN GANGQIANG</creatorcontrib><description>The invention relates to the technical field of cast-in-place concrete pile construction, in particular to a PHC slant socketed pile construction method which is used for PHC pipe pile and socketed core construction, the PHC pipe pile comprises a straight pile and an inclined pile, the inclined pile and the straight pile of the PHC pipe pile are hit, pile sinking is completed, an inner hole of the PHC pipe pile is drilled through a percussion drill after pile sinking, and before drilling, the inner hole of the PHC pipe pile is drilled through a percussion drill; according to the construction method, a hollow hammer head and a construction device are improved, the construction process of the PHC slant socketed pile is smoothly completed, and the construction method comprises the steps of drilling, grouting, hole cleaning and inspection, reinforcement cage manufacturing, transportation and installation, socketed core concrete pouring and finally pile forming detection, and the construction method successfully s</description><language>chi ; eng</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240109&amp;DB=EPODOC&amp;CC=CN&amp;NR=117364756A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240109&amp;DB=EPODOC&amp;CC=CN&amp;NR=117364756A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LUO XIAOCHUAN</creatorcontrib><creatorcontrib>WANG JUN</creatorcontrib><creatorcontrib>BI SHAOWEI</creatorcontrib><creatorcontrib>LIU JIANDONG</creatorcontrib><creatorcontrib>CHEN GANGQIANG</creatorcontrib><title>PHC slant socketed pile construction method</title><description>The invention relates to the technical field of cast-in-place concrete pile construction, in particular to a PHC slant socketed pile construction method which is used for PHC pipe pile and socketed core construction, the PHC pipe pile comprises a straight pile and an inclined pile, the inclined pile and the straight pile of the PHC pipe pile are hit, pile sinking is completed, an inner hole of the PHC pipe pile is drilled through a percussion drill after pile sinking, and before drilling, the inner hole of the PHC pipe pile is drilled through a percussion drill; according to the construction method, a hollow hammer head and a construction device are improved, the construction process of the PHC slant socketed pile is smoothly completed, and the construction method comprises the steps of drilling, grouting, hole cleaning and inspection, reinforcement cage manufacturing, transportation and installation, socketed core concrete pouring and finally pile forming detection, and the construction method successfully s</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNAO8HBWKM5JzCtRKM5Pzk4tSU1RKMjMSVVIzs8rLikqTS7JzM9TyE0tychP4WFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8c5-hobmxmYm5qZmjsbEqAEAUNQpZw</recordid><startdate>20240109</startdate><enddate>20240109</enddate><creator>LUO XIAOCHUAN</creator><creator>WANG JUN</creator><creator>BI SHAOWEI</creator><creator>LIU JIANDONG</creator><creator>CHEN GANGQIANG</creator><scope>EVB</scope></search><sort><creationdate>20240109</creationdate><title>PHC slant socketed pile construction method</title><author>LUO XIAOCHUAN ; WANG JUN ; BI SHAOWEI ; LIU JIANDONG ; CHEN GANGQIANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117364756A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>LUO XIAOCHUAN</creatorcontrib><creatorcontrib>WANG JUN</creatorcontrib><creatorcontrib>BI SHAOWEI</creatorcontrib><creatorcontrib>LIU JIANDONG</creatorcontrib><creatorcontrib>CHEN GANGQIANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LUO XIAOCHUAN</au><au>WANG JUN</au><au>BI SHAOWEI</au><au>LIU JIANDONG</au><au>CHEN GANGQIANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>PHC slant socketed pile construction method</title><date>2024-01-09</date><risdate>2024</risdate><abstract>The invention relates to the technical field of cast-in-place concrete pile construction, in particular to a PHC slant socketed pile construction method which is used for PHC pipe pile and socketed core construction, the PHC pipe pile comprises a straight pile and an inclined pile, the inclined pile and the straight pile of the PHC pipe pile are hit, pile sinking is completed, an inner hole of the PHC pipe pile is drilled through a percussion drill after pile sinking, and before drilling, the inner hole of the PHC pipe pile is drilled through a percussion drill; according to the construction method, a hollow hammer head and a construction device are improved, the construction process of the PHC slant socketed pile is smoothly completed, and the construction method comprises the steps of drilling, grouting, hole cleaning and inspection, reinforcement cage manufacturing, transportation and installation, socketed core concrete pouring and finally pile forming detection, and the construction method successfully s</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN117364756A
source esp@cenet
subjects EARTH DRILLING
EARTH DRILLING, e.g. DEEP DRILLING
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
MINING
OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title PHC slant socketed pile construction method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-05T05%3A33%3A39IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LUO%20XIAOCHUAN&rft.date=2024-01-09&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117364756A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true